This document is a Statement of Need for an emergency air-cooled chiller replacement at the North Florida/South Georgia VA Healthcare System Lake City VA Medical Center in Lake City, Florida. The VA requires the removal of an existing failed 200-ton air-cooled chiller and installation of a new high-efficiency 200-ton air-cooled chiller on the existing concrete pad. The contractor must disconnect and remove the old chiller; deliver, install, and connect the new chiller; expand the concrete pad if needed; connect chilled water, electrical, and BAS systems; commission and test the new chiller; and provide documentation and warranties. The new chiller must have a 10-year parts, labor, and refrigerant warranty and meet specified efficiency and operational requirements. The contractor must be qualified to perform the work and ensure employees take OSHA 10-hour construction safety training. All work must follow safety regulations and be coordinated and scheduled with the contracting POC and CO.

View the file

Other files for this federal contract opportunity

Other files attached to 4120--Equipment: Emergency Chiller Replacement, newest first.
File Type Posted
Attachment C Price - Delivery Schedule- Chiller.pdf PDF
36C24823Q1949_1.docx DOCX document
Attachment A Combined Synopsis Solicitation-Chiller.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B

36C24823Q1949

Statement of Need

Background:

The North Florida/South Georgia VA Healthcare System, Lake City VA Medical Center located at:

619 S Marion Ave Lake City, Florida has an emergency Brand Name or Equal requirement for One (1) Air-Cooled Chiller to replace the current Air-Cooled Chiller servicing the Community Living Center Building 82. This replacement is due to the mechanical failure(s) and is non-repairable.

Objective:

Disconnect and remove old chiller and relocate to a specified on-site location for temporary storage. Deliver and install the new chiller on the concrete pad and connect to the current electrical and chilled Water systems.

Kick Off Meeting: TBD after award: Conduct site visit with the Contracting Officer (CO) and Facilities Management Point of Contact (POC) prior to removal of old chiller and discuss installation of the new chiller to verify utilities, connection point sizing, and current concrete slab dimensions.

Scope:

• Disconnect existing chiller to include all mechanical and electrical utilities.

• Deliver 200-ton air cooled chiller.

• The new chiller to be installed on the old chiller concrete pad south of Building 82.

• Expand and upgrade current concrete pad as needed to support the new Chiller.

• Contractor reconnects the new chiller to the current chiller water piping.

• Provide and install Chilled water isolation and bypass valves.

• Contractor runs electrical wires and connects to current electrical transformer.

• Provide and install an electrical disconnect at the Chiller.

• Connect chiller to the Siemens Desigo Building Automated System (BAS).

• Connect to BAS using BACnet (BCI-C) Communication Interface

• Chiller must be operated and monitored via BAS.

• Setup Chiller to run via the BAS.

• Provide chiller programming in the BAS.

• Provide graphics for the chiller in the BAS.

• Provide for chiller alarms in the BAS.

• Test Operation of Chiller

• Ensure the Chiller maintains proper chiller water temperature, flow, and differential pressure to provide optimum Chiller performance and maintain building 82 temperatures.

• Put the Chiller into operation and commission.

• Provide all documentation to the Contracting Officer (CO) and the POC. Also, provide an electronic version of the documentation including warranties and guaranties.

NOTE: Salient Characteristics of Air-Cooled Chiller requested are based on current equipment on- site: Trane RTAF-200

Unit Overview

• Air-Cooled screw chiller

• Unit Nominal Tonnage - 200 Nominal Tons

• Unit efficiency - High Efficiency

• Refrigeration Capacity`190.5 tons

• Cooling Efficiency – 10.31 EER

• IPLV.IP – 16.74 EER

• NPLV.IP – 16.91 EER (Btu/W-h)

• Unit Voltage – 460.V/60Hz/3 phase

• Refrigerant Type – R-513A

• UL Listed

• Pressure Vessel Code - ASME pressure vessel code

• ASHRAE 90.1 Compliance

• BACnet (BCI-C) Communication Interface

• All unit controls are housed in an outdoor rated weather tight enclosure.

• A full color TD-7 AdaptiView touch screen display indicates all important unit and circuit parameters.

• Chilled Water Reset

• Factory installed evaporator water flow switch.

• Elastomeric Isolators between chiller and structure

• 10-year warranty on all parts / labor / refrigerant.

Evaporator Information

• Fluid Temperature

Evaporator Leaving - 44.00 F

Evaporator Entering – 54.00 F

• Flow Rate

Design Flow - 455.3 gpm

Min Flow - 202.0 gpm

• Construction Features

Configuration - 2 pass evaporator.

Fouling Factor – 0.000100 hr-sq ft-deg F/Btu

Condenser Information

• Unit Application

Standard ambient

Ambient Air Temp – 95.0 F

• Condenser Coil Option

Microchannel Coil

• Auxiliary Items

Oil Cooler

• Fan Type

Variable Speed Fans – 14 in quantity

Unit Electrical

• Compressor Starter

Variable Speed Compressors

• Total Power (min.)

221.8 kW

• Compressor Power (min.)

203.2 kW

• Fan Power (min.)

17.86 kW

• Incoming Power Line Conn. Type

Single Point Unit Power

• Power Line Conn. Type

Circuit breaker

• Short Circuit Current Option

Default amp rating

• Short Circuit Current Rating

10000 A

• Condenser Fan RLA (each)

2.50 A

• RLA/AFD input – Compressor 1A

164.00 A

• RLA/AFD input – Compressor 2A

136.00 A

• Single Point Power MCA (max.)

383 A

• Single Point Power MOP (max.)

500 A

Physical Information

• Dimension (approx.)

Length - 318 in

Width – 87 in

Height – 94 in

• Weights (approx.)

Operating Weight – 11502 lb

Shipping Weight – 11319 lb

• Refrigerant Charge (max.)

Circuit 1 – 134.3 lb

Circuit 2 – 129.4 lb

• Oil Charge (min.)

Circuit 1 – 1.96 gal

Circuit 2 – 1.96 gal

Rated Capacity (AHRI) (min.) -190.5 tons.

Unit Acoustics

A-Weight Sound Power Sound Pressure

100% 103 dBA 75 dBA

75% 96 dBA 68 dBA

50% 94 dBA 66 dBA

25% 91 dBA 63 dBA

Unit Sound Package

Standard noise

Qualifications/Certifications

• The contractor shall be qualified and have the required levels of professional and technical experience to perform the work required by this statement of work.

• The contractor and all the individuals working on the project site must have taken the OSHA Certified 10-hour construction safety course.

Safety Regulations

• All applicable safety regulations shall be observed during all work of this contract.

• The VA Safety Officer shall have full authority to see that the contractor obeys all safety rules and regulations relative to the fulfillment of this contract.

• Provide the necessary barricades/signage where required.

Scheduling and Hours of Work

• All work shall be scheduled with the POC and the CO.

• The 10 holidays observed by the Federal Government, are New Years Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas or any other day specifically declared by the President of the United States to be a national holiday.

File details come from the government source that posted it. Updated .