Attachment II Statement of Work.pdf
PDF 1 MB Posted
- Attached to
- ELECTRICAL SERVICE INSTALLTION FOR CONTAINERIZED LAB (Hilo, HI) Federal contract opportunity
- Solicitation number
- 12905B23Q0206
About this file
This statement of work details requirements for an electrical service installation project for a containerized laboratory at the USDA Agricultural Research Service Pacific Basin Agricultural Research Center in Hilo, Hawaii. The project involves running electricity from the greenhouse electrical panel to a carport and then to the laboratory container, including installing conduit, wire, power poles, and testing once completed. The contractor will provide all labor, materials, and associated services to complete the turnkey project in accordance with specifications within 90 calendar days of receiving a notice to proceed. The solicitation specifies Davis-Bacon Act prevailing wage requirements and identifies points of contact for questions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment III DOL HI20230001_072823.pdf | ||
| Attachment IV ARS-371 - CONSTRUCTION PROGRESS AND PAYMENT SCHEDULE.pdf | ||
| Attachment V ARS-372 - CONTRACTOR REQUEST FOR PAYMENT TRANSMITTAL.pdf | ||
| Attachment I SF-18.pdf | ||
| RFQ_12905B23Q0206 Terms and Conditions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
STATEMENT OF WORK
ELECTRICAL SERVICE INSTALLTION FOR
CONTAINERIZED LAB
USDA-ARS
ARS-PBARC-DKI
64 Nowelo St, Hawaii 96720
STATEMENT OF WORK
1.0 CONTRACT PROJECT:
a. Project Title:
Electrical Service Installation for Containerized Laboratory
b. Service Location:
USDA-ARS-DKI
Pacific Basin Agricultural Research Center
2.0 PROJECT CONTACT PERSONS:
a. CONTRACTING OFFICER (CO):
RESEARCH LEADER (RL):
Tracie Matsumoto Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo Hi 96720
(808) 959-4358/4349 E-mail: tracie.matsumoto.usda.gov
b. ADMINISTRATIVE OFFICER (AO):
Carlee Wehrsig Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo, HI 96720 Phone: (808) 959-4312 E-mail: carlee.wehrsig@usda.gov
d. LOCATION CONTRACTING OFFICER REPRESENTATIVE (COR):
Pernell Hanoa
Facilities Manager Daniel K. Inouye U.S. Pacific Basin Agricultural Research Center USDA-Agricultural Research Service 64 Nowelo Street, Hilo, HI 96720 Phone: (808) 959-4356 Cell: (808) 896-4523 E-mail: pernell.hanoa@ars.usda.gov
e. SAFETY OFFICER (CDSO) Scott Geib PhD
USDA-ARS Pacific Basin Agricultural Research Center
64 Nowelo Street, Hilo, Hawaii 96720 808-959-4335 E-mail: scott.geib@ars.usda.gov
3.0 SCOPE OF WORK
The contractor shall provide all professional services necessary for the accomplishment of the contract service and such required service shall be in accordance with the requirements as described herein and on attached contract documents.
3.1 Background: The USDA/DKI-PBARC located at 64 Nowelo St in Hilo Hawaii requires the labor and materials to provide electricity to a containerized mobile laboratory. Note: This will provide temporary aerial electrical for the 40’ containerized laboratory. This container will be used to cultivate plants imported under an APHIS Controlled Import Permit
3.2 Contractor shall provide the labor and materials to provide electrical requirements provided in the attached Germfree drawing E-601 for the containerized lab.
3.2.1 Electricity will be run from the electrical panel in the greenhouse to the car port and from the carport to the laboratory.
Installation of a 300-amp 277/480 volt 60 Hz line in panel SWBD-2MDS in the headhouse. See photos
Install conduit around the building to the area between the headhouse and carport.
Provide wire from headhouse to carport with mast on both sides.
Install conduit from the carport to the overhead mast in the laboratory.
Install power poles as needed.
Test electrical once connection to building is complete.
4.0 PROJECT REQUIREMENTS:
a. Site visit is highly recommended to verify equipment, design, project location, equipment requirements and specifications.
b. The Contractor will work with site personnel to ensure project is accomplished in a timely manner.
c. The Contractor’s work shall adhere to the criteria stated within these project requirements, drawings, and specifications. All construction and services shall comply with applicable federal, state, and local code requirements as well as current industry standards, (ie: EPA, ASTM, GSA, AASHTO, etc.) and health and safety codes, in effect at the time of contract award.
d. All work to meet all pertinent Unified Facilities Guide Specifications (UFGS) and ARS 242.1M standards. UFGS available at http://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs.
ARS 242.1M available at https://www.afm.ars.usda.gov/ppweb/pps-and-manuals/.
e. This project falls under the DAVIS BACON Wage Act.
4.1 Background & Site Description:
The project site is located at the Daniel K. Inouye, Pacific Basin Agricultural Research Center Hilo Hawaii.
4.2 Bid Schedule:
Item Description
Base Item Provide equipment, labor, materials, and all associated services necessary to complete the project.
4.3 Description of Work:
a. The Contractor will provide a turn-key project satisfying all Local, State, and Federal requirements.
b. The Contractor will provide all the necessary materials and labor per
Section 3.0 and properly dispose of all material being replaced.
c. Contractor is responsible for any damage to adjacent equipment and miscellaneous objects that may become damaged during construction. The Contractor is responsible for making repairs to meet or exceed conditions prior to damage.
d. The Contractor is responsible for visiting the site prior to submitting a bid to observe existing conditions. No compensation will be provided for conditions that would be visible during an on-site visit for persons experienced performing this type of work.
4.4 Government Furnished Equipment\Services
a. The Government does not anticipate the need in this project, but the Government will be available to assist with the identification/location of utilities as necessary.
b. The Government will furnish a reasonable amount of electricity and water.
5.0 GENERAL REQUIREMENTS:
5.1 Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.
5.2 Existing Installations / Demolition: Contractor shall modify existing installations as needed to accommodate the new installation. Contractor shall coordinate modification of existing installations with Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disturbances that might jeopardize on-going operations and research. Owner reserves the right to retain any equipment / materials removed as part of the scope of work. Contractor shall coordinate any equipment / materials to be retained with Owner prior to starting demolition operations. Contractor shall legally dispose all any materials removed that will not be retained.
5.3 Installation: It shall be the responsibility of the Contractor to complete work in accordance with Federal, State, and Local Code Standards. Additional procedures and materials may be required than is indicated herein. If any item specified herein conflicts with the applicable codes and recommendations, the Contractor shall bring it to the attention of the Contracting Officer Representative for immediate resolution.
5.4 Submittals: Provide manufacturer’s descriptive literature/shop drawings for all materials to the COR for review. The descriptive literature shall be annotated/ highlighted to show its conformance with contract requirements. Submittals are required for new materials and will be stamped and/or signed by the general contractor prior to submission to the Government. Contractor is responsible for any costs incurred for equipment ordered without prior approval.
5.5 Quality Control: The work performed under this contract shall be subject to continuous audit by the COR. Quality control is the exclusive responsibility of the Contractor.
5.6 Protection of Work and Property/Safety Requirements:
a. Contractor shall furnish a Site-Specific Safety Plan (SSSP) or Accident Prevention Plan (APP) 10 days after contract award upon request. SSSP / APP shall be reviewed by the Government before construction work commences. In addition to the usual components of a safety plan, the plan shall include specific procedures to address mold encountered during the project.
b. The Contractor shall protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected thereby until acceptance of the work. Any damage to property shall be repaired at the Contractor’s expense, to pre-damaged condition to the satisfaction of the COR.
c. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
d. Contractor is responsible for verifying location of any underground utility and is responsible for any damaged caused to such utilities.
5.7 Temporary Facilities:
a. Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during construction and shall repair or replace any items damaged through its own negligence.
b. Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from location staff or maintenance personnel as possible as possible.
5.8 Materials and Equipment:
a. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer’s latest standard design.
b. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplies and Contractor before during and after shipment in a manner to prevent any injury, theft or damage of any kind to the materials and equipment. All materials and equipment furnished by the Contractor shall be subject to inspection and approval by the CO/COR.
c. Government will not furnish any labor or equipment to unload or move materials or supplies.
5.9 Cleanup: The work site shall always be kept clean and free of debris. Disposal of the old equipment is required. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.
5.10 Warranty:
a. Submit data concerning the standard one-year warranty for workmanship, including the warranty periods (dates), and warranty contacts with names, addresses and telephone numbers.
b. Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one-year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.
5.11 Final Payment/Contract Closeout: The following documents are REQUIRED
PRIOR TO FINAL PAYMENT (other documents may also be required):
a. General contractor’s minimum 30 days warranty on all work.
b. Operation and Maintenance Data
c. Release of liens.
d. Final Invoice
6.0 PROJECT SCHEDULE: The Contract time for this project is 90 calendar days from Notice to Proceed.
Attachment
Note: Drawing not to scale
Tentative line
Electrical pane
Concrete slab
Electrical Panel
92’
72’
66’ End of Walkway
Power Pole
Anchor
Anchor
10’
25’
E-601
- INITIAL RELEASE DDMMMYYYY
C. PIGEON
J. CARLISLE
L. WOO
DDMMMYYYY
L. WOO
SCHEMATIC DESIGN
FOR REVIEW
REVIEWED BY: DATE:
CHECKED WITH COMMENTS:
CHECKED WITH NO COMMENTS:
SCHEMATIC DESIGN
REVIEWER DDMMMYYYY
REV DESCRIPTION DATE
REVISIONS
DRAWING NO.
PROJECT #
DR
AW
IN
G
APPROVED BY
CHECKED BY
DESIGNED BY
DATE
DR
AW
IN
G
TI
TL
E
PR
OJ
EC
T
TI
TL
E
DRAFTED BY
W.O. #
LEGEND PROJECT NORTHKEY PLANGENERAL NOTES
THIS PRINT IS PROVIDED ON A
RESTRICTED BASIS AND IS NOT
TO BE USED IN ANY WAY
DETRIMENTAL TO THE INTERESTS
OF GERMFREE LABORATORIES
©2022 GERMFREE
STAMP
GERMFREE
4 SUNSHINE BLVD
ORMOND BEACH, FL 32174
T: 386-265-4300
WWW.GERMFREE.COM
A
B
C
D
E
F
G
H
I
123456789101112
123456789101112
A
B
C
D
E
F
G
H
I
U S D
A
H
A W
A I I
PD22037
518966
DI
AG
RA
M:
S
IN
GL
E-
LIN
E
PO
W
ER
UTILITY SOURCE
208/120V
3 ɸ 60HZ
4-WIRE PLUS GND
MECHANICAL ROOM
L1 L2 L3
PANEL
LOADS
BLK
RED
BLU
N WHT
MECHANICAL ROOMEXTERIOR
(4) 4/0 AWG
(1) #4 AWG
#6 AWG GROUND IN 3/4" EMT
#6 AWG SUPPLEMETAL
GROUNDING ELECTRODE
CONDUCTOR
ATS-1
AUTOMATIC
TRANSFER
SWITCH
CUMMINS
OTEC400
TRAILER
CHASSIS
GROUNDING POINT
3"EMT
UTILITY-3
WIRE COLORS:
L1 BLK
L2 RED
L3 BLU
N WHT
GRD GRN
#6 FOR GROUND ROD CONNECTION
#4 FOR CONCRETE ENCASED ELECTRODE
(SEE NOTE 2)
(SEE NOTE 3)
UTILITY-2
UTILITY FEEDERS
EMERGENCY
(CLIENT SUPPLIED)
3" X 4"
RIGID NIPPLE
EITHER (1) 3" EMT (SEE NOTE 3.1)
OR (2) 2" EMT (SEE NOTE 3.2)
MDP
PANEL
120V/208V
3-PH
225A MAIN CIRCUIT
BREAKER
22KAIC
SQUARE-D
MH68
SURGE
PROTECTION
DEVICE
SPD-1
TK-ST200-
3Y208-FL
UTILITY DISCONNECT
225A, 600V, 3ɸ, 4W, 3-POLE
GENERATOR DISCONNECT
225A, 600V, 3ɸ, 4W, 3-POLE
400AF
225AT
400AF
225AT
UTILITY (CUSTOMER SUPPLIED)
GENERATOR (CUSTOMER SUPPLIED)
TO GROUNDING ELECTRODE (CUSTOMER SUPPLIED)
GENERATOR
START/STOP
3/4"EMT
1. A 300 AMP LOCKABLE FUSED DISCONNECT
SHALL BE SUPPLIED BY CLIENT. CLIENT IS
REQUIRED TO SUPPLY APPROPRIATE POWER &
GROUNDING IN COMPLIANCE WITH LOCAL
CODES. DISCONNECT SHOULD BE LOCATED
WITHIN SITE OF THE PHARMACY TRAILER.
2. A SUPPLEMENTAL GROUND ROD SHOULD BE
INSTALLED BY CLIENT NEAR THE ELECTRICAL
SERVICE ENTRANCE POINT OF THE TRAILER.
3. EITHER SINGLE ENTRY OR PARALLEL
CONDUCTOR FEEDS ARE PROVIDED.
3.1. IN THE CASE OF SINGLE ENTRY, A 3"
CONDUIT IS PROVIDED AND THE FOLLOWING
WIRES SHOULD BE BROUGHT INTO THE
TRANSFER SWITCH: (4) 4/0 AWG; (1) #6 AWG.
ALL WIRES SHOULD BE MIN. 75C COPPER.
3.2. IN THE CASE OF PARALLEL FEEDS:
(2) 2" REDUCING BUSHINGS ARE PROVIDED.
THE FOLLOWING CONDUCTORS SHOULD BE
BROUGHT INTO THE TRANSFER SWITCH: (4)
1/0 AWG; (1) #4 AWG PER CONDUIT. ALL
WIRES SHOULD BE MIN. 75C
| Attachment II Statement of Work |
| Attachment E-601 1 line diagram |