Attachment 4 - MAHG201091 AF66_B412 Reno_13 July 2020.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Renovate Building 412 for DCSA Federal contract opportunity
Solicitation number
FA301020R0038
Issued by
Department of the Air Force Air Education and Training Command

About this file

This submittal register and statement of work outline the requirements for renovating Building 412 at Keesler Air Force Base for the Defense Counterintelligence and Security Agency. The contractor will be required to submit shop drawings, samples, warranties and other documentation within 10 days of notice to proceed. Key work includes finish carpentry, interior woodwork, solid surface fabrication, insulation, sealants, doors, hardware, framing and board, flooring, paint, plumbing fixtures, ductwork, HVAC controls, air balancing, electrical and communications systems. The contractor must also provide refrigerant testing, duct cleaning reports, equipment specifications, an execution schedule and closeout documentation. The solicitation is set aside for Service Disable Veteran Owned Small Businesses, with pricing due by August 6, 2020 and work expected to be between $250,000 and $500,000.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 66 Sheet 1-16

SUBMITTAL REGISTER MAHG20-1091 RENOVATE 412 FOR DCSA

TO BE COMPLETED BY PROJECT MANAGERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
ITEM NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALNO. OF COPIES REQUIREDREQUIRED SUBMISSION DATEDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATEDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
CERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSDATADOCUMENT \ REPORT

APPROVED DIS-APPROVED

1HazMat Questionnaire335 Days Prior to Start Date
2HazMat MSDS35 Days Prior to Start DateMust be filled out if contractor answers YES to the Hazmat Questionnaire
3Hazmat Reporting Entry Form335 Days Prior to Start DateSubmit Final Quantities
4Hazmat Reporting Entry Form33End of Contract
5Recycling and Landfill Report33End of Contract
6Warranty (Manufacturer's)3End of Contract
71-Year Warranty (Contractor)3End of Contract
8Section 062000-Finish Carpentry (Cabinets/Hardware)1110 days following NTP
9Section 064020 - Interior Architectural Woodwork1111110 days following NTP
10Section 066500-Solid Surface Fabrication1111110 days following NTP
11Section 072000-Insulation (Sound attenuation insulation, sealant)11110 days following NTP
12Section 079200- Joint Sealants111110 days following NTP
13Section 081113-Steel Door and Frames1111110 days following NTP
14Section 082000-Wood Doors111110 days following NTP
15Section 087100-Door Hardware111110 days following NTP
16087200-Thresholds11110 days following NTP
16092216-Non-Structural Metal Framing11110 days following NTP
17Section 092550-Gypsum Board Assemblies11110 days following NTP
18Section 095110-Acoustical Panel Ceilings111110 days following NTP
19Section 096500-Luxury Vinyl Tile1111110 days following NTP
20Section 096513-Rubber Wall Base1111110 days following NTP
21Section 096813- Tile Carpeting1111110 days following NTP
22Section 099100-Paint111110 days following NTP
23Section 099323-Stains and Transparent Finishes111110 days following NTP
24Plumbing (See Specifications)1130 days following NTP
25Toilet Fixtures, Flush Valves
(See SOW, Mechanical Installation, pp10of24; See Plumbing & Piping Specifications, pp1-6)1311110 days following NTP
26Urinals, Flush Valves
(See SOW, Mechanical Installation, pp10of24; See Plumbing & Piping Specifications, pp1-6)1311110 days following NTP
27Sinks, Faucets, Temp Reg Valves
(See SOW, Mechanical Installation, pp10of24; See Plumbing & Piping Specifications, pp1-6)1311110 days following NTP
28Duct Construction (See SOW, Mechanical Installation, pp8of24; See Duct Construction & Accessories Specification, pp1-6)1131130 days following NTP
29Fire Dampers (See SOW, Mechanical Installation, pp8of24; See Duct Construction & Accessories Specification, Fire Dampers, pp3of6)1110 days following NTP
30Balancing Dampers (See SOW, Mechanical Installation, pp8of24; See Duct Construction & Accessories Specification, Manual Balancing Dampers, pp4of6)1110 days following NTP
31Supply Diffusers
(See SOW, Mechanical Installation, pp8of24; See Duct Construction & Accessories Specification, Supply Air Diffusers, pp3of6)1110 days following NTP
32Return, Exhaust Grilles
(See SOW, Mechanical Installation, pp8of24; See Duct Construction & Accessories Specification, Return Air Grilles, pp3of6)1110 days following NTP
33Air Filters (See SOW, Mechanical Installation, pp8of24; See Duct Construction & Accessories Specification, Disposable Air Filters, pp4of6)1110 days following NTP
34HVAC Controls OP Test (See SOW, Mechanical Installation, pp9of24)11110 days following NTP
35Natural Gas OP/Leak Test
(See Plumbing & Piping Specification, Natural Gas Testing, pp9of11)11110 days following Test
36HFW OP/Leak Test
(See Plumbing & Piping Specification, CFW & HFW Piping System Testing, pp9of11)11110 days following Test
37CFW OP/Leak Test
(See Plumbing & Piping Specification, Refrigerant Piping System Testing, pp9of11)11110 days following Test
38Drain OP/Leak Test
(See Plumbing & Piping Specification, Waste Drain and Condensate Drain Testing, pp9of11)11110 days following Test
39Refrigerant Pneumatic Test

AHU 1 DX piping

(See Plumbing & Piping Specification, Refrigerant Piping System Testing, pp7of11)10 days following Test
40Refrigerant Evacuation Test

AHU 1 DX piping

(See Plumbing & Piping Specification, Refrigerant Piping System Testing, pp7of11)10 days following Test
41Refrigerant Pneumatic Test

LAN RM cooler DX piping

(See Plumbing & Piping Specification, Refrigerant Piping System Testing, pp7of11)10 days following Test
42Refrigerant Evacuation Test

LAN RM cooler DX piping

(See Plumbing & Piping Specification, Refrigerant Piping System Testing, pp7of11)10 days following Test
43Duct Cleaning Report AHU1
(See SOW, Mechanical Demolition pp4of24; and Duct Cleaning Specification pp12of24)11310 days following Test
44Duct Cleaning Report AHU2
(See SOW, Mechanical Demolition pp4of24; and Duct Cleaning Specification pp12of24)11310 days following Test
45Duct Leak Test AHU1
(See SOW, Mechanical Installation pp10of24)11310 days following Test
46Duct Leak Test AHU2
(See SOW, Mechanical Installation pp10of24)11310 days following Test
47AHU1 Air Balance Test
(See SOW, Mechanical Installation pp10of24)11310 days following Test
48AHU2 Air Balance Test
(See SOW, Mechanical Installation pp10of24)11310 days following Test
49Electrical/Communications (See Electrical Drawings)1111110 days following NTP
50LED Fixtures (See Electrical Drawings and SOW 'Electrical Provide new')1111110 days following NTP
49Fire Alarm (See Electrical Drawings and SOW 'Electrical Provide new')1111110 days following NTP
50Access Control (See Electrical Drawings and SOW 'Electrical Provide new')11111110 days following NTP
51AHU 1, Evaporator Unit
(See SOW, Mechanical Installation pp10of24)1113113314 days following NTP
52AHU 1, Condensing Unit
(See SOW, Mechanical Installation pp10of24)1113113314 days following NTP
53AHU 1, Gas Duct Furnace
(See SOW, Mechanical Installation pp10of24)1113113314 days following NTP
54LAN/COMM RM Cooler

Mini-Split Cooling Unit

(See SOW, Mechanical Installation pp10of24)1113113314 days following NTP
55Work Execution Schedule (See Section 23 01 30, Page 2)110 days following NTP
56Operations and Maintenance Manuals11131133Project Close Out(2 hard copy, in binder, and 1 digital copy of each)
57CABLE TEST REPORT3Project Close Out2 hard copies/1 Electronic