Attachment_5_-_Subcontracting_Percentage_Worksheet.docx
DOCX document 95 KB Posted
- Attached to
- NAMA SEWAGE LIFT STATION CONTROL REPLACEMENT Federal contract opportunity
- Solicitation number
- 140P3023Q0037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Amendment_1_-_Attachment_10_-_Site_Visit_Sign_in_0001.pdf | ||
| B09_Amendment_1_-_Attachment_8_-_Questions_and_Answers_0001.docx | DOCX document | |
| Sol_140P3023Q0037_Amd_0001.pdf | ||
| B09_Amendment_1_-_Attachment_9_-_M-23-13-No-TikTok-on-Government-Devices-Implementation-Guidance_final_0001.pdf | ||
| Attachment_2_-_WD_DC20230001_effective_1-6-23.pdf | ||
| Attachment_6_-_Quote_Submission_Package.docx | DOCX document | |
| Attachment_3_-_CAAC_Letter_2020-04.pdf | ||
| Attachment_1_-_SOW_Hains_Point_Sewer_Ejector_1-18-23.docx | DOCX document | |
| Attachment_7_-_Pre-proposal_Site_Visit_Agenda.doc | DOC document | |
| Attachment_4_-_Construction_Contract_Administration.docx | DOCX document | |
| Sol_140P3023Q0037.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
INTERIOR REGION 1 - NATIONAL CAPITAL AREA
1100 Ohio Drive S.W.
Washington, D.C., 20242
NPS-National Capital Area Solicitation: 140P3023Q0037 – Sewer Ejector Control System Page 2 of 2
9 February 2023
SUBJECT: FAR 52.219-14 – LIMITATIONS ON SUBCONTRACTING (DEVIATION OCT 2022)
SOLICITATION 140P3023Q0037 – NAMA SEWER EJECTOR CONTROL SYSTEM
PRIME CONTRACTOR: _________________________ SOURCE: ________________________
SUBCONTRACTOR: ___________________________ SOURCE: ________________________
To calculate, either follow the below directions OR right click the above Excel ‘Object’ and select ‘Worksheet Object’ then ‘Edit’. You can then input Direct Labor/Fringe Benefits/G&A % and it will calculate for you (as illustrated).
a) To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).
b) Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).
c) Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).
d) Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.
e) Next, using the formula below, calculate the subcontracting labor percentage.
____(D)____
(C) + (D)
SUBCONTRACTING LABOR COST PERCENTAGE = %
*The firm must demonstrate that their labor overhead is allowable in accordance with FAR 3 l.205- 6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.
**G&A denotes General and Administrative Costs ***You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.
In accordance with FAR 52.219-14 – LIMITATIONS ON SUBCONTRACTING (DEVIATION OCT 2022) (e)(3) General construction. It will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor’s 85 percent subcontract amount that cannot be exceeded.
NPS-National Capital Area Page 1 of 1
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
Preserving unimpaired the natural and cultural resources and values of the national park system for the enjoyment, education, and inspiration of this and future generations.
FOR OFFICIAL USE ONLY
SOURCE SELECTION INFORMATION – SEE FAR 3.104
image1.emf
Microsoft_Excel_Worksheet.xlsx Sheet1
PRIME CONTRACTOR SUBCONTRACTOR
DIRECT LABOR $250.00 $50.00
FRINGE BENEFITS $300.00 $100.00
SUB TOTAL (A)$550 (B)$150
LABOR G&A** @ 10.00% $55.00 10.00% $15.00
TOTAL LABOR COST (C)$605 (D)$165
Subcontracting Labor Percentage 21.43% image2.jpeg image3.jpeg
File details come from the government source that posted it. Updated .