This document is a Statement of Work (SOW) and a related Federal Contract Opportunity for a non-personal service contract to provide and install a new 3-ton mini-split heat pump system with two indoor units and condensate pumps at the Western Oregon Service Unit (WOSU), also known as the Chemawa Indian Health Center, in Salem, Oregon.

The SOW details the scope of work, including removing the existing 1.5-ton mini-split unit, installing the new 3-ton system with two indoor units, and all associated electrical, refrigeration, and roofing work. Specific equipment requirements are provided, along with quality assurance standards, installation timelines, and contractor responsibilities around maintaining a clean work environment and server room operations. The related Federal Contract Opportunity, Solicitation Number 75H71324Q00076, is a firm fixed-price commercial services and supply contract with a projected performance date of August 21, 2024. It is a small business set-aside under NAICS code 333415, with evaluation factors of price and past performance. Quotes are due by July 30, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to MINI-SPLIT REPLACEMENT, newest first.
File Type Posted
ATTACHMENT 3 - WAGE DETERMINATION.pdf PDF
ATTACHMENT 1 - IEE REPRESENTATION FORM.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MINI-SPLIT REPLACEMENT

PORTLAND AREA INDIAN HEALTH SERVICE

I. BACKGROUND

Western Oregon Service Unit (WOSU), also known as Chemawa Indian Health Center, is an Indian Health Service (IHS) inpatient health center with more than 5000 active patients. Heating ventilation and cooling in the WOSU server room is provided by a 1.5-ton Daikin mini-split unit with one indoor unit. Due to the addition of new servers there is a significant increase in heat output and cooling requirements. The 1.5-ton unit does not provide adequate cooling. Due to the odd shape of the room (shaped like the letter “L”), there is limited airflow from the indoor unit to the opposite side of the room.

II. PURPOSE

This is the Statement of Work (SOW) for a non-personal service contract to provide and install a new mini-split heat pump and two indoor units with condensate pumps.

III. LOCATION

WOSU is located in Salem Oregon, approximately 43 miles south of Portland, Oregon.

All services are to be provided on location. The physical address is below.

Western Oregon Service Unit

Chemawa Health Center 3750 Chemawa Rd. NE Salem, Oregon 97305

IV. PERIOD OF PERFORMANCE

WOSU will need to power down servers in the server room during installation. Installation must be performed over a single working day between the hours of 7:00am and 5:00pm, and scheduled in advance with the Contracting Officer’s Representative to minimize disruption of services at Western Oregon Service Unit.

V. SCOPE OF WORK

1. Work Summary

a. Disconnect, remove and dispose any of the currently installed 1.5-ton unit and interior head that should not be used in the new up-sized 3-ton unit.

b. Install two (2) interior heads on opposite side on the “L” shaped server room with cable runs to the roof top 3-ton unit. Both Air handler heads will be wall mounted.

c. Both heads will need to have condensate pumps in order to remove the air handler water.

2. Codes, References, and Standards

Work under this contract shall be performed in compliance with the codes, references, and standards listed below.

a. EPA Section 608

b. NFPA 70 – National Electric Code (NEC)

c. Uniform Mechanical Code (UMC)

d. Manufacture’s installation specifications

e. International Building Code (IBC)

3. Submittals

The Contractor shall provide submittals on the items listed below. COR approval is required before proceeding with the portion of work the submittal applies to.

i. Pre-Work

a. Project schedule, including timing of any power interruptions.

b. Contractor’s Safety and Accident Prevention Plan, Hazardous Waste

Management and Disposal

c. Continued function of server room during work.

ii. Material

a. Rooftop Units

b. Interior units

c. Thermostats

d. Roofing sealant and materials (if needed)

e. Any Drywall repair supplies needed

iii. Pre-work and planning

a. How to maintain a clean work environment so the server room stays clean, running and undamaged during installation.

b. How to run cables and hoses to roof unit to head while staying clear of all servers and server cables/power.

c. Work will need to be scheduled out in advance in order to maintain patent care with limited interruptions to the server room. Server room currently has auxiliary A/C units to maintain temp in room. Auxiliary units will need to stay running while work is being performed in order for server room to keep temp.

iv. Post-work

1. Start-Up Report

2. Warranties

3. Operation and maintenance (O&M) manuals

4. O&M training

4. Equipment Specifications

i. Rooftop Units

36,000 BTU (3-Ton) 17 SEER Dual Zone Wall Mounted Daikin Mini-Split Heat Pump System or equivalent product. As equal products will be evaluated based on the following salient characteristics.

a. Tonnage: 3-Ton

b. Cooling BTU: 36,000

c. Heating BUT: 36,000

d. SEER (Efficiency Rating) minimum: 17

e. Anti-Corrosion Coated Heat Exchanger

f. 12-year warranty

ii. Air Handlers

Two (2) 18,000 BTU Wall Mounted Daikin Mini-Split Multi Zone FTXS Air Handlers. As equal products will be evaluated based on the following salient characteristics.

a. Tonnage: 1.5-ton (each)

b. Cooling BTU: 18,000 (each)

c. Heating BTU: 18,000 (each)

d. Auto-Restart

e. 3D Airflow

f. Multi Zone

g. Wall Mounted

h. Titanium Apatite Photocatalytic Air-Purifying Filter

i. 12-year warranty

iii. Thermostat must include a digital display and temperature controls or remote to maintain a consistent temp in the server room.

5. Quality Assurance

a. All work involving refrigerant must be completed by a technician maintaining a valid EPA 608 Certification

b. All HVAC equipment shall be listed by the Underwriters Laboratory (UL).

c. Only standard or premium labeled equipment will be considered for installation. Low-grade or budget equipment will be rejected.

d. All Mini-Split’s must work as intended per the manufacturer’s recommendations.

e. COR must be shown functionality of complete mini-split heat pump system.

f. The final inspection of the work shall be a joint effort between the Contractor and the

COR. Any deficiencies found during the inspection shall be corrected within ten (10) days of finding.

g. While work is being done there must be a plan in place approved by the COR that allows for the servers to stay clean and safe. Servers will have to be turned off while work is being done to prevent dust intake and overheating of the server room.

6. Work Execution Requirements

a. Infection Control

i. Activities that result in excessive dust accumulation, such as cutting and demolition, will require the Contractor to use appropriate methods to contain and minimize dust dispersion.

ii. Contractor methods to contain and minimize dust dispersion will be subject to approval by the Infection Control Officer.

b. Interim Life Safety Measures

i. The Contractor is responsible for notifying and gaining advance approval from the IHS Safety Officer for any modifications or disabling of life safety systems as necessary to complete this work.

ii. Examples include temporary modification of exit paths or temporarily disabling an alarm system.

iii. In such instances, the Contractor shall implement interim measures that are preapproved by the IHS Safety Officer.

c. Hazard Inspection

i. Work will take place in and around a facility constructed in 1976 with a major remodel in 2017. A comprehensive inspection for the presence of hazardous materials has not been conducted.

ii. As part of preparing the Safety and Accident Prevention Plan, the contractor shall inspect work areas for potential safety hazards and hazardous materials consistent with the health and safety regulations applicable to this work. This includes inspecting for Asbestos Containing Materials (ACMs) in areas where work is performed. The asbestos inspection shall be completed by a State Licensed Asbestos Inspector consistent with 40 CFR Part 61, Subpart M (Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP).

iii. The outcome of the Contractor’s inspection of the work area shall be included with the Safety and Accident Prevention Plan submittal. In the event that new suspected or confirmed hazardous materials are found during the Contractor’s inspection, a Contract Modification shall be negotiated to assure the requirements of applicable health and safety regulations are met.

d. Roof Top Unit

i. Evaluate existing curbs and min-split location to confirm compatibility with new equipment. Notify COR immediately if any discrepancies are found that will impede installation.

ii. Following EPA-608 regulations, capture and dispose of or recycle refrigerant and oil.

iii. Remove old mini-split and head and dispose of them in an EPA-approved landfill or recycling facility.

iv. Install new mini-split system according to manufacturer specifications.

v. Seal and repair roofing connections.

e. Thermostats

i. Remove and dispose of existing thermostats

ii. Provide new thermostats and connect to new Mini-split system.

iii. There is a security thermostat in the server that will not be touched and is not part of this job.

f. Insurance

i. The Contractor, at the Contractor’s expense, shall maintain adequate public liability and property damage insurance during the continuance of this contract, insuring the Contractor against all claims for injury or damage.

ii. The Contractor shall maintain Workers’ Compensation and other legally required insurance with respect to the Contractor’s own employees and agents.

g. Operations and Storage Areas

The Contractor shall coordinate its operations and storage areas with the COR and Facility Manager. There is a large storage area on site behind the maintenance shop if needed. Located at the North end of parking lot. Area is uncovered on gravel.

h. Licensure

The contractor must maintain a current Oregon CCB License in good standing during the period of performance.

VI. ATTACHMENTS

A. Current HVAC layout of server room and surrounding area B. Location of current roof top unit C. Pictures of outside unit D. Picture of inside unit E. Location Map F. Area of work

Attachment A:

(Green highlight will be mounting location for the interior heads.)