Attachment 3 - SOW.docx
DOCX document 571 KB Posted
- Attached to
- Negative Pressure Conex-L (NPC-L) Transition Ramps Federal contract opportunity
- Solicitation number
- FA4452-21-R-0012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 AMENDED Information Sheet.pdf | ||
| Attachment 1 - Information Sheet.pdf | ||
| SACR NPC-L Transition Ramps.pdf | ||
| Attachment 2 - Provisions and Clauses.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NPC-L Transition Ramp Statement of Work Construct 35 aluminum transition ramps to support the NPC-L during aircraft operations. Transition ramps will be built per the drawing/pictures below. All dimensions on drawing are metric.
| 1. | 2. |
| 3. | 4. |
1. Do not use wood as shown in picture 1 and 2 to avoid “metal to metal” contact. Use Delrin 500CPE or similar product to eliminate any “metal to metal” contact.
2. Ramp must be capable of bolting to 463L aircraft pallet cargo rings per pictures (4) using a 5/8” bolt with 15/16” Hex head. Bolts are to be supplied with transition ramp (5 each 5/8-11x1-1/2” Gr.5 chromate plated Hex Head Cap Screws per Ramp)
3. Initial product must be fit tested to insure all dimensions in design are compatible with 463L air craft pallet. Product will be sent to Dover AFB for initial fit testing. Once dimensions and fit is accepted full production of the remaining 34 ramps can proceed.
4. Material to be used for construction - Aluminum Diamond Plate, 6061/T6, 0.250” Mill Finish.
image3.jpeg image4.jpeg image5.jpeg image1.emf image2.jpeg
File details come from the government source that posted it. Updated .