ATTACHMENT E QASP.docx
DOCX document 37 KB Posted
- Attached to
- R499--RX Returns Federal contract opportunity
- Solicitation number
- 36C25623Q0208
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for a pharmacy services contract. The contract is between the Department of Veterans Affairs and an incumbent contractor to provide prescription controlled substances removal services from January 2023 through December 2027. Key performance standards include providing qualified personnel within 10 business days of a request, maintaining all necessary certifications and licenses, and providing detailed processing reports within 30 days of each service period. Performance will be evaluated on timeliness, report details, and customer feedback. Incentives like exercising option periods and positive past performance evaluations will be used for meeting or exceeding standards. The QASP establishes methods for monitoring like periodic inspections, customer feedback, and 100% inspections to rate performance as excellent, satisfactory, or unsatisfactory. Meetings will be held quarterly to assess performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25623Q0208 0001.docx | DOCX document | |
| Harrison Cty MS WD 2015-5147 R19 dtd 06-27-2022.pdf | ||
| ATTACHMENT B PAST PERFORMANCE QUESTIONNAIRE.doc | DOC document | |
| Bay County FL WD 2015-4559 R21 dtd 07-29-2022.pdf | ||
| ATTACHMENT D NOTIFICATION OF COMPLIANCE WITH INSURANCE REQUIREMENTS.docx | DOCX document | |
| Escambia Cty FL WD 2015-4561 R21 dtd 07-29-2022.pdf | ||
| ATTACHMENT C CONTRACTOR CERTIFICATION.docx | DOCX document | |
| ATTACHMENT A LIST OF PAST PERF REF.docx | DOCX document | |
| 36C25623Q0208.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Pharmacy Service
Contract Number: (The Government will enter contract number upon award.)
Contract Description: Prescription Controlled Substances Removal Services
Contractor’s name: (hereafter referred to as the Contractor)
Period of Performance: January 1, 2023 through December 31, 2027 (base plus four option periods)
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored.
· How monitoring will take place.
· Who will conduct the monitoring.
· How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Rene’ Impey Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO) 16 Gulf Coast Veterans Health Care System, Biloxi, MS 39531
ATTACHMENT E - QUALITY ASSURANCE SURVEILLANCE PLAN 36C25623Q0208
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: Joni Groat, Program Analyst
c. Other Key Government Personnel: Charles Nate Smith, Chief, Pharmacy Service
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager: (Contractor please provide name here)
b. Other Contractor Personnel: (Contractor please enter name(s) or delete these lines if not applicable.)
Title: (Contractor please enter title(s) or delete these lines if not applicable.)
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.
Performance Requirements Summary Matrix:
The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Task
Standard
| Acceptable Quality Level |
| Method of Surveillance |
Incentive
Processing Contractor shall provide qualified personnel to work on site within 10 business working days.
98%
Periodic Inspection
Positive Past Performance & Exercise of Option Period
Certifications Current Must maintain regulatory requirements and license.
100%
Compliant
Task
Standard
| Acceptable Quality Level |
| Method of Surveillance |
Incentive
Deliverable Contractor shall provide detail reports within 30 days after processing.
Reports to information listed in Statement of Need.
Customer Feedback
Training, if applicable Contractor to provide training on system at no extra cost and provide user guide
98%
Customer Feedback
5. INCENTIVES
The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. PERFORMANCE MANAGEMENT APPROACH. (The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives.)
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
c. CUSTOMER FEEDBACK. (Elements of validated user complaints. Complaints are then investigated and validated.)
e. 100% INSPECTION. (Evaluates all outcomes.)
f. REPORTING. (Demonstrates whether the contractor meets the stated objectives and/or performance standards.)
g. REVIEWS AND RESOLUTIONS. Meeting with contractor and COR and/or CO to discuss performance evaluation, such as cost, schedules, etc.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Excellent (“E”) = Exceeds Standards Satisfactory (“S”) = Meets Standards Unsatisfactory (“U”) = Fails To Meet Standards
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.
(After award, both the contractor’s Program Manager and the COR shall sign this document.)
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
Contract Discrepancy Report
| Contract No. |
| Report No. for this Discrepancy: |
| Contractor/Manager’s Name: |
| From: (Name of Project Officer) |
Dates
| Prepared: |
| Returned by Contractor: |
| Action Complete: |
Discrepancy or Problem:
Signature of Contracting Officer:
| To: (Contracting Officer) |
| From: (Contractor) |
Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)
| Signature of Contractor Representative: |
| Date: |
Government Evaluation:
Government Actions:
Close Out
| Name |
| Title |
| Signature |
| Date |
Contractor Notified
Project Officer
Contracting Officer
File details come from the government source that posted it. Updated .