ATTACHMENT D.1 - QASP.pdf
PDF 734 KB Posted
- Attached to
- SPS SERVICES Federal contract opportunity
- Solicitation number
- 36C25723Q0788
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for sterile processing services provided under solicitation number 36C25723Q0788 by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. The contractor shall provide all labor, tools, materials, equipment, transportation and sterile processing services necessary to support El Paso Veterans Health Care System locations. Performance will be monitored on completion of decontamination and sterilization of surgical trays and instrumentation within 24 hours with 95% acceptability, as well as prompt damage reporting within one hour at a 95% rate. Acceptable performance will be recognized while unacceptable performance will result in a Contract Discrepancy Report requiring a corrective action plan. Quarterly performance assessment meetings will be held and an annual performance rating assigned.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT D.1 - COMPLIANCE OBLIGATIONS.pdf | ||
| 36C25723Q0788 P0002.pdf | ||
| 36C25723Q0788 0001.docx | DOCX document | |
| 36C25723Q0788.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For: Sterile Processing Services (SPS)
Contract Number: ________________(enter after contract award)
Contract Description: The contractor shall provide all labor, tools, parts, materials, equipment, supervision, supplies, transportation, and sterile processing services necessary in support of El Paso Veterans Health Care System locations for the performance periods specified in the aforementioned contract.
Contractor’s name: ______________ (hereafter referred to as the contractor).
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored.
How monitoring will take place.
Who will conduct the monitoring.
How monitoring efforts and results will be documented.
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. GOVERNMENT ROLES AND RESPONSIBILITIES
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned CO: Latasha Messer Organization or Agency: Department of Veterans Affairs
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR:
c. Other Key Government Personnel –
Assigned Contract Specialist: Dayna Cantu
3. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager (for Contractor) - __________________
b. Other Contractor Personnel - _______________________ Title: __________________________
4. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
The Performance Work Statement (PWS) includes performance standards. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).
Measure (ID)
PWS
Reference Performance Requirement
Acceptable Quality Level
Surveillance Method Incentive
1 D, 7.
The Contractor will complete the decontamination and sterilization of the EPVAHCS surgical trays and instrumentation with a 24-hour turn-around time.
95%
Direct Observation, Random Sampling
Favorable contractor performance evaluation.
2 N, d.
Record and report promptly (within one hour) to the contracting officer or designated government representative all available facts relating to each instance of damage to government property.
95% Direct Observation, Random Sampling
Favorable contractor performance evaluation.
*Note: The definition of failure to complete is the failure to complete the assignment, not the time it takes to complete the assignment.
5. INCENTIVES
The Government shall use recognition in the contractor’s Past Performance Record as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance method listed below in the administration of this QASP.
a. VALIDATED USER/CUSTOMER COMPLAINTS. (Quality or Attendance Issues must be reported to the COR for action Relies on the VA Attorneys and Paralegals to identify quality issues. Complaints are then investigated and validated.)
7. RATINGS
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:
Exceeds: 2-5% above acceptable level in table above Meets: Reach acceptable level in table above Does Not Meet: 5% or more below acceptable level in table above
8. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
9. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement.
Throughout the contract, the COR will review feedback from requiring VA services on the quality of services provided by the contractor and report such feedback to the Contracting Officer.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor every quarter to assess performance and shall provide a written assessment.
EXCEPTIONAL: Performance meets contractual requirements and exceeds many to the Government’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Note: To justify an Exceptional rating, you should identify multiple significant events in each category and state how it was a benefit to the GOVERNMENT. However, a singular event could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
VERY GOOD:
Performance meets contractual requirements and exceeds some to the Government’s benefit.
The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Note: To justify a Very Good rating, you should identify a significant event in each category and state how it was a benefit to the GOVERNMENT. Also, there should have been NO significant weaknesses identified.
SATISFACTORY:
Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Note: To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. Also, there should have been NO significant weaknesses identified.
MARGINAL:
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Note: To justify Marginal performance, you should identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the
<After award, both the contractor’s Program Manager and the COR shall sign this document.>
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
CPAR RATINGS ASSIGNED TO QASP ITEMS:
Metrics and methods are designed to determine rating for a given standard and acceptable quality level.
The following ratings shall be used (Reference: CPARS User Manual https://www.cpars.gov/pdfs/CPARS-Guidance.pdf p. A2-1):
GOVERNMENT. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g. Management, Quality, Safety or Environmental Deficiency Report or letter).
UNSATISFACTORY:
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element being assessed contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Note: To justify an Unsatisfactory rating, you should identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the GOVERNMENT. However, a singular problem could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., Management, Quality, Safety or Environmental Deficiency Reports, or letters).
File details come from the government source that posted it. Updated .