About this file

This document contains a material submittal schedule and related federal contract opportunity solicitation. The material submittal schedule outlines 25 line items of required submittals for an upgrade to the Monaco System at various facilities on Keesler Air Force Base in Mississippi, including hazard communication documents, shop drawings, warranty documents, and a recycling/landfill report. Submittal due dates to the contractor and between the contractor and civil engineering are specified.

The related federal contract opportunity solicitation is seeking proposals from service-disabled veteran-owned small businesses to upgrade the Monaco System base-wide at Keesler AFB as specified in the statement of work and specifications. The North American Industry Classification System code is 238210 and the size standard is $16.5 million. The estimated value is between $1-5 million. The solicitation and specifications will be posted on SAM.gov. The contract performance period will be 365 days. Interested parties must register in SAM to be eligible for award. The closing date for proposals and additional details can be found on SAM.gov.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
MAHG21-1137Upgrade Monaco System Base WideSolicitation / Contract Number:
Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1HazMat Questionnaire15 Days Prior to Start Date
2HazMat MSDS15 Days Prior to Start Date
3Hazmat Reporting Entry Form15 Days Prior to Start Date
4Hazmat Reporting Entry Form1End of Contract
5Recycling and Landfill Report1End of Contract
6Warranty (Manufacturer's)1End of Contract
71-Year Warranty (Contractor)1End of Contract
8Miscellanous Material conduit/wire110 Days after NTP
9Shop Drawings11
10Monaco Panels including antenna and cards110 days after NTP
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

File details come from the government source that posted it. Updated .