Attachment L-C4 Sample of Completion Effort P-8.docx
DOCX document 13 KB Posted
- Attached to
- SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS) Federal contract opportunity
- Solicitation number
- N6134023R0058
View the file
Other files for this federal contract opportunity
Show all 50
SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample of Completion Effort Performance Based Statement of Work For SWMFTS Contract
1. Scope The Contractor shall provide Integrated Product Team (IPT) support for P-8 trainer IT. Analyzing and assessing Engineering Change Proposals (ECP), Airframe Changes (AFC), Rapid Action Maintenance/Minor Engineering Changes (RAMECs), Technical Equipment Change Directives (TECDs), Training Equipment Change Requests (TECRs), and other requirement documents to determine the validity, feasibility, resource requirements, and any potential impact to training systems. Assisting the Government with acceptance testing. This can range from small modifications to full complex training system with motion platforms. Perform and document SW cold starts and other SW related system testing. Assist in reviewing Contractor's data deliverable (CDRL items) and internal SW work products. Attend and contribute functional expertise in appropriate meetings. Monitoring and participate in the SW Physical Configuration Audit. Monitor the SW configuration management process applied and work products generated in the training system. Assist in the analysis of potential HW and/or SW requirements for modifications on training systems in the operational phase of the training system. Assist in updating the content of training systems technical data affected by modification, maintaining, and providing physical and configuration control of documentation, data, and media in the technical library. Provide support in developing and maintaining SW, HW, and technical data configuration management policies as well as procedures, and perform CM planning for SW, HW, and technical data. Implement the configuration management procedures established in the Government ISEO’s Configuration Management Plan for identification, evaluation, documentation and control of P-8 training system modifications. Develop and maintain SW build procedures for each P-8 device. This includes all procedures required to edit, compile, assemble, build, and link the SW undergoing development or modification. Support trainer SW releases by preparing cold start SW kit and the Computer SW Product End Items for each device. Provide technical support to Navy Warfare Development Command (NWDC, Navy Continuous Training Environment (NCTE) engineers to troubleshoot problems encountered with P-8 trainer connectivity issues and new trainer capabilities. Provide support for the procurement or requisition of equipment, parts, SW, and documentation related to P-8 trainer IT. This may include, but is not limited to, order processing, order tracking, inspection of goods received, and inventory management. The period of performance is 1 Jan 2019 through 31 October 2019. The support will be required at NAS Jacksonville FL.
File details come from the government source that posted it. Updated .