ATTACHMENT I - SOW Replace HVAC Controls Bldgs 54 and 55 Tifton GA.pdf
PDF 1 MB Posted
- Attached to
- Replace HVAC Controls in Bldg's 54 & 55 - Tifton, GA Federal contract opportunity
- Solicitation number
- 12405B21R0047
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12405B21R0047 -Clauses and Provisions.pdf | ||
| ATTACHMENT II - Davis Bacon Wage Dwetermination-GA20210102.pdf | ||
| 12405B21R0047- SF-1442-Request for Proposal.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture Agricultural Research Service
Statement of Work
Replace HVAC Controls, Bldgs 54 and 55 2381 Rainwater Road
Tifton, GA 31793 Asset IDs: 660200B054, 660200B055
Prepared by:
Lee Willis 17 May 2021
Reviewed by:
Timothy Strickland 17 May 2021
Contents Location Map
Statement of Work:
Site Visit
Safety
Base Bid:
Contractor Responsibility
Material Submittals
Demolition Procedure:
Damage to Property
Inspection and Acceptance
Project Schedule
Work Hours
Project Contacts
Appendix:
Location Map
Site Address: 2381 Rainwater Road, Tifton, Georgia 31793
Statement of Work:
Contractor shall provide all materials, labor, and equipment to remove and replace the HVAC controls system installed in USDA Buildings 54 and 55 (Pesticide Lab) located at 2381 Rainwater Road, Tifton, GA 31793. Existing mechanical and control plans from the previous HVAC upgrade project are attached in appendix for reference.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid.
Registration can be obtained through: https://www.beta.sam.gov
Site Visit:
Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
Safety:
https://www.beta.sam.gov/
The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer (CO) within 7 days of contract award. The Plan shall include phone numbers and maps to the local doctor’s office and nearest hospital.
All employees of the general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and/or other relevant competency training. Supervisors shall have completed the 30-hour OSHA training.
Base Bid:
Provide all equipment, labor, and materials necessary (including dumpster/container if applicable) to:
• Provide components to support existing HVAC system which includes but is not limited to:
o Air Cooled Chiller (CH-1) - (Quantity of 1):
Provide Bacnet controller that includes Stop/Start control and status for alarming and interface to the chiller’s Bacnet module, if available.
Provide supply and return temp immersion sensors. The existing sensor shall be re-used.
Re-use bypass or isolation valve and differential pressure sensor, if installed.
Provide low voltage control wiring and open Bacnet communication trunk.
Provide programming and graphics.
Existing raceways and conduit from inside building to the chiller will be re-used.
o Air Handling Unit (AHU-1) - (Quantity of 1):
Provide Bacnet controller with I/O module and control panel that includes Stop/Start control and status for alarming.
Provide new 2.5” 3-way control valve assembly with NEMA 4 cover for outdoor installation.
Provide supply air (SA), mixed air, filter differential, and return air (RA) sensors.
Provide outside air (OA) and RA actuators for existing dampers. Dampers and linkage are existing.
Existing air flow monitoring station (AFMS) is to be re-used.
Provide NEMA 1 control panel installed indoors; re-use existing 120VAC to panel.
Provide low voltage control wiring and open Bacnet comm trunk.
Existing raceways and conduit from inside building to the AHU will be re-used.
o Electric Duct Heaters (EH-1, EH-2, EH-3) – (Quantity of 3):
• Provide DDC controller/actuator, supply air sensor and room sensor for each unit.
Re-use wall rough-ins.
• Provide control for SCR heat.
• Provide low voltage control wiring and open Bacnet communication trunk.
• Provide programming and graphics.
o Air Terminal Units (ATU-1, ATU-2, ATU-3, ATU-4, ATU-5) - (Quantity of 5):
Provide DDC controller and actuator, supply air sensor and room sensor for each unit. Re-use wall rough-ins.
Provide control for 3-stage heat.
Provide low voltage control wiring and open Bacnet communication trunk.
o Phoenix Air Supply/Exhaust Valves (AV-1 thru AV-12) - (Quantity of 12):
Integrate to the existing Phoenix Lab Main Controller.
Existing lab valves and sensors will remain.
Provide equipment graphics for each valve.
If any lab valves or components are found to be defective, contractor shall generate a deficiency list for USDA to modify contractor for replacement.
o Exhaust Fans (EF-1, EF-2, EF-3, EF-4, EF-5) - (Quantity of 5):
Provide Start/Stop and fan status for each fan.
EF-2 thru EF-5 are equipped with VFD. Contractor shall interface to each VFD for Start/Stop control and status.
Provide low voltage control wiring and open Bacnet communication trunk.
• Additionally:
o Contractor shall provide full color graphics package accessible via web browser for each piece of equipment. All new equipment programming and graphics shall reside on this platform.
o Contractor shall utilize USDA’s existing server or virtual machine to host the Web GUI supervisor software.
o Contractor shall provide start-up and testing of system.
o All low voltage control wiring above lay-in ceilings and inside sheetrock walls shall be installed as plenum cable not in conduit. All control wiring and communication wiring in mechanical rooms shall be installed in conduit.
o Contractor shall provide complete engineered submittals and as-built documentation.
o Contractor shall provide one (1) year warranty for all work and products from date of substantial completion.
o Provide up to 8 hours of onsite training to government personnel.
o Contractor shall provide quote as a turn-key project.
Contractor Responsibility:
1. Contractor shall verify all dimensions and site conditions prior to beginning work.
2. Contractor shall perform the work as listed in the above outlined Base Bid.
3. Contractor shall keep work area clean daily and take measures to control debris while work is being performed.
4. Contractor is required to manage the project and consult with the Government prior to beginning all work phases and to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. Contractor must always have a Site Supervisor on the job while working on this project.
6. Contractor will provide their own restroom facility and dumpster.
7. Contractor will remove all demolished material and debris from the worksite and dispose off-site.
8. The Contractor shall confine all operations on Government premises to areas authorized or approved by the CO or Contracting Officer Representative (COR).
9. Employees of general contractor and subcontractors shall comply with ARS security management program, obtain permission from the CO/COR, be identified by project and employer by wearing contractor issued identification badges (if required) at all times on ARS property, and restricted from unauthorized access.
10. Work shall be accomplished in accordance with all local, state and federal codes and regulations.
Material Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted electronically to the CO and COR for review and approval prior to purchasing materials.
Demolition Procedure:
1. The contractor shall always be responsible for protecting their work and ensuring the safety of their crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
2. All items demolished shall become property of the Contractor and be removed by Contractor from ARS property.
3. Recyclable materials shall be recycled, and the savings shall be included in the contractor’s quote, therefore passed on to the government.
4. Contractor shall be responsible for providing disposal records where applicable.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government at Contractor’s expense.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule final inspection a minimum of two (2) days in advance with the COR.
Project Schedule:
The completion of this project shall not exceed 90 days from date of Notice to Proceed. A request for time extension must be submitted to the CO in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor’s working hours shall be scheduled to coincide with the working hours of the Tifton location which are 8 a.m. to 4:30 p.m. Should it be necessary to work hours other than the regular working hours, the contractor shall arrange for access to the area with the CO and COR two (2) days prior to the need.
Project Contacts:
Administrative Officer (AO):
TBA
Research Leader (RL):
Contracting Officer Representative (COR):
Engineering Project Manager (EPM):
Contracting Officer:
TBD
Appendix:
Mechanical and Controls Plans, Bldg 54-55
VENTURI BALANCINGr-
C
'fl==:f.i
= = 1i;:== =
,M001 'NOT TO
MECHANICAL SPECIFICATIONS
1. FUME HOOD EXHAUST DUCTS SHALL BE FABRICATED FROM TYPE
304 STAINLESS STEEL ANO JOINTS SHALL BE WELDED LIQUID
TIGHT.
2. SUPPLY, RETURN, ANO GENERAL EXHAUST DUCTWORK SHALL BE
FABRICATED FROM G90 GALVANIZED SHEET STEEL.
3. ALL DUCT SHALL BE SEALED WITH A MASTIC SUITABLE FOR THE
PRESSURE CLASSIFICATION IN ACCORDANCE WITH SMACNA "HVAC
DUCT CONSTRUCTION STANDARDS".
MECHANICAL LEGEND
181 SUPPLY AIR DUCT
IZI ----- RETURN AIR DUCT OR EXHAUST DUCT
DUCT TRANSITION
-----X,.DIFFUSER TYPE/ Y=THROW
XY
z
1. REFER TO ELECTRICAL PLANS FOR POWER CONNECTIONS.
2. ALL UNITS SHALL BE DOUBLE WALL CONSTRUCTION.
3. FAN STATIC PRESSURE SHALL BE SELECTED WITH A MIO-LIFE FILTER PRESSURE DROP (0.75 INWG).
4. ALL SUPPLY ANO RETURN AIR DUCTS LOCATED WITHIN THE
BUILDING'S THERMAL ENVELOPE SHALL BE INSULATED WITH 2"
THICK, 0.75 PCF DENSITY, BLANKET TYPE FIBERGLASS INSULATION
WITH VAPOR BARRIER ANO MINIMUM R-VALUE OF 6.7.
5. ALL SUPPLY ANO RETURN AIR DUCTS LOCATED OUTSIDE THE
• .I. '
Z=AIRFLOW, CFM
MD MANUAL DAMPER
TURNING VANES
1. REFER TO ELECTRICAL PLANS FOR POWER CONNECTIONS.
1. CEILING DIFFUSERS SHALL BE ALUMINUM LOUVERED FACE TYPE WITH WIHITE FINISH.
PROVIDE THROW AS INDICATED ON DRAWING.
2. EGGCRATE GRILLES SHALL BE ALL ALUMINUM CONSTRUCTION WITH ½" SQUARE
EGGCRATE LOUVERS, 1" DEEP, WITH WHITE FINISH
BUILDING'S THERMAL ENVELOPE SHALL BE INSULATED WITH 2"
THICK, 1.5 PCF DENSITY, BLANKET TYPE FIBERGLASS INSULATION
WITH VAPOR BARRIER ANO MINIMUM R-VALUE OF 8.0.
6. ALL DUCTWORK EXPOSED OUTSIDE SHALL BE INSULATED WITH
RIGID INSULATION (MIN R-VALUE OF 8.0) ANO COMPLETELY
COATED WITH WEATHERPROOF MASTIC COATING SUITABLE FOR
METAL DUCTWORK AND THERMAL INSULATION. THE COATING SHALL
HAVE A WHITE COLOR WITH SERVICE TEMPERATURE RANGE OF
-20• TO 180"F, NONFLAMMABLE WHEN WET, MAXIMUM FLAME
SPREAD RATING OF 15, SMOKE DEVELOPED RATING OF ZERO.
7. ALL CHILLED WATER PIPING SHALL BE INSULATED WITH 1.5 INCH
THICK CELLULAR GLASS INSULATION. CHILLED WATER STORAGE
TANK ANO EXPANSION TANK SHALL BE INSULATED WITH 2 INCH
THICK CELLULAR GLASS INSULATION. JACKETING FOR OUTDOOR
APPLICATIONS SHALL BE .016 INCH ALUMINUM. INSULATION ON
VALVES, ELBOWS ANO FITTINGS SHALL BE PRE-FORMED CELLULAR
GLASS.
8. ALL CHILLED WATER PIPING, TANKS ANO ACCESSORIES SHALL BE
COVERED WITH HEAT TRACE TAPE FOR FREEZE PROTECTION.
FREEZE PROTECTION TAPE SHALL BE PROVIDED FOR ALL ABOVE
GROUND WATER PIPING OUTSIDE THE BUILDING AND SELECTED TO
MATCH PIPE SIZE, INSULATION THICKNESS, ANO O DEGREE F
AMBIENT TEMPERATURE IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS. TAPE SHALL MAINTAIN 40
DEGREES F MINIMUM WATER TEMPERATURE AND SHALL BE SELF
REGULATING TYPE.
rrr, FLEXIBLE DUCT CONNECTION
THERMOSTAT/TEMPERATURE SENSOR
[fil DUCT SMOKE DETECTOR
AHU AIR HANDLING UNIT
ATU AIR TERMINAL UNIT
CH CHILLER
p PUMP vso W,RIABLE SPEED DRIVE
EH ELECTRIC HEATER
EF EXHAUST FAN
SF SUPPLY FAN
AFMS AIR FLOW MEASURING STATION
2. MAXIMUM STATIC PRESSURE DROP SHALL BE RATED AT MAXIMUM CFM FOR THE AIR VALVE ANO COIL
9. AIRFLOW MEASURING STATION SHALL BE A RUSKIN EAMS
ELECTRONIC AIR MEASURING STATION OR APPROVE EQUAL
AMFS DIA DIAMETER
3. ELECTRIC HEATERS SHALL INCLUDE BOTH A MANUAL ANO AUTOMATIC RESET SAFETY CUTOUT SWITCH. PROVIDE AN AIRFLOW SWITCH
AND A BUILT-IN POWER DISCONNECT SWITCH INTERLOCKED WITH THE ACCESS DOOR. PROVIDE BUILT-IN CONTROL VOLTAGE
TRANSFORMER.
LABORATORY AIRFLOW CONTROL VALVES
AIRFLOW
EXT.
FAN SCHEDULE
MAXIMUM
MAX.
SHALL HAVE A 3% ACCURACY BETWEEN 100 FPM ANO 2000 FPM
ANO SHALL HAVE A DAMPER WITH ACTUATOR TO MAINTAIN THE
DESIRED RETURN AIR FLOW RATE.
OA OUTSIDE AIR
UG UNDERGROUND
W/ WITH
AFF ABOVE FINISH FLOOR
SERVICE
HOOD EXHAUST
LAB 13
GENERAL EXHAUST
LAB 14
HOOD EXHAUST
REMARKS
PHONIX CONTROLS
ACCELL II
PHONIX CONTROLS
ACCELL II
PHONIX CONTROLS
ITEM
EF-1
EF-2 & 3
EF-4 & 5
CFM
2,470
1,250
STATIC
IN. WG
0.3
4.0
4.0
TYPE
ROOF MOUNTED CENTRIFUGAL
DIRECT DRIVE
FIBERGLASS BACKWARD
CURVED CENTRIFUGAL
FIBERGLASS BACKWARD
CURVED CENTRIFUGAL
SONE
RATING
5.0
MOTOR
HP
1/30
1.5
DISCONNECT SWITCH
SOLID STATE SPEED CONTROL
HARTZELL MODEL 41
ARRANGEMENT 10, VERTICAL DISCHARGE
HARTZELL MODEL 41
ARRANGEMENT 10, VERTICAL DISCHARGE
WATER COIL
AIR
VENT
PRESSURE/TEMPERATIJRE
TEST PLUG (lYP)
IL • 3-WAY MODULATING
11 '1 1-.-'1.'\--, CONTROL VALVE
I
VALVE (TYP)
_j w
HOOD EXHAUST
LAB 13
GENERAL EXHAUST
PHONIX CONTROLS
ACCELL II
PHONIX CONTROLS
1. REFER TO ELECTRICAL PLANS FOR POWER CONNECTIONS.
2. EF-2, 3, 4, & 5 SHALL BE CONTROLLED BY A VFO.
UNION (lYP) 1 r:::
LAB 13
HOOD EXHAUST
LAB 14
SUPPLY AIR
LAB 13
SUPPLY AIR
LAB 14
SUPPLY AIR
LAB 15
GENERAL EXHAUST
ACCELL II
PHONIX CONTROLS
ACCELL II
PHONIX CONTROLS
ACCELL II
PHONIX CONTROLS
ACCELL II
PHONIX CONTROLS
PHONIX CONTROLS
1. REFER TO ELECTRICAL PLANS FOR POWER CONNECTIONS. 2. PROVIDE CHILLER WITH FACTORY MOUNTED GFI CONVENIENCE OUTLET, SINGLE 3HP PUMP, STRAINER W/BLOWDOWN VALVE. EXPANSION
Y-STRAINER WITH HOSE END
DRAIN VALVE ANO CAP
SHUTOFF VALVE
(lYP)
LAB 15
HOOD EXHAUST
LAB 15
HOOD EXHAUST
ACCELL II
PHONIX CONTROLS
ACCELL II
PHONIX CONTROLS
TANK, PRESSURE GAUGES, DRAIN & VENT PLUGS, FLOW SWITCH, ANO BALANCING VALVE.
3. PROVED CHILLER WITH FACTORY INSTALLED MINIMUM LOAD CONTROL THAT ALLOWS UNIT TO OPERATE DOWN TO A MINIMUM OF 15%
CAPACITY.
I 1 'AHU CHILLED WATER COIL PIPING DETAIL
MOO 1 NOT TO SCALE
I
<C
LAB 15 ACCELL II MANUAL DAMPER
W/2" STANDOFF SUPPLY DUCT RETURN DUCT "' 1. REFER TO ELECTRICAL PLANS FOR POWER CONNECTIONS.
ELECTRIC DUCT HEATER SCHEDULE
DUCT WRAP (TYP)
HANGER ROOS OR
STRAPS UP TO
STRUCTURE
ROUND METAL
r-.¢::u.. ,p.::,;;::s:::::s- r
NYLON CLAMP - ._.,,.-1 )
(TYP) --
I
DUCT WRAP (TYP) ---':t====
REVISJON , DATE
AIRFLOW AIR P.O. DUCT CAPACITY AIR AIR AIR TERMINAL UNIT SUPPLY DUCT DUCT WRAP (TYP)
> ---- PREINSULATED
FLEX. DUCT
NYLON CLAMP (TYP) _// I
PREINSULATEO------------------►1/
' ) FLEX. DUCT
ROUND METAL DUCT
SAME SIZE AS ATU
CONNECTION (MINIMUM
OF 2 DIAMETERS LONG)
ROUND METAL BRANCH DUCT
SAME SIZE AS ATU CONNECTION
UNLESS NOTED OTHERWISE
'> '> -------- SQUARE TO
ROUND TRANSITION
--t
IJ "
fu- &'" / _Ji J.I _J,\_ = J
LAY-IN DIFFUSER
RETURN ------------------ n
AIR BOX
PAINT INTERIOR
FLAT BLACK
LAY-IN EGGCRATE
i
JOB NO.
20081071
DATE
11/19/08
DESIGN
TAM
1. DUCT HEATERS SHALL BE THE OPEN COIL TYPE. THE FRAME SHALL BE THE INSERT TYPE ANO THE FRAME ANO CONTROL BOX SHALL BE CONSTRUCTED OF ALUMINIZEO STEEL. THE CONTROL BOX SHALL BE OUST TIGHT CONSTRUCTION WITH A HINGED ACCESS DOOR. HEATERS SHALL BE UL LISTED FOR ZERO CLEARANCE TO COMBUSTIBLE MATERIALS. THE ELEMENTS SHALL BE CONSTRUCTED OF 80% NICKEL, 20% CHROMIUM COILED RESISTANCE WIRE. CONTROLS SHALL INCLUDE AUTOMATIC RESET ANO MANUAL RESET DISC TYPE THERMAL CUTOUTS.
NOTE:
1. COORDINATE THE LOCATION OF ALL ATU'S TO ENSURE THAT PROPER CLEARANCES ARE MAINTAINED.
GRILLE
NOTE: INSTALL NYLON CLAMPS ON INNER FLEX DUCT LINER AND OUTER JACKET.
REVIEW
RTS
PROVIDE A PRESSURE DIFFERENTIAL SWITCH IN THE HEATER TO PREVENT OPERATION WITH INADEQUATE AIR FLOW. M001
2. REFER TO ELECTRICAL PLANS FOR POWER CONNECTIONS. r 2 '',SINGLE DUCT ATU INSTALLATION DETAIL 001 NOT TO SCALE t-3-',-T-YtPI-C-A-L -D-I-F-FU-S-E-R-/-GR-IL-LE--I-NS-T-A-L-LA-T-IO-N--D-E-TA-I-L iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii--iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiimiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiil
DUC
OUTDOOR R HANDLING UNIT SCHEDULE
CFM
EXTERNAL COOLING CAPACITY
STATIC 1------,---- ----,-----,--E-N_T_E_R_IN_G_A_IR---r---LEA_V_IN_G_A,-IR-...,...,..---C-H-IL-L-ED_W_A_T_E_R --------
PRESS. MAX. F.V. COIL P.D. TOTAL SENS.
ELECTRIC
HEATER
kW
MAX.
MOTOR
HP
FILTER
THICKNESS/
EFFICIENCY
TOTAL O.A.
IN. WG FPM IN. WG MBH MBH DB °F WB °F DB ·F WB ·F GPM IN °F OUT °F P.D. FT.
AHU-1
3.5
0.5
241 91.9
77.9
55.6
55.0
16 40
4"/
MERV 7
SCR HEATER CONTOL
AIR TERMINAL UNIT SCHEDULE
PRIMARY
MAX./MIN.
HEATING
MAXIMUM
S.P. DROP
IN. WG
HEATING CAPACITY
REMARKS CAPACITY
KW
ENTERING
AIR °F
LEAVING
AIR °F
HEATING
STAGES
ATU-1
1200/480
6.0
SINGLE DUCT
MAX. N.C.=30
ATU-2
350/140
2.0
ATU-3
320/135
ATU-4
220/110
1.5
55 98
ATU-5
320/140
AIR DISTRIBUTION SCHEDULE
DESIGNATION
DESCRIPTION
A 6"x6" NECK CEILING DIFFUSER, 2'x2' LAY-IN PANEL
B 9"x9" NECK CEILING DIFFUSER, 2'x2' LAY-IN PANEL
C 12"x12" NECK CEILING DIFFUSER, 2'x2' LAY-IN PANEL
0 15"x15" NECK CEILING DIFFUSER, 2'x2' LAY-IN PANEL
E 1'x2' EGGCRATE CEILING GRILLE, LAY-IN FRAME
G 1'x1' EGGCRATE CEILING GRILLE, FLANGED FRAME
H 12"x12" NECK CEILING DIFFUSER, FLANGED FRAME
AIR-COOLED CHILLER SCHEDULE
CAPACITY
TONS
MAX.
COMP.
KW
CHILLED WATER
COND.
AIR °F
GPM IN .F OUT •F P.D. FT.
CH-1
38 83
56 44
95 YORK MODEL YCAL0043EE28 W/
HYDRONIC KIT
MAX
AIRFLOW
CFM
MIN
AV-1
AV-2
AV-3
AV-4
AV-5
AV-6
AV-7
AV-8 550
AV-9
AV-10
AV-11
AV-12
ITEM CFM IN. WG SIZE kW IN °F OUT °F REMARKS
EH-1
0.2 16"9)
11.0
SCR CONTROL
EH-2
0.2
12"9>
5.0
EH-3
0.2
18"x1O"
8.0
HOOD H-6
HOOD H-J
SPACE
-l_L-= 8-J n f3
I.I..-
=-s
I SPACE I SPACE I SPACE >
j
I 0
T
T 7 I z
AHU RETURN
EH SPACE SEQUENCE OF CONTROLS
AIR MONITORING
STATION
f----7---1---8--7
AV
----------- I : C HWS
: I I I I
E f--
- J f+l I
. ------ --. I I
PHOENIX J
CONTROLLER
[!] rp I I I I
I I M I
VARIABLE AIR VOLUME AHU:
WHEN THE AHU IS IN THE OCCUPIED MODE, THE SUPPLY FAN WILL OPERATE
CONTINUOUSLY, THE OUTSIDE AIR AND RETURN AIR DAMPERS WILL MODULATE TO
PROVIDE A FIXED OUTSIDE AIR CFM, AND THE VARIABLE FREQUENCY DRIVE WILL
MODULATE TO MAINTAIN A DUCT STATIC PRESSURE OF +2.0 ·we. THE AHU Will BE SHUT DOWN AND ALARMED DUE TO THE FOLLOWING SAFETIES: SMOKE DETECTOR. FREEZESTAT, FAN MOTOR FAILURE, VSD FAILURE, AND STATIC PRESSURE HIGH LIMIT.
CHILLED WATER SYSTEM:
THE CHILLED WATER SYSTEM SHALL BE ENABLED BY THE EMCS. THE CHILLER AND
PUMP SHALL RUN WHENEVER THERE IS A CALL FOR COOLING FROM THE AHU. THE
CHILLER INTEGRAL CONTROL PANEL SHALL CONTROL THE CHILLER OPERATION TO
MAINTAIN A CONSTANT 44 DEGREES F LEAVING WATER TEMPERATURE. IF THE PUMP
FAILS, AN ALARM Will BE GENERATED AND THE CHILLER WILL SHUT DOWN. CHILLER ALARMS WILL BE MONITORED BY THE EMCS.
r-r -T---,,-,- I I I CHWR I ---I I I M I
THE EMCS WILL REMOTELY MONITOR AND ADJUST THE SYSTEM STATIC PRESSURE
SETPOINT. THE EMCS WILL REMOTELY MONITOR AND ADJUST THE VSD ANO FAN MOTOR. THE EMCS WILL PROVIDE A START/STOP SIGNAL TO THE VSD.
GENERAL EXHAUST FANS:
I tn771 I I I I l I I L--T-
WHENEVER THE AHU IS "ON", THE CHILLED WATER VALVE AND THE ELECTRIC HEATER
EXHAUST FAN EF-1 SHALL RUN CONTINUOUSLY DURING OCCUPIED HOURS AND SHALL
BE OFF DURING UNOCCUPIED HOURS.
OUTSIDE
AIR
FILTER
MIXING
BOX
I I [I] I [I] [I] _..+----, ' I
[e]
AHU
SUPPLY
WILL MODULATE TO MAINTAIN THE SPECIFIED COOLING COIL DISCHARGE AIR
TEMPERATURE. THE CHILLED WATER VALVE WILL BE CLOSED IF THE AHU IS "OFF".
THE WATER VALVE ACTUATORS WILL BE ELECTRONIC. THE EMCS WILL PROVIDE
REMOTE MONITORING, ALARM AND SETPOINT ADJUSTMENT FOR THE COIL DISCHARGE
AIR TEMPERATURES. REMOTE MONITORING AND ALARMS SHALL BE PROVIDED FOR
MIXED AIR LOW LIMIT, WATER VALVE POSITION, OUTSIDE AIR CFM, AND FILTER
PRESSURE DROP.
THE EMCS SHALL MODULATE THE RETURN AIR FLOW TO MAINTAIN POSITIVE PRESSURE
LAB EXHAUST FANS (EF-2, EF-3, EF-4 & EF-5)
THE LAB EXHAUST FANS SHALL BE VARIABLE VOLUME CONTROLLED BY STATIC
PRESSURE CONTROLLERS LOCATED IN EACH EXHAUST DUCTWORK SYSTEM. STATIC
PRESSURE SENSORS SHALL BE SUITABLE FOR USE IN CORROSIVE AIR STREAMS. THE
STATIC PRESSURE SENSORS ANO CONTROLLERS WILL BE SET TO MAINTAIN A NEGATIVE
-2.0 INWC. PRESSURE. AS THE PRESSURE IN THE DUCT SYSTEM RISES INDICATED BY
AN EXHAUST AIR VALVE OPENING THE CONTROLLER WILL SPEED UP THE VFD TO
PREHEAT
COIL
COOLING
COIL
LJ------- ------------------
IN THE BUILDING AND NEGATIVE PRESSURE IN THE LABS. THE REQUIRED RETURN AIR
FLOW RATE Will BE CALCULATED BY SUMMING THE AIRFLOWS FOR ATU-1, 2, 3, 4, AND 5 AND SUBTRACT 900 CFM FROM THAT VALUE. THIS CALCULATED VALUE WILL
BE THE REQUIRED RETURN AIR FLOW RATE. THE EMCS WILL COMPARE THE
CALCULATED RETURN AIR FLOW RATE TO THE ACTUAL RETURN AIR FLOW RATE
MEASURED BY THE RETURN AIR FLOW MEASURING STATION ANO WILL MODULATE THE
RETURN AND OUTSIDE AIR DAMPERS IN MAINTAIN THE REQUIRED RETURN AIR FLOW
MAINTAIN THE -2.0 INWC. AS THE EXHAUST VALVES CLOSE OFF AND THE PRESSURE
GOES MORE NEGATIVE IN THE DUCT SYSTEM, THE CONTROLLER WILL SLOW DOWN THE
VFO TO MAINTAIN -2.0 INWC. IN THE EVENT THE PRESSURE APPROACHES 0.00 INWC.
INDICATING A FAN FAILURE OR A FAN BEING TURNED OFF, THE CONTROLLER SHALL
START THE BACK-UP EXHAUST FAN.
1 VARIABLE AIR VOLUME AHU FLOW DIAGRAM RATE.
CHILLER CH-I
T ---7 F ---
I I I I I
M002 NOT TO SCALE
AHU-1
CONTROLS LEGEND
[!] TEMPERATURE SENSOR
[e] PRESSURE SENSOR
[El FLOW SWITCH
[ID CURRENT SWITCH
[g] ELECTRIC HEAT CONTROLLER
SMOKE DETECTOR (DIV. 16000)
AIR TERMINAL UNITS:
WHEN THE SPACE TEMPERATURE IS ABOVE THE COOLING SETPOINT, THE ELECTRIC
HEAT WILL BE OFF AND THE AIR VALVE WILL MODULATE TO MAINTAIN SPACE
TEMPERATURE. WHEN THE SPACE TEMPERATURE IS AT OR BELOW THE COOLING
SETPOINT, THE AIR VALVE WILL REMAIN AT THE MINIMUM SCHEDULED AIRFLOW. WHEN
THE SPACE TEMPERATURE FALLS BELOW THE HEATING SETPOINT, THE ATU ELECTRIC
HEAT WILL STAGE TO MAINTAIN SPACE TEMPERATURE. THE AIR VALVE ACTUATOR AND
ELECTRIC HEAT ACTUATOR WILL BE ANALOG ELECTRONIC. THE DOC CONTROLLER WILL
HAVE AN ON-BOARD DIFFERENTIAL PRESSURE TRANSDUCER FOR MONITORING AIR
FLOW RATE.
I t
E;J--·m@ E;J--,IDQ z I r Mil-4b---J
- ---7-------------B ------------ L l0 MOTORIZED ACTUATOR
I I p=J FLOW METERING STATION
I I I I I I I I I I I-
T - - - ---l I
: CHILLED WATER
MAKEUP WATER _ cX TRIPLE DUTY VALVE
I I I I I I I
<C mt-
1 PUMP P-1
AIR SCOOP
CONTROL VALVE r JI
_JI
I I --l---------- -----T ------------ 7 (/)
INSTALL AIR SCOOP IN CHILLED WATER
RETURN PIPE AS HIGH AS POSSIBLE
'---- --------, ------- $P, EXHAUST AIR :
I cwW>< a<:(::
I -z (..'.)
2 CHILLED WATER SYSTEM FLOW DIAGRAM
M002 NOT TO SCALE
EXPANSION
TANK
1---------- 1----------
LAB 14
A'L=2. r-·
L-------
LAB 15
AV-10 r - .
AY-12 -------
AY-11
I 0..-.. <C <( I I- ..J I a.. <(
_J
I n. ..J 0 a::: I- I L- .... , I I I L- ..., I I I w
I t- <C z z
I I I I
PRESSURE/TEMPERATURE
I
TEST PLUG (TYPICAL) I
I I
I I I I I I
I I I I I I I I I I I I I I ! I ccn t- 0 t- _J
(!) 0 0- D... <C <(
I
PHOENIX
CONTROLLER
----rp
HOOD H-1
HOOD H-2
PHOENIX
CONTROLLER
----rp 1
PHOENIX
CONTROLLER
----rp
HOOD H-4
J_
HOOD H-5
I OD: 0w
I <CO
I I :I: (!)
I
--L· ---------------------- --------------+------------------ I I I I I I I I I I I I I I
I <C I I LI tH .E.t1::.1 I I I I I C
CHECK VALVE (TYP)
SHUTOFF VALVE (TYP)
I ='--,-1
II
AV-7
L _
I I L - E ......,_...,I .El:i=.2.
I I
1 AV-8
L _
I L------ Ell I El::6i =L..., I
I I AV-9
L _
I :e:,n I I I
I REVJSION DATE
FLEXIBLE PIPE (TYP)
FAN 1 t-t- - - - - - -'- - - - - - - - - - - -- - - - - - - - - - - - - - - - - - ..l-- - - - - - - - - - - - - - - - -
SUPPLY AIR
I I
II
1- lI- - - - --' '-- - - - -,l, I I I
CONCRETE PAD
FLOW SWITCH
--------, -------------------------- r:::::l :
M I i.::::.r
J
JOB NO.
20081071
DATE 11 19 08
TRIPLE DUTY VALVE ---1- :i------iI'r : 11
;l ---------------,;;:::;;-;;;;;-;,;; ------------------------------------------------------------------------------------- 5·J
RETURN AIR
DESIGN
TAM
NOTE:
PIPING LOCATED OUTSIDE SHALL BE WRAPPED WITH
HEAT TRACE TAPE, INSULATION AND METAL JACKETS.
AIR MONITORING
STATION
REVIEW
RTS
4 AIR-COOLED CHlLLER PIPING DETAIL
M002 NOT TO SCALE
3 OA EA CONTROL SCHEMATIC
M002 NOT TO SCALE M002
EXHAUST AIR
AT
I
I
I
I
I
| Location Map |
| Statement of Work: |
| Site Visit: |
| Safety: |
| Base Bid: |
| Contractor Responsibility: |
| Material Submittals: |
| Demolition Procedure: |
| Damage to Property: |
| Inspection and Acceptance: |
| Project Schedule: |
| Work Hours: |
| Project Contacts: |
| TBD |
| Appendix: |
| MECHANICAL SPECIFICATIONS |
| MECHANICAL LEGEND |
| LABORATORY AIRFLOW CONTROL VALVES |
| FAN SCHEDULE |
| I 1 'AHU CHILLED WATER COIL PIPING DETAIL |
| ELECTRIC DUCT HEATER SCHEDULE |
| NOTE: |
| SEQUENCE OF CONTROLS |
| 1 VARIABLE AIR VOLUME AHU FLOW DIAGRAM |
| CONTROLS LEGEND |
| 2 CHILLED WATER SYSTEM FLOW DIAGRAM |
| NOTE: |
| 3 OA EA CONTROL SCHEMATIC |
File details come from the government source that posted it. Updated .