Attachment II - Statement of Work.pdf
PDF 183 KB Posted
- Attached to
- Purchase Evaluation/Calibration for CASP-2000H Battery Charger Federal contract opportunity
- Solicitation number
- 70Z03824QE0000068
About this file
This document is a Statement of Work (SOW) for the evaluation and calibration of CASP-2000H Battery Chargers for the United States Coast Guard (USCG), Aviation Logistics Center (ALC). The SOW details the contractor requirements, including serial number tracking, calibration procedures, repair quotations, and return of items.
The related federal contract opportunity is a combined synopsis/solicitation for the purchase of evaluation and calibration services for six CASP-2000H Battery Chargers. The solicitation is being issued as a Request for Quotation (RFQ) on a sole source basis to Marvel Aero International, Inc., the only known source authorized by the Original Equipment Manufacturer, Christie Electric. The contract will be a firm-fixed-price purchase order with a required delivery within 12 weeks after receipt of order. Offers are due by August 8, 2024, and the anticipated award date is on or about August 12, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment IV - Justification and Approval for Other Than Full and Open Competition_Redacted.pdf | ||
| Attachment I - Schedule of Services.xlsx | XLSX spreadsheet | |
| Attachment III - Terms and Conditions FAC 2024-05 Eff 22May2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) Attachment II
CONTRACTOR REQUIREMENTS
Evaluation and Calibration
1. The United States Coast Guard (USCG), Aviation Logistics Center (ALC) will furnish the items listed in the Schedule for evaluation and calibration.
2. Serial number tracking shall be used for confirming that the correct units were received at the Contractor’s facility and are subsequently returned to the Coast Guard. Upon receipt of the items for evaluation and calibration, the Contractor shall verify that the part number and serial number match the Purchase Order. The Contractor shall notify the Contracting Officer in writing ONLY if a discrepancy is identified.
3. The items under this order require calibration. Calibration shall be performed after each recertification cycle and shall include adjustment and correction so that the item performs at an acceptable level. Calibration shall also encompass identifying and determining the cause(s) of errors and performing corrective action(s) when applicable. Calibration shall consist of a comparison of the device under test with a calibration standard of known accuracy. The calibration standard shall be traceable to a national or international standard.
4. The Contractor shall provide the following:
a. A certificate of calibration for each unit to include a certificate number, name or initials of person performing the calibration, calibration date, unit type, unit manufacturer, unit model number, unit serial number, adjustment or service performed, calibration results, a description of calibration, type of calibration procedure performed. The certificate of calibration shall be emailed to the Purchasing Agent at Stacey.M.Riggs@uscg.mil and attached to the packing slip when returning the RFI item(s).
b. A decal on the unit to indicate current calibration. The decal shall include the calibration date, name or initials of person performing the calibration, month and year when next calibration is due, unit serial number, and the name of the company performing calibration.
• Decals shall be applied in such a manner that will not cause damage to the equipment or at a later date when the decal is removed.
• Decals shall not be applied as to hinder the reading of any display.
5. If, after visual and functional inspections, an item is found to require repairs, the Contractor shall submit a repair quotation for the repair to the Contracting Officer. The quotation shall be valid for thirty (30) days and shall include the following:
• Description of each discrepancy found.
• Number of labor hours per discipline required to complete each discrepancy.
• Cost of part(s).
• Total dollar amount for each discrepancy.
• Total dollar amount for complete list of discrepancies.
• Estimated repair turnaround time (TAT).
• Purchase order and applicable line item.
6. The Contractor must receive a written modification signed by the Contracting Officer that authorizes the repair(s) prior to the commencement of work. Once the repair quotations are received, the Contracting Officer will respond via a written modification within thirty (30) days as to whether the quotes are approved or declined. If approved, the Contractor will be given the quoted TAT (calculated from the date the modification is issued) to complete the repairs and return the items to the USCG. If a quote is declined, the Contractor will be authorized the firm-fixed evaluation and calibration price established in the order. In addition, the Contracting Officer will provide instructions regarding whether the item should be returned as-is or scrapped at the Contractor’s facility.
STATEMENT OF WORK (SOW) Attachment II
7. The USCG shall not be liable for any amount expended by the Contractor in excess of the applicable firm fixed price reflected in the schedule unless prior written authorization has been given by the Contracting Officer.
Once any repairs have been approved in writing by the Contracting Officer, the following additional paragraphs apply:
8. Items shall be repaired and returned to ready-for-issue (RFI) condition in accordance with (IAW) the Original Equipment Manufacturer (OEM) minimum functional performance specifications. The Contractor shall correct all deficiencies found in the evaluation. This shall include the replacement of missing or broken parts and the removal of any foreign matter or corrosion.
9. Work under this purchase order shall be performed at the Contractor’s facility. The Contractor shall provide all necessary parts, materials, labor, tooling, test equipment and facilities to evaluate and repair the items listed in this purchase order at the firm-fixed prices listed in the schedule (or modification). The Contractor shall perform all repairs IAW applicable OEM’s Component Maintenance Manuals (CMMs), other repair specifications in lieu of an applicable CMM, and/or applicable test/acceptance criteria. Any deviations must be approved by the USCG.
10. The Contractor must have access to required CMMs, repair specifications, test/acceptance criteria and/or any other required data to ensure that all items are tested and repaired IAW the OEM’s current specifications and procedures. Original design or functional capabilities of the end item and parts thereof shall not be changed unless authorized or directed by the requirements of this SOW.
11. The Contractor must have access to all applicable documents and obtain current editions of all applicable documents. The USCG does not own nor can it provide the technical documents specified herein. The closing date for receipt of offers, order award, and/or delivery date will not be delayed pending receipt of these documents for any Contractor.
12. Parts of an item found to be in a serviceable condition as a result of functional testing shall be reused. Missing parts and parts found to be defective or that require replacement by OEM instructions shall be replaced with parts meeting the OEM’s specifications and drawings or as otherwise authorized in writing by the Contracting Officer. Replacement parts shall be new and accompanied by traceability to the OEM. The cost for parts that are replaced systematically during repair shall be included in the price listed in the schedule for these operations.
13. The USCG will provide disposition instructions (either to scrap the item at the Contractor’s facility or to return the item to ALC) for all items that are considered BER. The Contractor shall not dispose of an item until they have been notified by a written modification to the order. When returning the item to ALC, the items shall be clearly marked as “BER” with the supporting evidence.
14. ALC considers items RFI upon acceptance. Items determined to be non-RFI upon installation or operation may be returned to the Contractor for correction at Contractor’s expense. Deficiencies will be described in a Product Quality Deficiency Report (PQDR) and sent to the Contractor prior to the return of any item.
File details come from the government source that posted it. Updated .