This document contains a material submittal schedule and related federal contract opportunity solicitation. The material submittal schedule outlines 25 line items of required submittals for an upgrade to the Monaco System at various facilities on Keesler Air Force Base in Mississippi, including hazard communication documents, shop drawings, warranty documents, and a recycling/landfill report. Submittal due dates to the contractor and between the contractor and civil engineering are specified.
The related federal contract opportunity solicitation is seeking proposals from service-disabled veteran-owned small businesses to upgrade the Monaco System base-wide at Keesler AFB as specified in the statement of work and specifications. The North American Industry Classification System code is 238210 and the size standard is $16.5 million. The estimated value is between $1-5 million. The solicitation and specifications will be posted on SAM.gov. The contract performance period will be 365 days. Interested parties must register in SAM to be eligible for award. The closing date for proposals and additional details can be found on SAM.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 10 - Prebid Questions and Answers.pdf | ||
| Solicitation Amendment FA301022R00120002 SF 30.pdf | ||
| Prebid Questions and Answers- Upgrade Monaco System.pdf | ||
| Solicitation Amendment FA301022R00120001 SF 30.pdf | ||
| Site-Visit Sign In - 22 Jun 22.pdf | ||
| Solicitation - FA301022R0012.pdf | ||
| Attachment 1 - Upgrade Monaco System Base Wide SOW.pdf | ||
| Attachment 3 - JA Fire Alarm Panels 29Nov 21 REDACTED.pdf | ||
| Attachment 4 - Wage Det MS20220050.pdf | ||
| Attachment 6 - Past Performance Reference List.pdf | ||
| Attachment 9 - Submittal Procedures.pdf | ||
| Attachment 8 - Notice of Compliance.pdf | ||
| Attachment 5 - Past Performance Questionnaire.pdf | ||
| Attachment 7 - SF 1444.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | ||||||||||||||||||||||
| MAHG21-1137 | Upgrade Monaco System Base Wide | Solicitation / Contract Number: | ||||||||||||||||||||
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 2 | HazMat MSDS | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 3 | Hazmat Reporting Entry Form | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 4 | Hazmat Reporting Entry Form | 1 | End of Contract | |||||||||||||||||||
| 5 | Recycling and Landfill Report | 1 | End of Contract | |||||||||||||||||||
| 6 | Warranty (Manufacturer's) | 1 | End of Contract | |||||||||||||||||||
| 7 | 1-Year Warranty (Contractor) | 1 | End of Contract | |||||||||||||||||||
| 8 | Miscellanous Material conduit/wire | 1 | 10 Days after NTP | |||||||||||||||||||
| 9 | Shop Drawings | 1 | 1 | |||||||||||||||||||
| 10 | Monaco Panels including antenna and cards | 1 | 10 days after NTP | |||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)