This document appears to be a set of drawings and construction notes related to a federal contract opportunity titled "Z1DA--Project No. 539-CSI-206 - CT Prep" issued by the Department of Veterans Affairs (VA) Veterans Health Administration.
The drawings cover the renovation of approximately 840 square feet of space within an existing 4-story VA medical facility in Cincinnati, Ohio. The work is focused on preparing an area for a new CT scanner, including demolition, new construction, mechanical, electrical, and fire protection work. Key details include compliance with the NFPA 101 Life Safety Code, accessibility requirements, and the need for the fire protection contractor's design to be reviewed by an independent fire protection engineer. The contract opportunity is a solicitation, with the solicitation number 36C25024B0070. No further details about the response or award dates, pricing, or set asides are provided in this document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment II - ICRA.pdf | ||
| Attachment I - Site Visit Sign In.pdf | ||
| 36C25024B0070 0002.docx | DOCX document | |
| 36C25024B0070 0001.docx | DOCX document | |
| Attachment V- RFI Form.pdf | ||
| 36C25024B0070_1.docx | DOCX document | |
| Attachment IV - Specs.pdf | ||
| Attachment I - DBA WD.pdf | ||
| Attachment II - Canon Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INTERIOR ELEVATION
SECTION/DETAIL NUMBER
DRAWING NUMBER
EQUIPMENT TAG
COLUMN GRID
NOTE
DOOR OPENING
ROOM NAME
ROOM NUMBER
WALL TYPE
CEILING HEIGHT
FINISH DESIGNATION
X
10'-8"
X
X
XX.X-X
X
X
A101
XX
TOILET ACCESSORY TAGX
A101
SIM
Ludlow Ave.
C lif to n A v e
CINCINNATI
STATE
TECH.
Hopple St.
M.L.K. Dr.
McMillan St.
UNIV. OF
CINCINNATI
W.H.T Rd.
VAMC
3200 VINE ST.
M.L.K. Dr.
V in e
S t.
ZOO
Jefferson A ve.
UNIV.
HOSPITAL
Mitchell Ave.
R ea di ng
R d.
V ic to ry
P kw
y. XAVIER
UNIV.
AREA OF WORK
C214, C214A, C214B, C215
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Department of Veterans Affairs Medical Center
HEAPY ENGINEERING
MECHANICAL ELECTRICAL COMMISSIONING TECHNOLOGY
1400 WEST DOROTHY LANE
DAYTON, OH 45409
937.224.0861 P
ARCHITECTURE PLANNING INTERIOR DESIGN
524 FERNWOOD AVENUE
ALTAMONTE SPRINGS, FLORIDA 32701
407.830.6522 P
RDC / JOHN POE ARCHITECTS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
TERRACON CONSULTING, INC.
ENVIRONMENTAL
611 LUNKEN PARK DRIVE
CINCINNATI, OH 45226
513.321.5816 P
ABOVE GROUP, INC.
STRUCTURAL ENGINEERING
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
/1
/2
:5
:2
P
M
VA Cincinnati CT Prep
04/18/2023
COVER SHEET
G001
ACDF
539-CSI-206
Cincinnati, OH
VA Cincinnati CT Prep
3200 Vine Street Cincinnati, OH 45220 PROJECT #: 539-CSI-206
Bid Documents 21027.00
G001 COVER SHEET
G100 CODE DATA
AD101 DEMOLITION PLAN
A101 NEW WORK PLAN AND DETAILS
A121 REFLECTED CEILING PLAN
A401 INTERIOR ELEVATIONS
AF101 FINISH PLANS AND DETAILS
F001 ABBREVIATIONS, LEGEND & DRAWING INDEX
FX102 PARTIAL SECOND FLOOR PLAN - FIRE SUPPRESSION
P001 ABBREVIATIONS, LEGEND & DRAWING INDEX
PP102 PARTIAL SECOND FLOOR PLAN - REMOVALS & NEW WORK
M001 ABBREVIATIONS, LEGEND & DRAWING INDEX
M102 PARTIAL SECOND FLOOR PLANS
M501 DETAILS & SCHEDULES
E001 ABBREVIATIONS, LEGEND & DRAWING INDEX
E102 PARTIAL SECOND FLOOR PLAN
E601 PANELBOARD SCHEDULES
GENERAL CONSTRUCTION NOTES
7. CONTRACTOR IS RESPONSIBLE TO VERIFY SIZES OF ALL EQUIPMENT, ETC. TO
BE INSTALLED AS PART OF THIS PROJECT, AND WHERE NECESSARY, MAKE
SPECIAL PROVISIONS TO INSTALL EQUIPMENT THAT IS TOO LARGE TO FIT
THROUGH FINISHED OPENINGS.
8. CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT TOILET ACCESSORIES,
HAND RAILS, BUMPER RAILS, SHELVING, CASEWORK, MOUNTING BRACKETS
AND OTHER WALL MOUNTED ITEMS, AS INDICATED IN THE CONTRACT
DOCUMENTS AND AS RECOMMENDED BY PRODUCT MANUFACTURERS. ALL
WOOD BLOCKING SHALL BE FIRE RETARDANT TREATED.
9. ALL EXPOSED NEW WORK IS TO RECEIVE NEW FINISHES UNLESS
SPECIFICALLY NOTED OTHERWISE. iF NO FINISH IS INDICATED AT A
PARTICULAR SURFACE, CONTRACTOR SHALL PROVIDE FINISH(S) AS
INDICATED AT SIMILAR CONDITIONS.
10. CONTRACTOR SHALL PROVIDE COMPLETE AND FULLY OPERATIONAL
SYSTEMS WHICH COMPLY WITH STATED CODES AND REGULATIONS. WHERE
THE OMISSION OF A PART OR ELEMENT OF A SYSTEM WOULD RESULT IN THE
NON-OPERATION, OR INCORRECT OPERATION OF A SYSTEM, CONTRACTOR
SHALL INCLUDE SAID PART OR ELEMENT AS PART OF THE WORK.
11. ALL PENETRATIONS THROUGH NEW AND/OR EXISTING SMOKE OR FIRE RATED
WALLS SHALL BE SMOKE/FIRE STOPPED AS REQUIRED BY THE RATING OF
THE WALL.
12. FIRE PROTECTION CONTRACTOR'S SPRINKLER DESIGN WILL BE SUBJECT TO
AN INDEPENDENT REVIEW BY A CERTIFIED FIRE PROTECTION ENGINEER
RETAINED BY THE OWNER. THE FIRE PROTECTION CONTRACTOR IS
RESPONSIBLE FOR MAKING ANY REQUIRED CHANGES TO THE DESIGN AS
IDENTIFIED BY THE OWNER'S FIRE PROTECTION ENGINEER AS NECESSARY
FOR COMPLIANCE WITH SPECIFIED NFPA REQUIREMENTS.
* PLEASE NOTE THAT THE TERM PROJECT ENGINEER REFERS TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (C.O.R.).
1. ALL WORK SHALL COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE,
INTERNATIONAL BUILDING CODE, AND OTHER COES AS IDENTIFIED IN VHA
PROGRAM GUIDE PG-18-3, TOPIC 01, CODES, STANDARDS AND EXECUTIVE
ORDERS WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERAN AFFAIRS,
TECHNICAL INFORMATION LIBRRARY WEBSITE.
2. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE LATEST
ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD (ABAAS) AND
DEPARTMENT OF VETERANS AFFAIRS BARRIER FREE DESIGN GUIDE PG-18-13
WHICH CAN BE FOUND ON THE DEPARTMENT OF VETERANS AFFAIRS
TECHNICAL INFORMATION LIBRARY WEBSITE.
3. CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT
EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS TO BE COORDINATED
WITH THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. CONTRACTOR IS RESPONSIBLE TO REPAIR AND/OR REFINISH, TO MATCH
ADJACENT EXISTING SURFACES, ANY EXISTING MATERIALS TO REMAIN THAT
ARE DAMAGED DURING THE COURSE OF DEMOLITION OR NEW WORK.
5. WHERE REMOVAL OF EXISTING WORK IS REQUIRED FOR INSTALLATION OF
NEW WORK, CONTRACTOR SHALL REPAIR EXISTING CONSTRUCTION TO
REMAIN OR PROVIDE NEW CONSTRUCTION TO MATCH EXISTING ADJACENT
SURFACES TO REMAIN.
6. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY ALL CONDITIONS AND
DIMENSIONS PRIOR TO ORDERING, FABRICATING OR INSTALLING NEW
MATERIALS.
DRAWING INDEX
GRAPHIC SYMBOLS
N N.T.S.Scale:
Vicinity Map
N N.T.S.Scale:
LEVEL 2 - Area Of Work
Revisions Date
0-HR Smoke Partition - [IBC 710] / NFPA 101-8.4
1-HR Smoke Barrier - [IBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [IBC 707] / NFPA 101-8.3
2-HR Fire Barrier - [IBC 707] / NFPA 101-8.3
Means of Egress
Existing Wall to Remain
New Wall
Fire Extinguisher
CODE LEGEND
F.E.
Smoke Compartment - 18,626 sf
Travel Dist. to Exit:
Max. Allowable = 200' per 19.2.5.7.3.3 (B,2) Actual= 118'-6"
Travel Dist. to Smoke Barrier:
Max. Allowable = 200' per 19.3.7.1 (2) Actual= 90'-6"
Travel Dist. to Exit Access Corridor:
Max. Allowable = 100' per 19.2.5.7.3.3 (A) Actual= 36'-0"
Area of Renovation - 840 sf
F.E.
F.E.
F.E.
F.E.
F.E.
F.E.
F.E.
F.E.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:5
:2
P
M
VA Cincinnati CT Prep
04/18/2023
CODE DATA
G100
ACDF
539-CSI-206
Cincinnati, OH
Bid Documents 21027.00
Code: NFPA 101 Life Safety Code (2021 Edition)
Construction Type: Type I (222)
Occupancy: Health Care Occupancy
Height: Partial 1 story renovation to existing 4 story building
Area of Work: 840 SF - CT Prep
Protection: Fully Suppressed
Chapter 4 - General
• 4.4.2.2 -Prescriptive-based life safety design meeting the requirements of Chapters 1 thru 3, Sections 4.5 thru 4.8, and
Chapters 6 thru 43 of this Code shall be deemed to satisfy the provisions of Sections 4.1 and 4.2.
• 4.4.2.3 -Where req’ts in Chapters 11 thru 43 differ from req’ts in Chapters 1 thru 4 and 6 thru 10, the req’ts of Chapters 11 thru
43 shall govern.
• 4.6.1.1 -The authority having jurisdiction (AHJ) shall determine whether the provisions of this Code are met.
• 4.6.7.1 -Rehabilitation category per 43.2.2.1.2 Renovation.
Chapter - 6 Classification of Occupancy and Hazard of Content
• 6.1.5 - Health Care Occupancy
• 6.2.2.1 -Hazard classification = Ordinary
Chapter 7 - Means of Egress
• 7.1.3.1 - Exit Access Corridors: 1/2 hr. fire rating is required for corridor walls per 19.3.6.2.2 (NO CHANGE)
• 7.3.1.2 – Occupant Load:
Second Floor (Renovation):
HC - Inpatient treatment Dept: 840 sf @ 240 sf/occ = 4 occup (NO CHANGE in area or occupant load)
• 7.3.2.2 – Max. projection within means of egress on ea. side: 4-1/2” (38” hgt. max.).
• 7.3.3.1 – Egress capacity (Health Care, sprinklered): (NO CHANGE in occupant load & egress capacity)
Table 7.3.3.1- Stairs = .3” per occup; Level components and ramps = .2” per occup.
• 7.4.1.2 – Min. number of means of egress from any story = 2.
(1) Occupant load >500 and <1,000 = 3 exits minimum. (NO CHANGE)
Chapter 8 - Features of Fire Protection:
• Table 8.3.3.2.2 – Min Fire Protection for Openings in Fire-rated Assemblies:
Component Walls Fire Drs Vision Panel (size) FR Vision Panel FR Window Vert. shafts 2 hr 1-1/2 hr Max tested D-H-90 NP (stairs, exits):
Fire Barriers: 2 hr 1-1/2 hr Max tested D-H-90 NP
1 hr 3/4 hr Max tested D-H-45 3/4 hr Smoke Barriers: 1 hr 1/3 hr Max tested D-20 3/4 hr
1/2 hr 1/3 hr Max tested D-20 1/3 hr Smoke Part'ns: 1 hr 1/3 hr Max tested D-20 3/4 hr
1/2 hr 1/3 hr Max tested D-20 1/3 hr
• 8.3.4.2.1 – Firestop Systems – Penetrations that pass thru a fire barrier shall be protected by a firestop system or device.
• 8.3.4.2.2 – The firestop system or device shall be tested in accordance with ASTM E814 or UL 1479.
• 8.3.4.8 – Openings thru fire barriers for air-handling ductwork or air movement shall be protected per 9.2.1.
• 8.4.1 - Smoke Partitions shall limit the transfer of smoke.
• 8.5.1 - Smoke Barriers shall restrict the transfer of smoke and have 1/2 hour fire resistance rating per 19.3.7.3 (1 hour provided).
• 8.5.3 - Fire Barriers that meet requirements of Section 8.5 shall be permitted to be used as a smoke barrier.
Chapter 9 - Building Service and Fire Protection Equipment
• 9.6.1.3 – Fire Alarm System req’d for life safety shall be per NFPA 70 (2020) and 72 (2019).
• 9.6.3.1 – Occupant notification shall be provided per 9.6.3 and 19.3.4.3.1.
• 9.6.3.5 – Where permitted by Chapters 11 thru 43, a positive alarm sequence shall be permitted per NFPA 72 (2019) (See 19.3.4.3).
• 9.6.4.1 – Emergency Forces notification req’d per 9.6.4 and 19.3.4.3.2.1.
• 9.6.5.1 – Emergency Control functions shall be installed per NFPA 72 (2019) as req’d per 9.6.5 and 19.3.4.4.
• 9.6.8.1 – Alarm annunciation is required per 9.6.8.
• 9.7.1.1 – Supervised automatic sprinkler system as req’d by 9.7.1 and 19.3.5.3 and shall comply with NFPA 13 (2019).
• 9.9 - Portable fire extinguishers shall be selected, installed, inspected, and maintained per NFPA 10 (2018).
Chapter 10 – Interior Finish, Contents, and Furnishings
• 10.2.2- Interior Finish Classification Limitations
Table A.10.2.2 - Interior Finish Classification Limitations: Health Care (Existing) Exit Access Corridors: Class A or B.
Other Spaces: Class A or B.
• 10.2.3.1.1 - Interior wall and ceiling finish materials shall be classified in accordance with NFPA 286 and comply with 10.2.3.2.
• 10.2.3.1.2 - Materials tested in accordance with 10.2.3.1.1 and complying with 10.2.3.2 shall also be considered to comply with the requirements of Class A in accordance with 10.2.3.3.
• 10.2.3.3 – Wall and Ceiling – Classifications characteristics:
(1) Class A: Flame spread: 0-25; Smoke dev.: 0-450.
(2) Class B: Flame spread: 26-75; Smoke dev.: 0-450.
(3) Class C: Flame spread: 76-200; Smoke dev.: 0-450.
• 10.2.3.3.1 – Existing interior finish exempt from smoke dev. criteria.
• 10.2.7.2 – Floor finish other than carpet: Min. Rad flux: .1 W/ cm².
• 10.2.8.1 – Wall and Ceiling finishes, where sprinkled:
Class C permitted in any location where Class B is req’d.
Class B permitted in any location where Class A is req’d.
• 10.2.8.2 – Floor finishes, where sprinkled:
Class II permitted in any location where Class I is req’d.
Provisions of 10.2.7.2 shall apply where Class II is req’d.
Chapter 19 - Existing Health Care Occupancies
• 19.1.1.1.4 - The area of work is an existing hospital and therefore falls under Chapter 19.
• 19.1.6.1 - Construction Type Limitations (Table 19.1.6.1): Type II (222), sprinklered, no story limitations.
• 19.1.7 - Occupant Load per Table 7.3.1.2. (NO CHANGE)
• 19.2.3.4 - Existing corridors required for exit access in hospitals shall be not less than 4 feet in clear width serving patient sleeping rooms. Actual: 8-0" (NO CHANGE).
• 19.2.5.3 - Dead end corridors shall not exceed 30’.
• 19.2.5.4 - Every corridor shall have access to not less than two approved exits without passing through any intervening spaces other than corridors or lobbies.
• 19.2.5.6.4 - Rooms within suites per 19.2.5.7 shall not be required to have an exit access door leading directly to an exit access corridor.
• 19.2.5.7.1.2 - Suite Separation – Suites shall be separated from remainder of the building by walls and doors (0-hr smoke partitions).
• 19.2.5.7.3.3 - Patient Care Non-Sleeping Suite Travel Distance
(A) Travel distance between any point in patient care non-sleeping suite and an exit access corridor: 100' (NO CHANGE)
(B) Travel distance between any point in non-sleeping suite and an exit: 200' (w/ sprinkler system). (NO CHANGE)
• 19.3.4.1 - Health care occupancies shall be provided with a fire alarm system per Section 9.6.
• 19.3.5.3 - Building containing hospitals shall be protected throughout by approved, supervised automatic sprinkler systems per
Section 9.7.
• 19.3.5.12 - Portable fire extinguishers shall be provided in all health care occupancies per Section 9.9.
• 19.3.6.2.2 - Corridor walls shall have min. 1/2 hour fire resistance rating. (NO CHANGE)
• 19.3.6.2.3 - Corridor walls shall form a barrier to limit the transfer of smoke but are not required to be smoke barriers or smoke partitions.
• 19.3.6.3.1 - Corridor doors shall be doors constructed to resist the passage of smoke.
Chapter 43 - Building Rehabilitation
• 43.1.2.1 - Any building undergoing repair, renovation, modification, or reconstruction shall comply with both of the following:
(1) Req'ts of the applicable existing occupancy chapters (Chapter 19).
(2) Req'ts of the applicable secton of this Chapter (Sections 43.4).
• 43.4.1.3 - Renovations, General Req'ts: All new work shall comply with the req'ts of other sections of this Code applicable to existing construction.
CODE NOTES
N Scale: 1/16" = 1'-0"
LIFE SAFETY PLAN - PARTIAL SECOND FLOOR
FD
S
S
S
Control
C215
CT Scanner
C214B
Prep. Rm.
C214
Tlt.
C214A
2.562.56
2.542.54
2.562.56
2.09
2.042.04
2.57
2.042.04
2.53
2.52
2.59
2.60
2.09
2.092.092.09
2.612.092.09 2.532.56
2.142.14
2.58 2.09
2.55
2.13
2.22
2.21
2.542.54
2.092.09
BID ITEM #2
Control
C215
CT Scanner
C214B
Prep. Rm.
C214 Tlt.
C214A
2.05
2.05
2.062.06
2.062.06
2.062.06
2.07
2.08
2.72
2.19
2.10 2.672.10
2.73
2.132.09
2.08
2.74
2.062.06 2.64
BID ITEM #2
2.72
2.062.062.062.06
2.20
2.64
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:5
:1
P
M
VA Cincinnati CT Prep
04/18/2023
DEMOLITION PLAN
AD101
ACDF
539-CSI-206
Cincinnati, OH
Bid Documents 21027.00
A. Remove all existing partitions shown with dashed line. Repair wall and floor finishes to match adjacent surfaces at areas of removal or scheduled new surfaces as required.
B. Prepare walls and floor slabs as required to receive new finish materials where existing finish is indicated to be removed.
C. Repair existing walls to match adjacent undisturbed wall where cabinets, countertops, etc. are shown to be removed.
D. See Plumbing, HVAC and Electrical Drawings for removal work associated with those trades.
E. Computer and communication cables and/or other wiring, piping, tubing, etc. serving other areas and functions located above ceiling or in walls of area to be remodeled shall be maintained during demolition/construction process. Coordinate any required changes to these systems with the C.O.R.
F. Owner's equipment vendor is responsible for removing existing floor- and ceiling-mounted imaging equipment.
G. Infill unused floor penetrations with concrete to be flush with existing slab. Prep for new floor finish.
2.04 Existing floor finish to remain. Protect in place during construction.
2.05 Existing gypsum board ceiling/soffit to remain. Protect in place and repair and paint any damage during construction.
2.06 Existing suspended ceiling system, fixtures, and devices to remain.
2.07 Existing patient lift rail and support framing to remain.
2.08 Remove and salvage existing suspended ceiling tile and
grid for reinstallation as required for above-ceiling access to equipment support framing.
2.09 Existing casework to remain. Protect in place during
construction.
2.10 Remove and salvage above-ceiling patient lift support
framing components as required.See structural drawings.
2.13 Remove existing wall and base cabinet units as shown.
2.14 Existing floor pentration to remain.
2.19 Existing equipment to remain. Protect in place.
2.20 Existing ceiling-mounted equipment to be removed and
replaced by Owner's Vendor.
2.21 Existing floor-mounted equipment to be removed by
Owner's Vendor.
2.22 Remove and salvage existing faucet set and drain fittings for reinstallation. See Plumbing drawings.
2.52 Remove existing wall tile and coved tile base.
2.53 Remove existing 1x1 tile flooring. Prep floor to receive new finishes.
2.54 Remove existing VCT floor finish and rubber base. Prep
floor to receive new finishes.
2.55 Remove existing solid surface countertop and
backsplash.
2.56 Remove existing sheet vinyl floor finish and integral cove base. Prep floor to receive new finishes.
2.57 Remove existing epoxy floor leveling pad. Prepare
subfloor for new schedule finish and base.
2.58 Remove existing integral solid surface sink.
2.59 Remove and salvage all wall-mounted plumbing fixtures
for reinstallation. See Plumbing drawings.
2.60 Remove and salvage all existing wall-mounted grab bars
and toilet room accessories for reinstallation.
2.61 Remove existing mirror.
2.64 Remove and salvage existing acoustical ceiling tile and
grid, light fixtures, and other ceiling mounted devices for reinstallation following above-ceiling work.
2.67 Remove existing patient lift travel rail.
2.72 Remove existing ACT ceiling. Salvage and reinstall all
existing fixtures and devices. See Electrical and Mechanical Drawings.
2.73 Remove and salvage existing patient lift motor for
reinstallation.
2.74 Remove and salvage existing fixed patient lift rail for
relocation.
PLAN NOTES
GENERAL DEMOLITION NOTES
N Scale: 1/4" = 1'-0"1
DEMOLITION PLAN
N Scale: 1/4" = 1'-0"2
CEILING DEMOLITION PLAN
10.
Pa.
P.
Q.
Ra.
10.6.8.7.
Control
C215
CT Scanner
C214B
Prep. Rm.
C214 Tlt.
C214A
A401
11.11
11.5211.52 11.52
A
11.03
11.52
2.09
2.092.09
2.09
2.09
6' - 11"
22.07 12.13
26.02
2.14
2.14
6.04
9.01
12.01
11.5211.5211.5211.52
A401
A401
A
A401
A
.0
11.03
BID ITEM #2
10.
Pa.
P.
Q.
Ra.
10.6.8.7.
AREA OF
WORK ABOVE
26.01
(Second Floor)
11.03
AREA OF
WORK ABOVE
2.64
A. CODES AND SPECIFICATIONS
1. 2021 INTERNATIONAL BUILDING CODE.
2. ASCE/SEI 7-10, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES.
3. ANSI/AISC 303-16, CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES AS MODIFIED BY THE CONSTRUCTION DOCUMENTS.
4. ANSI/AWS D1.1, STRUCTURAL WELDING CODE – STEEL.
5. ADDITIONAL TECHNICAL SPECIFICATIONS IN THE PROJECT MANUAL.
B. DESIGN LOADS
1. FLOOR LOAD:
TYPICAL FLOOR LIVE LOAD: 150 PSF, 3000 LBS CONCENTRATED
2. SPECIAL LOADS AND/OR DESIGN DATA:
C. STRUCTURAL STEEL
1. ALL WORK SHALL CONFORM TO AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) STANDARDS AND THE PROJECT SPECIFICATIONS.
2. FABRICATOR SHALL MEET AISC CERTIFICATION STANDARD FOR STEEL BUILDING STRUCTURES PER THE PROJECT SPECIFICATIONS.
3. MATERIAL:
a. OTHER ROLLED SHAPES, PLATES AND BARS: ASTM A36 (Fy 36 KSI).
b. BOLTS: ASTM A325, 3/4" MIN. DIA., U.N.O.
4. ALL WELDING MATERIALS, WELDING PROCEDURES AND OPERATORS PERFORMING WELDING TO BE QUALIFIED PER AWS D1.1.
5. PRIME PAINTING IS REQUIRED FOR ALL STEEL WHICH WILL BE VISIBLE IN THE COMPLETED BUILDING AND IS NOT SCHEDULED TO RECEIVE FIRE PROOFING. PREPARE BY POWER TOOL CLEANING TO SSPC-SP3, MINIMUM. FOLLOW ADDITIONAL REQUIREMENTS OF AISC SPECIFICATIONS AND THE PROJECT SPECIFICATIONS FOR ARCHITECTURALLY EXPOSED STRUCTURAL STEEL (AESS). REFER TO ARCHITECTURAL DRAWINGS FOR LOCATIONS. VERIFY PRIMER COMPATIBILITY WITH FIELD APPLIED TOPCOATS.
D. POST-INSTALLED ANCHORS AND ADHESIVE ANCHORING TO CONCRETE
1. POST-INSTALLED ANCHORS AND ADHESIVE ANCHORING SYSTEMS MUST BE TESTED AND APPROVED USING ICC EVALUATION SERVICE ACCEPTANCE CRITERIA, INCLUDING ICC-ES AC193: “MECHANICAL ANCHORS IN CONCRETE ELEMENTS” OR ICC-ES AC308: “POST-INSTALLED ADHESIVE ANCHORS IN CONCRETE ELEMENTS”. CONCRETE SHALL BE CONSIDERED CRACKED. SUBMIT MANUFACTURER’S DATA AND EVALUATION REPORT (ESR) FOR PROPOSED ANCHORS, ADHESIVES, AND ANCHORING SYSTEMS. INDICATE
SPECIFIC PROJECT LOCATIONS AND CONDITIONS WHERE PROPOSED FOR USE.
2. MECHANICAL ANCHORS TO CONCRETE SHALL BE AS SHOWN IN THE STRUCTURAL DETAILS. UNLESS NOTED OTHERWISE, USE ONE OF THE FOLLOWING:
a. HILTI KWIK BOLT TZ EXPANSION ANCHORS.
b. POWERS POWER-STUD+ SD2 WEDGE EXPANSION ANCHORS.
c. SIMPSON STRONG-BOLT 2 WEDGE ANCHORS.
3. ADHESIVE ANCHORING SHALL NOT BE USED IN OVERHEAD OR UPWARD CONDITIONS. USE HYBRID ADHESIVE WITH ESR FOR HORIZONTAL CONDITIONS.
4. POST-INSTALLED ANCHORS SHALL ONLY BE USED AS SHOWN AND APPROVED; THEY SHALL NOT BE USED WHERE CAST-IN-PLACE ANCHORS ARE REQUIRED.
5. ZINC COAT ANCHORS, RODS AND HARDWARE TYPICALLY. AT EXTERIOR USE HOT DIP GALVANIZED OR STAINLESS STEEL, UNLESS NOTED OTHERWISE.
6. EMBEDMENT DEPTH, EDGE DISTANCES, AND SPACING ARE CRUCIAL. LOCATE AS SHOWN ON THE DRAWINGS. WHERE NOT SHOWN, EMBED REBAR 24 DIAMETERS AND EMBED ANCHORS AT LEAST 8 DIAMETERS, WITH EDGE DISTANCES AT LEAST 8 DIAMETERS, AND SPACING AT LEAST 12 DIAMETERS. USE MANUFACTURER’S DATA TO CALCULATE REDUCED CAPACITY FOR ACTUAL CONDITIONS AND CONFIRM AN ULTIMATE SAFETY FACTOR OF AT LEAST 4.0.
7. HOLES INTO CONCRETE MUST NOT INTERFERE WITH REINFORCING BARS. THE CONTRACTOR SHALL REVIEW THE STRUCTURAL DRAWINGS AND USE FERRO-SCAN OR OTHER MEANS TO LOCATE REINFORCING BARS IN THE AREA. SPACE HOLES TO FIT AROUND REBAR, SET ANCHORS WITH A TEMPLATE AND FABRICATE FIXTURE TO MATCH.
8. HOLES IN CONCRETE SHALL BE THE PROPER SIZE AND THOROUGHLY CLEANED WITH ALL DUST REMOVED. DRILL HOLES USING A HOLLOW BIT AND FUNCTIONING VACUUM SYSTEM, THEN BRUSH AND BLOW OUT REPEATEDLY WITH CLEAN, OIL FREE AND DRY, HIGH PRESSURE COMPRESSED AIR.
9. INSTALL INTO DRY CONCRETE IN CLEAN, DUST FREE HOLES USING METHOD AND PROCEDURE THAT MEETS MANUFACTURER’S RECOMMENDATIONS INCLUDING TEMPERATURE RANGE, HUMIDITY, INSTALLATION TIME AND CURE TIME. FOLLOW THE MANUFACTURER’S PRINTED INSTALLATION INSTRUCTIONS.
10. PROVIDE STANDARD SIZE HOLES IN THE FASTENED STEEL ELEMENT (1/16” LARGER THAN THE ROD DIAMETER) TO MATCH TEMPLATE OF INSTALLED ANCHORS. DO NOT OVERSIZE
HOLES.
11. THE CONTRACTOR SHALL ARRANGE FOR A REPRESENTATIVE OF THE MANUFACTURER TO PROVIDE ONSITE INSTALLATION TRAINING FOR THEIR PRODUCTS. ADHESIVE ANCHOR INSTALLERS SHALL ALSO BE CERTIFIED BY A RECOGNIZED PROGRAM, SUCH AS BY ACI AND CRSI. SUBMIT DOCUMENTATION OF TRAINING AND CERTIFICATION OF PERSONNEL
PRIOR TO PERFORMING SUCH WORK. PROVIDE COPY TO THE OWNER’S INSPECTION AGENCY.
12. THE CONTRACTOR SHALL INSPECT AND PROOF TEST ANCHORS AS PART OF THE CONTRACTOR’S QUALITY CONTROL PROGRAM. INSPECT CONTINUOUSLY OR PERIODICALLY ACCORDING TO THE ESR. PROOF TEST 5% OF ALL ANCHORS AND REBAR IN EACH CONDITION, DISTRIBUTED THROUGHOUT THE PROJECT, AND TEST ALL ANCHORS IN EACH STEEL FRAMING CONNECTION. AMOUNT OF TESTING SHALL BE INCREASED IF FAILURES OCCUR. OWNER’S INSPECTION AGENCY WILL OBSERVE INSTALLATION FOR CONFORMANCE WITH MANUFACTURER’S RECOMMENDATIONS AND WILL WITNESS CONTRACTOR’S PROOF TESTING.
E. FIREPROOFING
13. ALL LOAD BEARING METAL STRUCTURAL FRAMING OR CONSTRUCTION DAMAGED AREAS REQUIRE SPRAY-ON FIREPROOFING OR FIRE RATED ENCLOSURE. REFER TO THE
PROJECT SPECIFICATION AND ARCHITECTURAL DRAWINGS FOR SPECIFIC REQUIREMENTS.
F. COORDINATION AND CONSTRUCTION
1. THE CONTRACTOR SHALL COMPLETE ALL WORK REQUIRED AND NECESSARY FOR THE PROJECT IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, DRAWINGS, AND REFERENCED STANDARDS. THE SPECIFICATIONS AND DRAWINGS COMPLEMENT EACH OTHER, THE CONTRACTOR SHALL THOROUGHLY REVIEW BOTH BEFORE PROCEEDING
WITH ANY WORK.
2. UNLESS OTHERWISE NOTED, DETAILS, SECTIONS AND NOTES ON THE STRUCTURAL DRAWINGS ARE INTENDED TO APPLY TO SIMILAR SITUATIONS ELSEWHERE.
3. STRUCTURAL FRAMING PLANS ARE TYPICALLY DRAWN AS REFLECTED PLANS SHOWING BEAMS, WALLS, AND COLUMNS ON THE UNDERSIDE OF THE LEVEL SHOWN.
4. ALL FRAMING MEMBERS PROVIDED FOR EQUIPMENT SUPPORT ARE FOR BIDDING PURPOSES ONLY. SUBMIT MANUFACTURER'S DATA FOR THE ACTUAL PROPOSED EQUIPMENT TO STRUCTURAL ENGINEER FOR VERIFICATION OR REDESIGN OF SUPPORTS PRIOR TO PREPARING SHOP DRAWINGS.
5. SEE ARCHITECTURAL AND MECHANICAL DRAWINGS FOR ADDITIONAL DETAILS, DIMENSIONS. OPENING SIZES AND LOCATIONS FOR PIPES, DUCTS, ETC., WHEN SHOWN, ARE FOR GENERAL INFORMATION ONLY AND SHALL BE VERIFIED WITH MECHANICAL, ELECTRICAL, PLUMBING AND OTHER COORDINATION DRAWINGS AS APPLICABLE.
6. SHOP DRAWINGS AND INSTALLATION DRAWINGS SHALL BE PREPARED AND SUBMITTED FOR REVIEW. SUBMITTALS PREPARED BY SUPPLIERS AND SUB CONTRACTORS SHALL BE REVIEWED BY THE TRADE CONTRACTOR AND GENERAL CONTRACTOR OR CONSTRUCTION MANAGER PRIOR TO SUBMITTING TO ARCHITECT/ENGINEER.
a. FIELD VERIFY ALL EXISTING DIMENSIONS, ELEVATIONS AND CONDITIONS WHICH AFFECT FABRICATION AND SHOW ON SHOP DRAWINGS.
b. SUBMIT COMPLETE SHOP DRAWINGS WITH MANUFACTURERS’ DATA, ETC. SHOW ALL CONNECTIONS AND DETAILS NECESSARY TO FULLY DESCRIBE AND PROPERLY INSTALL
THE WORK.
c. STRUCTURAL ENGINEER’S REVIEW SHALL BE FOR GENERAL ARRANGEMENT AND CONFORMANCE WITH THE STRUCTURAL INTENT ONLY.
7. THE SPECIFICATIONS AND STRUCTURAL DRAWINGS TYPICALLY REFER TO THE FINISHED STRUCTURE. UNLESS NOTED OTHERWISE, THEY DO NOT PRESCRIBE THE METHOD
OF CONSTRUCTION.
8. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
WORKING HOURS.
9. THE ARCHITECT’S AND ENGINEER’S OBSERVATION AND REVIEW OF CONTRACTORS’ PERFORMANCE DOES NOT INCLUDE REVIEW OF ADEQUACY OF CONTRACTOR'S SAFETY
MEASURES IN, ON, OR NEAR THE CONSTRUCTION SITE.
G. MECHANICAL AND OTHER ITEMS EMBEDDED IN OR SUPPORTED FROM STRUCTURE
1. ALL TRADE CONTRACTORS (MECHANICAL, SPECIALTY, ETC.) ARE TO DESIGN THEIR SYSTEMS, INCLUDING ATTACHMENTS TO THE BUILDING’S STRUCTURE WITHIN THE
FOLLOWING LIMITATIONS.
a. LOADS ARE TO BE DISTRIBUTED TO THE STRUCTURE IN A MANNER THAT DOES NOT EXCEED THE LOAD ALLOWANCES NOTED UNDER DESIGN LOADS AND SHALL NOT
OVERLOAD OR DAMAGE THE STRUCTURE.
b. ANCHORS ARE TO HAVE AN ULTIMATE SAFETY FACTOR OF AT LEAST 4.0.
c. LOADS SUPPORTED BY WIDE FLANGE BEAMS ARE TO BE APPLIED IN A MANNER WHICH DOES NOT CAUSE TORSION ABOUT THE LONGITUDINAL AXIS OF THE BEAM.
2. THE SIZE AND LOCATION OF EQUIPMENT AND OTHER ITEMS MUST BE COORDINATED WITH SUPPORTING STRUCTURE. TRADE CONTRACTOR(S), GENERAL CONTRACTOR AND CONSTRUCTION MANAGER MUST ENSURE ACCURATE DIMENSIONAL INFORMATION IS PROVIDED TO STEEL FABRICATOR PRIOR TO FABRICATION.
3. UNLESS OTHERWISE NOTED, DO NOT HANG OR OTHERWISE SUPPORT ANY ITEMS FROM METAL DECKS. USE CONCRETE ANCHORS TO SUPPORT FROM CONCRETE SLABS CAST
ON METAL DECK.
H. QUALITY CONTROL AND ASSURANCE
1. THE CONTRACTOR SHALL PERFORM QUALITY CONTROL, TESTING AND INSPECTION OF ALL WORK AS REQUIRED BY THE CONTRACT DOCUMENTS, INCLUDING REFERENCED
CODES, SPECIFICATIONS AND STANDARDS.
2. THE CONTRACTOR WILL EMPLOY A TESTING AND INSPECTION AGENCY TO PERFORM SERVICES INDICATED IN THE PROJECT SPECIFICATIONS.
3. THE CONTRACTOR WILL ALSO EMPLOY QUALIFIED SPECIAL INSPECTORS TO PERFORM INSPECTIONS IN ACCORDANCE WITH CHAPTER 17 OF THE BUILDING CODE AND SPECIFICATION SECTION 014535. THE CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL INSPECTIONS AND TESTS. ITEMS REQUIRING SPECIAL INSPECTION ON THIS
PROJECT INCLUDE:
a. STRUCTURAL STEEL: ALL WELDING AND HIGH STRENGTH BOLTING.
4. THE STRUCTURAL ENGINEER MAY GENERALLY OBSERVE THE PROGRESS OF THE WORK, BUT HIS OBSERVATION SHALL NOT BE CONSTRUED AS INSPECTION.
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:5
:0
P
M
VA Cincinnati CT Prep
04/18/2023
NEW WORK PLAN AND DETAILS
A101
JWDF
539-CSI-206
Cincinnati, OH
Bid Documents 21027.00
N Scale: 1/4" = 1'-0"2
NEW WORK PLAN - SECOND FLOOR
A. All dimensions are taken to face of gypsum wallboard or unit masonry.
B. All wood blocking to be fire retardent treated.
C. Repair and fill all existing floor penetrations. Contractor shall prepare concrete floor slab surface as required to meet Equipment Vendor's floor condition requirements.
D. Owner's Equipment Vendor is responsible for providing and installing new medical equipment. Contractor to provide, install, and test floor expansion anchors. Expansion bolts: 3.9" min. embed. Contractor shall coordinate with C.O.R. and equipment vendor to ensure all installation requirements and conditions are provided.
E. Existing Second Floor is 6" depth which includes composite metal deck. Bot. reinf.: #4 @ 12". Top reinf: #4 @ 24" alternate, 12" @ supports. T/Slab elev. = 739'-11".
F. Existing lead-shielding in walls, doors, and windows to be maintained. Repair and restore lead-shielding at new and existing wall penetrations.
2.09 Existing casework to remain. Protect in place during
construction.
2.14 Existing floor pentration to remain.
2.64 Remove and salvage existing acoustical ceiling tile and
grid, light fixtures, and other ceiling mounted devices for reinstallation following above-ceiling work.
6.04 1" plastic laminate end panel. Match profile and finish of existing cabinetry.
9.01 Repair and paint wall at removed casework.
11.03 Prep floor slab as required for owner's vendor to install epoxy resin leveling pad over exposed concrete floor surface. See vendor drawings for details.
11.11 Center/reference point for equipment installation. See
Medical Equipment Vendor Drawings.
11.52 Equipment provided & installed by Owner's Vendor. See
Vendor Drawings for details.
12.01 New integral solid surface sink bowl.
12.13 New solid surface countertop with 4" H. backspash.
22.07 Install salvaged faucet set. Reconnect plumbing supply
and drain. See Plumbing drawings.
26.01 Existing electrical duct/cable tray. See Electrical Drawings
26.02 Existing raceway to remain. See Electrical Drawings.
NOTES
GENERAL NOTES
N Scale: 1/4" = 1'-0"1
NEW WORK PLAN - FIRST FLOOR
General Structural Notes
S
S
S
S
AREA OF
WORK ABOVE
2.64
11.03
(Second Floor)
Q
2.64
5.12
7.04
AREA OF
WORK ABOVE
REFLECTED CEILING PLAN LEGEND
Recessed downlight fixture
Supply Air Diffuser
Return Air Grille
2' x 4' light fixture
2' x 2' acoustical tile ceiling
Gypsum board ceiling / soffit - painted
Access panel
Surface-mounted strip light fixture
2-way in-ceiling speakerS
Sprinkler head
Control
C215
CT Scanner
C214B
Prep. Rm.
C214
Tlt.
C214A
2.05
2.08
2.05
2.062.06 2.062.06
2.062.06
5.17
2.07
11.52
5.17
5.10
2.23
6.01
2.08
2.19
2.73
11.05
11.06
2.062.06
A121
2.64
ACT-2
7'-5 3/4"
7'-11"
8'-7 3/4"
23.01
BID ITEM #2
7'-5 3/4"
2.062.06
2.64
2.24
8'-10 3/4" (F.V.)
BOT. OF FRAMING
8'-9 3/4" (F.V.)
BOT. OF PLATE
8'-7 3/4" (F.V.)
FIN. CLG.
2.08
5.10
5.18
5.17
11.52
M a x
2.23
5.17
6" 6"
EXISTING W12x19 BEAM
3/8" x 5" x 1'-6" PLATE
3/16"
1'-6"
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:5
:0
P
M
VA Cincinnati CT Prep
04/18/2023
REFLECTED CEILING PLAN
A121
JWDF
539-CSI-206
Cincinnati, OH
Bid Documents 21027.00
N Scale: 1/4" = 1'-0"1
REFLECTED CEILING PLAN - FIRST FLOOR
A. All wood blocking shall be fire retardant.
B. Repair damage to spray-applied fireproofing where new connections to existing steel are required. Maintain existing 2-hr fire rating.
C. See P, M, E and FP drawings for additional information regarding final information and quantites of fixtures/devices to be installed in ceiling.
D. See Electrical Drawings for lighting specifications.
E. All gypsum board ceilings to be painted P-3 unless noted otherwise.
F. All ACT shall be ACT-1 unless noted otherwise.
G
Existing Third Floor above is 3-1/4" lightweight conc. slab w/ mesh 6x6 - w2.9 x w2.9 atop 1-1/2" -20 ga. galv. composite deck. Total Deck = 4-3/4". T/Slab elev. = 751'-11".
2.05 Existing gypsum board ceiling/soffit to remain. Protect in place and repair and paint any damage during construction.
2.06 Existing suspended ceiling system, fixtures, and devices to remain.
2.07 Existing patient lift rail and support framing to remain.
2.08 Remove and salvage existing suspended ceiling tile and grid for reinstallation as required for above-ceiling access to equipment support framing.
2.19 Existing equipment to remain. Protect in place.
2.23 Existing support framing to remain.
2.24 No new hangers shall be attached to bottom flange of existing steel beam in the area of existing pipe penetration thru web.
2.64 Remove and salvage existing acoustical ceiling tile and grid, light fixtures, and other ceiling mounted devices for reinstallation following above-ceiling work.
2.73 Remove and salvage existing patient lift motor for
reinstallation.
5.10 New mounting plate provided by Owner's vendor, installed by G.C.
5.12 Install welded plate repair to underside of existing beam per Detail 4/A121.
5.17 Remove/respace existing Uni-strut component as required for new mounting plate installation.
5.18 Shim as required.
6.01 New wall cabinet.
7.04 Remove existing spray-applied fire proofing and prep steel beam surface as required. Following welding work, repair/reinstall spray-applied fire proofing to maintain existing 2-hr fire rating.
11.03 Prep floor slab as required for owner's vendor to install epoxy resin leveling pad over exposed concrete floor surface. See vendor drawings for details.
11.05 New patient lift traveling rail.
11.06 Install salvaged fixed patient lift rail and new support framing.
11.52 Equipment provided & installed by Owner's Vendor. See
Vendor Drawings for details.
23.01 Relocate mechanical device. See Mechanical Drawings.
PLAN NOTES
GENERAL NOTES
N Scale: 1/4" = 1'-0"2
REFLECTED CEILING PLAN - SECOND FLOOR
Scale: 6" = 1'-0"3
DETAIL AT CEILING MOUNT
Revisions Date
Scale: 6" = 1'-0"4
PLAN DETAIL AT BEAM REPAIR (LOOKING AT UNDERSIDE OF BEAM)
11.5211.5211.5211.52
2.092.092.09
2.09
9.16
2' - 9" 3' - 0"
" 1
/4
2.09
2.092.09
6.04
22.07
2.05 2.096.01
Filler 2' - 9"
1"
6.03
6.04
W1
A401
A
A401
A 1 Tlt.
C214A
C214A 2.59
2.59
2.602.60
2.59
CT-1
CTB-1
2.602.60
2.59
CTB-1
CT-1
A
2.59
CT-1
CTB-1
2.602.59
C214A
CTB-1
CT-1
8"
1' - 0"
3' - 0"
Note: Flush valve located on accessible side
6"
1' - 6"
M
IN
Note:
Beginning of reflective surface
MIN.
7"
T o D is p e n s e r
O p e n in g
T o O p e ra b le
M e c h a n is m
Finish Floor
A
Finish Floor
12.13
22.06
VERIFY IN FIELD
V E
R
IF
Y I N
F
IE
L D
12.13
2.09
22.08
SS-1
1'-2" 1"
26.01
12.29
12.30
12.31
12.22
12.21
9.27
PL-1
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:5
:1
P
M
VA Cincinnati CT Prep
04/18/2023
INTERIOR ELEVATIONS
A401
JWDF
539-CSI-206
Cincinnati, OH
Bid Documents 21027.00
2.05 Existing gypsum board ceiling/soffit to remain. Protect in place and repair and paint any damage during construction.
2.09 Existing casework to remain. Protect in place during
construction.
2.59 Remove and salvage all wall-mounted plumbing fixtures for reinstallation. See Plumbing drawings.
2.60 Remove and salvage all existing wall-mounted grab bars
and toilet room accessories for reinstallation.
6.01 New wall cabinet.
6.03 New solid surface countertop with 4" high backsplash.
6.04 1" plastic laminate end panel. Match profile and finish of existing cabinetry.
9.16 Paint existing wall mounted electrical raceway and new
covers to match wall finish.
9.27 Gypsum board soffit.
11.52 Equipment provided & installed by Owner's Vendor. See
Vendor Drawings for details.
12.13 New solid surface countertop with 4" H. backspash.
12.21 Plastic laminate over 3/4" particle board.
12.22 Adjustable shelf. Plastic laminate over 3/4" particle board.
12.29 4" wire pull. [Recessed pull.]
12.30 Self-latching, key-operated lock.
12.31 Concealed hinge.
22.06 Undermount solid surface sink bowl.
22.07 Install salvaged faucet set. Reconnect plumbing supply
and drain. See Plumbing drawings.
22.08 Plumbing to remain. See Plumbing Drawings.
26.01 Existing electrical duct/cable tray. See Electrical Drawings
NOTES
Scale: 3/8" = 1'-0"1 C215 - Control Desk
Scale: 3/8" = 1'-0"2 C214B - CT Scanner
N Scale: 1/2" = 1'-0"3 C214A - Toilet (BID ITEM #2)
Scale: 3/8" = 1'-0"
C214A - Toilet (BID ITEM #2)
Scale: 1/4" = 1'-0"
Typical Mounting Heights - Toilet Accessories
TOILET ACCESSORIES SCHEDULE
MARK ITEM JSN #
PROVIDED
BY
INSTALLED
BY
O W
N E
R
C O
N T
R A
C T
O R
O W
N E
R
C O
N T
R A
C T
O R
A Mirror - 24" x 36" B-290 2436 X X
FD FD
P-2
P-2
P-2
CT-1
BID ITEM #2
CG-1CG-1
CG-1CG-1
CG-1
RWP-1
CT Scanner
C214B
Prep. Rm.
C214 Tlt.
C214A Control
C215
9.16
9.16
WSF-1
CT Scanner
C214B
Prep. Rm.
C214
Control
C215
Tlt.
C214AWSF-1
CT-1
WSF-1
11.03
BID ITEM #2
JASON
H.
ROSS
2118221
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
/1
/2
:5
:1
P
M
VA Cincinnati CT Prep
04/18/2023
FINISH PLANS AND DETAILS
AF101
BMDF
539-CSI-206
Cincinnati, OH
Bid Documents 21027.00
A. All walls to be painted P-1 unless noted otherwise.
B. Work and finishes in Toilet #C214A and above ceiling work in Prep Room #C214 will be Bid Item #2.
C. New flooring installation to follow installation of leveling pad.
9.16 Paint existing wall mounted electrical raceway and new
covers to match wall finish.
11.03 Prep floor slab as required for owner's vendor to install epoxy resin leveling pad over exposed concrete floor surface. See vendor drawings for details.
PLAN NOTES
GENERAL FINISH PLAN NOTES
N Scale: 1/4" = 1'-0"1
WALL FINISH PLAN
N Scale: 1/4" = 1'-0"2
FLOOR FINISH PLAN
FINISH LEGEND
CODE FINISH TYPE MANUFACTURER PRODUCT / COLOR COMMENTS
09 30 13 Ceramic/Porcelain Tiling
CT-1 Ceramic Tile American Olean Danya #DY01 Stream, 12x24 Rectangle Grout: Mapei #11 Sahara Beige
CTB-1 Coved Tile Base American Olean Danya #DY01 Stream, 6x12 Cove Base, S36C9 Grout: Mapei #11 Sahara Beige
09 51 00 Acoustic Ceiling Tile
ACT-1 Acoustic Ceiling Tile Armstrong Fine Fissured #1728, White 2'x2'
ACT-2 Acoustic Ceiling Tile Armstrong Clean Room #VL868, White 2'x2'
09 65 16 Resilient Sheet Flooring
WSF-1 Welded Sheet Flooring Mannington Biospec MD, Color New Glacier 15364 4" Integral Cove Base
09 91 00 Painting
P-1 Paint (Field) Benjamin Moore 981 Wind's Breath Gloss Level: 4 (Satin)
P-2 Paint (Accent) Sherwin Williams SW9134 Delft Gloss Level: 4 (Satin)
10 26 00 Wall and Door Protection
CG-1 Corner Guard Inpro Stainless Steel, 4'H, 2" Wing
RWP-1 Rigid Wall Protection Inpro To Match P-1, 4'H
12 32 00 Manufactured Wood Casework
PL-1 Plastic Laminate (Casework) Wilsonart Amber Cherry 7919K-38, Type 102
12 36 00 Countertops
SS-1 Solid Surface (Countertops) Wilsonart Europa #9210CM
ABBREVIATIONS
AC - AIR COMPRESSOR
ACC - ACCESS
AD - ACCESS DOOR
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BTWN - BETWEEN
CA - COMPRESSED AIR
CFCI - CONTRACTOR FURNISHED CONTRACTOR
INSTALLED
CLG - CEILING
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CORR - CORRIDOR
CTR - CENTER
CWS - COMBINATION WATER SERVICE
D - DEPTH
DET - DETAIL
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - SPRINKLER (DRY)
DWG - DRAWING
EA - EACH
EC - ELECTRICAL (DIVISION 26)
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUAL
EQUIP - EQUIPMENT
ETR - EXISTING TO REMAIN
EQS - EQUIPMENT SUPPLIER
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)
FCE - FIRE CONTROL EQUIPMENT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FINISHED FLOOR ELEVATION
FHC - FIRE HOSE CABINET
FLR - FLOOR
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FIRE SERVICE
FSC - FIRE SUPPRESSION (DIVISION 21)
FT - FEET
FTG - FOOTING
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES
GPM - GALLONS PER MINUTE
HC - HVAC (DIVISION 23)
HD - HUB DRAIN
HP - HORSEPOWER OR HIGH POINT
HR - HOSE REEL
HT - HEAT TRACE
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
JS - JANITOR SINK
L - LENGTH
LBS - POUNDS
MAX - MAXIMUM
MB - MOP BASIN
MC - MECHANICAL (DIVISION 23)
MEZZ - MEZZANINE
MFR - MANUFACTURER
MIN - MINIMUM
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
N/C - NORMALLY CLOSED
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NOM - NOMINAL
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
PC - PLUMBING (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
RAD - RADIUS
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RPM - REVOLUTIONS PER MINUTE
S - SPRINKLER (WET)
SCH - SCHEDULE
SD - SPRINKLER DRAIN
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
STD - STANDARD
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TYP - TYPICAL
UNO - UNLESS NOTED OTHERWISE
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
W/ - WITH
W/O - WITHOUT
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
VALVES AND FITTINGS
T
P
FOB
FOT
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
GAUGE - PRESSURE
GAUGE - TEMPERATURE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER - WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
VALVE - DRAIN WITH HOSE END CONNECTION
VALVE - PRESSURE REGULATING
VALVE - SAFETY RELIEF. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PLUG - PRESSURE AND TEMPERATURE TEST
TRAP PRIMER
GAUGE - VACUUM WITH STOP
CLEANOUT - TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
VALVE - PLUG
VALVE - SHUTOFF AND BOX
VALVE - SHUTOFF ON RISER
V
VB
TP
CO
VALVE - SOLENOID
S
P/T VALVE - PRESSURE AND TEMPERATURE SAFETY
RELIEF. PIPE DISCHARGE AIR GAPPED TO
FLOOR DRAIN UNLESS NOTED OTHERWISE.
VALVE - CHECK
VALVE - SHUTOFF: BALL, GATE, BUTTERFLY VALVE
(REFER TO SPECIFICATIONS FOR REQUIRED TYPE
BASED ON APPLICATIONS)
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG IN
AND OUT
VALVE - COMBINATION SHUTOFF AND
BALANCING (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
A1
P1 P1OR
A1
OH
P2
B
P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND
HAZARD CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION
VARIES. REFER TO SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK.
LETTER DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH
IT IS SHOWN UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
EXPANSION JOINT
WATER METERM
PIPING SYMBOLS
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
D
R
PIPE RISER
BC
TC
FLEX PIPING
FIRE SUPPRESSION SYMBOLS
PIPING DESIGNATIONS
FS
PIV
S
CONCEALED PENDENT SPRINKLER
FIRE HYDRANT
FLOW SWITCH
GATE VALVE OS&Y
INSTITUTIONAL PENDENT SPRINKLER
PENDENT SPRINKLER
POST INDICATOR VALVE
RECESSED PENDENT SPRINKLER
SIDE WALL SPRINKLER
SUPERVISED VALVE
UPRIGHT SPRINKLER
FIRE DEPARTMENT VALVE
SPRINKLER PIPE (DRY)
FIRE SUPPRESSION (STANDPIPE/
SPRINKLER MAIN)
FIRE SERVICE
PRE-ACTION / DELUGE SPRINKLER PIPE
SPRINKLER PIPE (WET)
SPRINKLER DRAIN PIPE
DS
F
FS
PS
S
SD
COMMMMBINATION FIRE SUPPRESSION &
DOMESTIC WATER SERVICE
CWS
LOCATION: FIRE PUMP - SUB-BASEMENT OF BUILDING 01
STATIC PRESSURE: 140 PSI
RESIDUAL PRESSURE: 120 PSI
FLOW: 754 GPM
DATE: JULY 25, 2018
BASIS OF DESIGN FLOW TEST DATA
A PROVIDE A COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN THE
RENOVATED AREA.
B COORDINATE WORK WITH VAMC, PHASING PLAN AND OTHER TRADES. OFFSET
AND/OR RELOCATE EXISTING SERVICES TO ACCOMMODATE NEW WORK OF
OTHER TRADES.
C DESIGN SERVICES SHALL FOLLOW ALL VA STANDARD DESIGN PRACTICES,
DETAILS, SPECIFICATIONS AND SITE SPECIFIC COR REQUIREMENTS AS WELL AS
WORK SHOWN ON THESE DOCUMENTS. ALL DEVIATIONS FROM
AFOREMENTIONED REQUIREMENTS SHALL BE APPROVED BY THE COR.
THE ENTIRE SPRINKLER SYSTEM SHALL CONFORM TO VAMC STANDARDS, RULES
AND REGULATIONS. REFER TO VA FIRE PROTECTION DESIGN MANUAL.
D VERIFY THAT THERE IS ADEQUATE SPACE TO INSTALL ALL NEW PIPING
REQUIRED TO COMPLETE THIS WORK.
E ALL SPRINKLER PIPING IS LOCATED ABOVE THE CEILING (AT THE BOTTOM OF
STRUCTURE IN EXPOSED STRUCTURAL AREAS), UNLESS OTHERWISE INDICATED.
F THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE FIRE
SUPPRESSION SPRINKLER SYSTEM SHALL BE FOR A WET PIPE SYSTEM
FOR A:
1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER SPRINKLER
WITH THE DENSITY OF 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1500 SQ.
FT. PROVIDE AN ADDITION OF 100 GPM HOSE ALLOWANCE. (PATIENT CARE,
TREATMENT AND CUSTOMARY ACCESS AREAS.)
2 ORDINARY HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER
SPRINKLER WITH A DENSITY OF 0.15 GPM/SQ. FT. PROVIDE AN ADDITION OF
250 GPM HOSE ALLOWANCE. (LABORATORIES, MECHANICAL EQUIPMENT,
ELECTRIC CLOSETS, ELECTRICAL SWITCHGEAR AND REPAIR ROOMS)
3 ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER
SPRINKLER WITH A DENSITY OF 0.20 GPM/ SQ. FT. PROVIDE AN ADDITION OF
250 GPM HOSE ALLOWANCE. (STORAGE AREAS, TRASH, FILE STORAGE, CLEAN &
SOILED LINEN, PHARMACY AND ASSOCIATED STORAGE, LAUNDRY, KITCHENS
AND ASSOCIATED STORAGE, RETAIL AND ASSOCIATED STORAGE, BOILER PLANTS,
ENERGY CENTERS, WAREHOUSES.)
NOTE: ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE NOTED.
G SPRINKLERS:
PROVIDE SPRINKLER LOCATIONS, SIZING AND RELATED PIPING.
SPRINKLER PIPING SHALL BE 1" MINIMUM SIZE.
SPRINKLERS (UNLESS OTHERWISE NOTED):
EXPOSED AREAS - UPRIGHT OR PENDENT TYPE - STANDARD BRASS
CEILING AREAS - RECESSED PENDENT TYPE
ALL HEADS SHALL BE UL LISTED AND FM APPROVED.
SPRINKLERS SHALL BE "QUICK RESPONSE" TYPE IN ALL AREAS EXCEPT HIGH
TEMPERATURE AREAS, TELECOMMUNICATION SPACES, ELECTRICAL SWITCHGEAR,
ELEVATOR SHAFTS & MACHINE ROOMS, PHARMACY COMPOUNDED STERILE
PRODUCTS (CSP) OR CLEAN ROOMS.
ALL PENDENT TYPE SPRINKLERS LOCATED IN SUSPENDED CEILING TILE AREAS
SHALL BE LOCATED IN THE CENTER OF THE CEILING TILE.
H ALL SPRINKLER LOCATIONS AND PIPING MUST BE COORDINATED WITH ALL
EQUIPMENT KINDRED TO OTHER TRADES. SPRINKLER LOCATIONS MUST BE
APPROVED BY THE ARCHITECT BEFORE WORK COMMENCES. REFER TO THE
ARCHITECTURAL AND REFLECTIVE CEILING PLANS FOR ADDITIONAL INFORMATION
ON ALL CEILING TYPES, HEIGHTS AND OTHER ARCHITECTURAL FEATURES.
I ANNULAR SPACE AT PIPE AND OTHER SIMILAR PENETRATION OF FIRE RATED
ASSEMBLIES SHALL BE FIRE STOPPED. REFER TO SPECIFICATIONS FOR FIRE
STOPPING. REFER TO ARCHITECTURAL DRAWINGS FOR CONSTRUCTION, LAYOUT
AND FIRE RATING OF FLOORS, WALLS, PARTITIONS AND OTHER BUILDING
ELEMENTS.
J ALL SPRINKLER ZONES SHALL MATCH SMOKE COMPARTMENTS.
REFER TO ARCHITECTURAL DRAWINGS FOR INFORMATION ON SMOKE
COMPARTMENTS, SMOKE PARTITIONS AND FIRE BARRIERS.
K SPRINKLER SYSTEM PIPING AND FITTINGS SHALL BE IN ACCORDANCE WITH
NFPA 13.
1 PIPING SIZES 2" AND SMALLER SHALL BE BLACK STEEL SCHEDULE 40
WITH THREADED END CONNECTIONS.
2 PIPING SIZES 2.5" AND LARGER SHALL BE BLACK STEEL SCHEDULE 10
WITH GROOVED CONNECTIONS. GROOVES IN SCHEDULE 10 PIPING SHALL BE
ROLLED GROOVED ONLY.
FIRE SUPPRESSION DESIGN NOTES
P: 937-224-0861 www.heapy.com
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT
NO.
STATE COA FIRM
NO.
/2
/2
:5
:2
A
M
VA Cincinnati CT Prep
04/18/2023
ABBREVIATIONS, LEGEND &
DRAWING INDEX
F001
RLCEWL
539-CSI-206
CINCINNATI, OHIO
Bid Documents 21027.00
2022-05059 01528
DRAWNG INDEX - FIRE SUPPRESSION
SHEET NUMBER SHEET NAME
F001 ABBREVIATIONS, LEGEND & DRAWING INDEX
FX102 PARTIAL SECOND FLOOR PLAN - FIRE SUPPRESSION
22.149-S22.6 10.6
Q -S
22.16
P-S
2 2
C214 Prep. Rm.
C214A Tlt.
C215 Control
C214B CT Scanner
AREA OF WORK
P: 937-224-0861 www.heapy.com
VA Project No.
RDC/JPA Project No.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Office of Construction and Facilities Management
PROJECT
NO.
STATE COA FIRM
NO.
/2
/2
:5
:2
A
M
VA Cincinnati CT Prep
04/18/2023
PARTIAL SECOND FLOOR PLAN -
FIRE SUPPRESSION
FX102
RLCEWL
539-CSI-206
CINCINNATI, OHIO
Bid Documents 21027.00
2022-05059 01528
N Scale: 1/2" = 1'-0"
PARTIAL SECOND FLOOR PLAN - FIRE SUPPRESSION
PLAN NOTES
1. EXISTING AREA, PIPING OR ITEM OF EQUIPMENT (TYPE AS INDICATED) TO REMAIN.
2. LIMITS OF RENOVATED AREA REQUIRING EXISTING SPRINKLER SYSTEM MODIFICATIONS.
MODIFICATIONS…