This document is a Statement of Work (SOW) for the installation of an electrical circuit from a 400A, 240V single-phase panel to a new 12'x24' walk-in cooler located north of the Soybean Annex building in Raleigh, North Carolina.
The SOW requires the contractor to furnish all personnel, equipment, tools, materials, supervision, and quality control necessary to install the circuit, including obtaining all necessary permits and licenses, routing the circuit through the north wall of the Soybean Annex and below ground to the south side of the cooler, installing a service disconnect, and terminating the circuit in the cooler's panel box. The contractor must also utilize bio-based products where possible, submit a site-specific safety plan, and complete the project within 60 days of the notice to proceed. Pricing is to be provided in a detailed, unlocked Excel format. The government will inspect and approve the work prior to acceptance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ_12405B24Q0128_Cooler Circuit Installation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Install Circuit for Exterior Walk-in Cooler
Plant Science Facility
3127 Ligon Street
Raleigh, North Carolina
Asset ID: 664500B011
Table of Contents
Statement of Work Page 3
Contractor Requirements Page 4
Project Schedule Page 5
Project Contacts Page 6
Pictures Page 7
Statement of Work: Provide all personnel, equipment, tools, materials, supervision, and quality control necessary to install a circuit from a 400A, 240v, single phase panel to a Polar King model H1224 cooler.
The contractor shall provide a technical proposal and detailed cost estimate for the entire project as specified in this statement of work. Descriptive literature and written specifications for the equipment in the proposal must be included with the quote. The detailed cost estimate shall provide a breakdown showing the equipment, labor, general conditions, etc.
Project Objective: To provide electrical service to the Polar King walk in cooler North of the Soybean
Annex Building (See Pictures, page 7).
Background: A new 12’x24’ walk in cooler was placed on a concrete slab North of the Soybean Annex building in 2023. A 400A, 240V, single phase Square D panel is installed on the interior of the North wall of the soybean annex, opposite the meter base (See pictures, Page 7). The cooler requires four conductors for service: L1, L2, Neutral and Ground. The circuit path will leave the 400A panel, penetrate the north wall of the Soybean annex where it will run in conduit below ground until reaching the walk-in cooler slab
(about 10ft away). From there, the circuit will run up the south side of the cooler to a contractor-supplied disconnect switch, then continue to the condensing unit atop the cooler.
Scope of Work:
Furnish all personnel, equipment, tools, materials, supervision, and quality control necessary to perform installation of circuit from the 400A panel to the walk-in cooler as defined in this SOW and in accordance with State and Local building authorities.
Contractor Requirements:
The contractor Shall:
• Obtain all building and trade permits necessary, to include any drawings, plans, permit and inspection fees, utility location, site surveys, and any other items necessary for compliance with
State, Local, and Federal building authorities.
• Possess appropriate trade license(s) for work being performed.
• Install conduit and circuit from Square D panel, through the North wall of the Soybean Annex, and below ground to the South side of the walk-in cooler. From there, route circuit up the walk-in cooler’s south side, install a service disconnect, and continue circuit to condensing unit. Circuit must be in conduit throughout its entire length.
• Terminate circuit in walk-in cooler’s panel box as per manufacturer and NEC guidelines.
• Seal and waterproof all penetrations; tape building insulation with fabric reinforced white insulation repair tape.
• Provide any other materials and work necessary to provide an installation consistent with applicable building codes and industry standards.
• Replace any building materials removed with like materials. Materials subject to COR approval prior to installation.
Site Visit: Vendors are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where Contract Documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a quote.
Utilization of Bio-Based Products: The contractor shall utilize products and material based from bio-based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer
Representative (COR). Products can be found at: www.biopreferred.gov http://www.biopreferred.gov/
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. Contractor shall furnish a Site-Specific Safety Plan (SSSP) and the Government shall review the SSSP prior to the start any construction activities. SSSP shall be in typically accepted industry format.
All proposals shall be in unlocked MS Word format and all cost proposals shall be detailed, presented in unlocked MS Excel format with formulas working, and include heat pump make, model number, warranty information, and unit specifications.
Material / Submittals:
The material for the entire work shall include but are not limited to those detailed above necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material, including shop drawings and specifications, used on this project shall be submitted to the EPM and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The
Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting
Officer.
Project Schedule:
The completion of this project shall not exceed 60 days from date of notice to proceed. A request for time extension must be submitted to the Contracting Officers Representative in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor work hours shall be Monday through Friday, eight (8) A.M. to five (5) P.M. with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Project Contacts
ADMINISTRATIVE OFFICER (AO)
Audra Bowman Tel. No.: (919) 334-8260 840 Method Road, Raleigh, NC 27695 Email: Audra.Bowman@usda.gov
ENGINEERING PROJECT MANAGER (EPM) Tel. No.: (662) 336-0712 Kevin Magee, PE USDA, ARS SEA Facilities Engineering 141 Experiment Station Road Stoneville, MS 38776 Kevin.Magee@usda.gov
LOCATION POINT OF CONTACT (LPOC)
Facilities Operations Specialist Kurt Geisler Tel. No.: (919) 917-6238 3127 Ligon Street Raleigh, NC 27607 Email: kurt.geisler@usda.gov mailto:Kevin.Magee@usda.gov mailto:kurt.geisler@usda.gov
Picture 1: Walk in cooler in need of new circuit. Soybean annex building can be seen to right of cooler. Picture taken looking Southeast.
Picture 2: View between south side of walk-in cooler and North wall of Soybean Annex. Elec. meter can be seen at far end of Soybean Annex North wall, 400a panel is on interior of this wall, opposite the meter. Note the grassy area below which new conduit/conductors are to be buried. Picture taken facing East.
Picture 3: Picture showing North wall of soybean annex, meter, and condensing unit atop the cooler Service entrance for the condenser is on the North side of the unit. Picture taken facing West. For reference, note the location of the plastic conduit penetrating the building just west of the meter.
Picture 4: Square D main service panel at Soybean Annex, interior of North wall, northeast corner of building
(opposite of the meter shown in previous pictures, note the conduit penetrating the building, this can be seen in previous picture.
Picture 5: Panel information.
Picture 6: View of breakers in 400A panel.
Picture 7: Square D tag inside panel.
Picture 8: Additional panel info.
Picture 9: Walk-in Cooler’s Make, Model, Serial, Elec. info
Picture 10: Showing inside condensing unit’s service entrance panel cover.
Picture 11: Showing terminals for new circuit at condensing unit service panel.
Picture 12: Schematic included with Walk-in cooler. Shows field wiring for new circuit.