Attachment 2 - SPI Container Sketch.pdf

PDF 665 KB Posted

Attached to
Special Packaging Instruction Container Federal contract opportunity
Solicitation number
SP3300-24-Q-0172
Issued by
Defense Logistics Agency Distribution

About this file

This document appears to be Attachment 2 - SPI Container Sketch, which provides detailed technical specifications for a wood cleated panelboard shipping box required under federal contract opportunity SP3300-24-Q-0172 issued by the Defense Logistics Agency Distribution.

The attachment outlines the dimensional requirements, skid detail options, and construction details for the shipping box, which must conform to ASTM D6251/D6251M-11 standards. Key specifications include an overall box size of 42.5" x 96" x 36", with 2.5" x 20.25" x 20.25" skids inset 3" from each end and a skid height of 6.5". The box is to be constructed using 3/8" plywood and 1" x 3" nominal cleats, with filler cleats of either built-up 1" x 4" over 2" x 4" or a single cut 3" x 4" piece. The attachment provides detailed drawings and dimensions to illustrate the requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Special Packaging Instruction Container, newest first.
File Type Posted
Attachment 1 - Container Requirements.docx DOCX document
SP3300-24-Q-0172.docx DOCX document
Attachment 3 - SPI Number 01-113-8188.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASTM D6251D6251M-11

Wood Cleated Panelboard Shipping Boxes //Type III – Plywood / Class 2 – Overseas / Style A – Standard box corner///With Skids

2.5”

20.25”

20.25” 6.5” 6.5”

Skid Detail Options

1) Assemble IAW outer dimensions on the

SPI #01-113-8188.

2) Bottom of container IAW SPI

a. 3/8” plywood

b. Attached cleats 1 x 3 nom. cut to length.

3) Lengths above are nominal + or - 1/4”

a. Skids measure shown on center

b. Inset 3 ¾” from each end

4) Skid height requires nominal - 2 ½“

a. Built by Option A or B

b. 45 deg. angle cut front/back

5) 4ea Filler cleats = skid width (4”nom.)

Option A

Built-up 1 x 4 over 2 x 4

Option B

Single cut stock 3 x 4

42.5” 96”

36” 53.5” 36”

138 1/2”

SP3300-24-Q-0172

Attachment 2 - SPI Sketch

File details come from the government source that posted it. Updated .