Attachment-F_Cost_Estimate.xlsx

XLSX spreadsheet 22 KB Posted

Attached to
HAFC ARCH WE FABRICATION Federal contract opportunity
Solicitation number
140P2122R0023
Issued by
Department of the Interior National Park Service

View the file

Other files for this federal contract opportunity

Other files attached to HAFC ARCH WE FABRICATION, newest first.
File Type Posted
Sol_140P2122R0023_Amd_0001.pdf PDF
Attachment-C_VIS_and_WaysideHardwareSpecificationManual(1).pdf PDF
Attachment-D_Panel_Specifications(1).docx DOCX document
Attachment_A_Layouts.pdf PDF
Attachment-B_Programtic_Accessibility_Guidlines(3).pdf PDF
Attachment-E_Past_Performance_Questionnaire.pdf PDF
Sol_140P2122R0023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gov't Est

ARCH: Wayside Fabrication Estimate
PROJECT MANAGEMENT$0.00
FABRICATION DRAWINGS$0.00
SAMPLES$0.00
EXHIBIT STRUCTURES$0.00
DISPLAY OBJECTS & SPECIALTY$0.00
ELECTRICAL/ ELECTRONIC$0.00
GRAPHIC PANELS$0.00
PROJECT CLOSEOUT$0.00
SHIPPING$0.00
TOTAL$0.00
Rounded to$0
PROJECT MANAGEMENT (excluding travel)
LABORhoursxrateamount
Project Managerhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Project Management $0.00

Edit Government files and create Fabrication Drawings for Base and tactile stuctures
MATERIALS:qty.unitunit costamount
Miscellaneousjob$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
designerhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Fabrication Drawings $0.00

Samples/Mock-ups/Prototypes
MATERIALS:qty.unitunit costamount
Ex 013E Balanced Rock modelea$0.00
Ex 019B Planispher modelea$0.00
Ex 022E Delicate Arch modelea$0.00
Ex 036E Fins modelea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
exhibit spec-fabricationhours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Samples $0.00

Exhibit Structures/Bases
MATERIALS:qty.unitunit costamount
Upright – inground - Double in line: 36”x48” adjacent to 24”x24” over a 12”x12”. The 12”x12” consists of 4 interchangeable holders.ea$0.00
Upright – baseplate - Double in line: 36”x48” adjacent to 24”x24” over a 12”x12”. The 12”x12” consists of 4 interchangeable holders.ea$0.00
Low Profile – weighted sled - 36”x24”ea$0.00
Low Profile – in ground - 36”x24”ea$0.00
Low Profile – in ground 42”x24”ea$0.00
Low Profile – in ground 36”x24” with 30”x24” tactile tableea$0.00
Low Profile – weighted sled – 36”x24” with 30x24 tactileea$0.00
Low Profile – baseplate– 36”x24”ea$0.00
Upright – in ground – 12”x12”ea$0.00
Upright – in ground – double sided – 12”x12”ea$0.00
Upright – in ground with three sections: 24”x12” over two 12”x12”’sea$0.00
SUBTOTAL MATERIALS0$0.00
MARK-UP on materials15percent0

TOTAL ALL MATERIALS $0.00

LABORhoursxrateamount
Shop Supervisorhours @$0.00
Exhibit Spec-Fabricationhours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Exhibit Structures $0.00

Display Objects and Specialty Elements
MATERIALS:qty.unitunit costamount
13E - Balanced Rockea$0.00
19B - planisphereea$0.00
22E - Delecate Archea$0.00
36E - Finsea$0.00
modls/clay/platicea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Graphic Specialisthours @$0.00
Model Makerhours @$0.00
3D printerhours @$0.00
TOTAL ALL LABOR$0.00

TOTAL DO and SE $0.00

Electrical/Electronic
MATERIALS:qty.unitunit costamount

ea $0.00

SUBTOTAL, AV EQUIPMENT$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibit spec-AV techhours @$0.00
Exhibit sepc - Lightinghours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Electrical/Mechanical/AV $0.00

Graphic Panels
MATERIALS:qty.unitdig outputamount
9.5"x9.5" HPLea$0.00
36"x48" Aluminumea$0.00
24"x24" Aluminumea$0.00
36"x24" Aluminumea$0.00
42"x24" Aluminumea$0.00
30"x24" Aluminumea$0.00
12"x12" Aluminumea$0.00
30"x24"Aluminumea$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Graphics Supervisorhours @$0.00
Graphics Specialisthours @$0.00

TOTAL ALL LABOR $0.00

TOTAL Graphics $0.00

PROJECT CLOSEOUT
MATERIALS:qty.unitunit costamount
miscellaneousjob$0.00
SUBTOTAL MATERIALS$0.00
MARK-UP on materialspercent$0.00
TOTAL ALL MATERIALS$0.00
LABORhoursxrateamount
Exhibits Specialisthours @$0.00
TOTAL ALL LABOR$0.00

TOTAL Project Closeout $0.00

SHIPPING
MATERIALS:qty.unitunit costamount
Packingjob @$0.00
Shippingjob @$0.00

TOTAL MATERIALS $0.00

LABORhoursxrateamount
Exhibit Spec - Fabricationhours @$0.00

TOTAL ALL LABOR $0.00

Total Shipping $0.00

INSTALLATION

MATERIALS:qty.unitunit costamount
air fare0job @ERROR:#VALUE!
per diem0days @ERROR:#VALUE!
Lodging0days @ERROR:#VALUE!
Rental car and gas0days @ERROR:#VALUE!

Misc. concrete, weights, and equipment rental 0 job @ ERROR:#VALUE!

TOTAL MATERIALS 4 crew ERROR:#VALUE!

File details come from the government source that posted it. Updated .