Attachment 6 Personnel.doc

DOC document 33 KB Posted

Attached to
FS 223 BEAR RUN ROAD CULVERT REPLACEMENT PROJECT Federal contract opportunity
Solicitation number
12343420R0004
Issued by
Department of Agriculture Forest Service R9-Eastern Region

About this file

This document contains instructions and requirements for a federal contract solicitation. The solicitation is for replacement of a culvert on Bear Run Road and is being conducted by the Department of Agriculture Forest Service Eastern Region. Offerors must provide resumes for all key personnel demonstrating any relevant certifications, licenses, or experience. A list of equipment to be used on the project must also be included specifying details such as horsepower, size, model, and year for each item. The solicitation number is 12343420R0004 and responses are due as indicated on the Standard Form 33. The work required includes removing the existing culvert and installing a new structure at the specified location on Bear Run Road.

View the file

Other files for this federal contract opportunity

Other files attached to FS 223 BEAR RUN ROAD CULVERT REPLACEMENT PROJECT, newest first.
File Type Posted
Attachment 8.pdf PDF
12343420R0004_Amendment1.pdf PDF
Amendment 1.pdf PDF
Attendance Sheet.pdf PDF
REVISED Attachment 2.pdf PDF
Attachment 1_Supplemental Specs.pdf PDF
Attachment 4 Experience.doc DOC document
12343420R0004.pdf PDF
Attachment 3_Wage Determination.pdf PDF
Attachment 5 Methodology.doc DOC document
Attachment 7 Sustainable.doc DOC document
Attachment 2_Plans.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOL. NO.: 12343420R0004

Key Personnel and Equipment Instructions: Offerors shall furnish the following information as it pertains to this request for proposal. Attach an additional sheet if extra space is needed to answer any item below.

Contractors Name, Address, & Telephone No.

KEY PERSONNEL:

Provide brief resumes for all personnel (include any certifications and/or licenses they possess):

EQUIPMENT:

Provide a list of equipment to be used in the project (type of equipment, horsepower, size, model, year and accessories).

File details come from the government source that posted it. Updated .