This solicitation is for a small business set-aside construction contract to provide commissioning, testing, and operational adiabatic humidification systems for five existing air handlers at the Rosebud Comprehensive Health Care Center in South Dakota. The contractor must include factory startup and commissioning of the reverse osmosis and humidification systems by a factory representative. The project includes relocating humidifiers, installing piping and controls, adding sensors and integrating the systems with the building automation system. The contract type is firm-fixed-price and quotes are due by July 7, 2022. The period of performance is 180 days from notice to proceed. The estimated value is between $100,000 and $250,000. The soliciting agency is the Indian Health Service and the NAICS code is 238220.

View the file

Other files for this federal contract opportunity

Other files attached to Rosebud Commission Adiabatic Humidification Systems, newest first.
File Type Posted
Attachment 3 IHS IEE Representation Form.pdf PDF
Attachment 7 WH347 PAYROLL.pdf PDF
Attachment 4 Self Performed Calculation Sheet.docx DOCX document
Attachment 6 Past Performance Questionnaire.docx DOCX document
Attachment 5 Technical Experience Offeror Worksheet.docx DOCX document
Attachment 1 SD20220018.pdf PDF
Attachment 8 Release of Claims.pdf PDF
B01 75H70122Q00024.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Commission Adiabatic Humidifier 5/18/2022 Statement of Work Page 1 of 12

STATEMENT OF WORK

COMMISSION ADIABATIC

HUMIDIFICATION SYSTEMS

INDIAN HEALTH SERVICE

PROJECT # 131242

ROSEBUD COMPREHENSIVE HEALTH CARE CENTER ROSEBUD, SD

DEPARTMENT OF ENGINEERING SERVICES

MAY 2022

5/18/2022 Statement of Work Page 2 of 12

TABLE OF CONTENTS

SECTION PAGE

1.1 COORDINATION AND SCHEDULE 3

1.2 RELATED DOCUMENTS 3

1.3 BACKGROUND INFORMATION 3

1.4 SCOPE OF WORK 4

1.5 SUBMITTALS 10

1.6 TRIBAL REQUIREMENTS 11

1.7 CONTRACTOR LIABILITY 11

1.8 SAFETY AND SECURITY 12

1.9 RESTORATION 12

1.10 WARRANTY 12

1.11 CLOSEOUT DOCUMENTS 12

APPENDIX A – PROPOSED CONDENSATE DRAIN DESIGN AND INSTALLATION

APPENDIX B – PROPOSED AHU DOOR VIEWPORT PRODUCT

APPENDIX C – CONDAIR CONTROL UNIT AND CENTRAL UNIT PICTURES

APPENDIX D – CONTRACT DRAWINGS – MECHANICAL AND ELECTRICAL

APPENDIX E – ASHRAE 170 HUMIDIFICATION REQUIREMENTS

5/18/2022 Statement of Work Page 3 of 12

1.1. COORDINATION, SCHEDULE, AND TIMELINE

A. All project execution, construction administration, and scheduling shall be coordinated with the Contracting Officer Representative:

Contracting Officer Representative (COR) Corey Sawatzky, PE Acting Deputy Director Department of Facilities Management (DFM) corey.sawatzky@ihs.gov Office: 605-719-4075

Project Manager (PM) Matt Pfister, PE Facilities Engineer matthew.pfister@ihs.gov Cell: 605-519-0495

B. The period of this contract will be 180 calendar days from the Contract NTP.

Notification to the Contractor to begin construction will be by letter. This project will utilize the Department of Engineering Services within the Indian Health Service to complete improvements at the health center in Rosebud, SD.

1.2. RELATED DOCUMENTS

A. This SOW, construction drawings, and any other standard government or IHS documents are included and considered a part of this contract.

1.3. BACKGROUND INFORMATION:

A. Location:

1. All work will be conducted in the main hospital facility in Rosebud, SD. The address is:

Rosebud Comprehensive Health Care Facility 400 Soldier Creek Dr.

Rosebud, SD 57570

2. Common acronyms or definitions:

(i) BAS – Building Automation System

(ii) IHS – Indian Health Service

(iii) PR – Pine Ridge

(iv) CO – Contracting Officer

(v) COR – Contracting Officer’s Representative

(vi) PM – Project Manager

5/18/2022 Statement of Work Page 4 of 12

(vii) PVC – Polyvinyl Chloride

(viii) AFF – Above Finished Floor

(ix) ELEV – Elevation

(x) FT – Foot/Feet

(xi) IN – Inch

(xii) J-BOX – Junction Box (electrical)

(xiii) NEC – National Electric Code

(xiv) PCRA – Pre Construction Risk Assessment

(xv) ICRA – Infection Control Risk Assessment

(xvi) SOW – Statement of Work

(xvii) IMC – International Mechanical Code

1.4. SCOPE OF WORK

A. SUMMARY

1. The general scope of work for this project is to commission, test, and provide for a 100% operational adiabatic humidification system for each of 5 existing air handlers. All work will take place near the roof in the mechanical penthouse. A previous contractor installed each of the 5 Condair humidifiers, soft water system, and RO system. However, it has never been fully commissioned or operational to date. The successful contractor shall provide everything in this SOW and any other accessories or required components to ensure a humidification system that is 100% operational. The contractor will be required to include a Condair factory startup and commissioning of the RO System and all humidifiers as a part of the contract. This would include but not be limited to a factory representative to appear on site and conduct a full commissioning and startup of the entire system and for each humidifier.

2. Contractor is strongly encouraged to conduct a pre-bid walk through before providing final bid. Any anticipated work that would require shut down of any air handling system shall be conducted outside normal business hours either at night or on weekends. Contractor shall make provisions and plan to work on premium time if any air handler must be shut down. The hospital will not allow any shut down of any air handling system during normal business hours 8 AM thru 5 PM.

3. Contractor will be required to attend and work with IHS staff to conduct a Pre-Construction Risk Assessment (PCRA) and an Infection Control Risk Assessment (ICRA) before starting any work on the project. The contractor will be required to follow any facility protocols as a result of these assessments including but not limited to fire watches, posted work permits, interim life safety measure (ILSM), etc.

5/18/2022 Statement of Work Page 5 of 12

4. Any contractor traveling through or working inside the hospital will be required to pass a Covid check point and will be required to wear a mask at all times.

B. PLUMBING WORK

1. DOMESTIC WATER PIPING TIE IN

(i) A new Kinetico soft water system has been installed and tied into a new CondAir ML reverse osmosis system on a previous contract.

Successful contractor shall provide, install, and connect approximately 5 feet of 1-1/4” domestic cold water Type L or K copper pipe from the existing domestic cold water main to the new Kinetico/CondAir system.

All work shall be according to Appendix D and the manufacture written instructions.

2. AHU-1 THRU AHU-5 ADIABATIC HUMIDIFICATION SYSTEM

(i) The contractor shall carefully disconnect the PVC piping of each humidifier and install it closer to each air handling unit. Currently the humidifiers are too far away from the point of dispersion according to the manufacture written instructions. Each humidifier shall be properly re-installed per the Appendix D mechanical drawings and according to the manufacture written instructions. Note that each humidifier is of different size and shall be installed according to plan. Any humidifier that is installed in the wrong location shall be removed and reinstalled by the contractor at no increased cost to the government.

(ii) The existing ¾” PVC piping and accessories from the RO system to each humidifier shall be completely demolished and removed from the site at the contractor’s expense. The contractor shall re-pipe a ¾” supply and a ½” return Schedule 40 PVC from the RO unit to each newly located humidifier according to the plan of Appendix D. All accessories shall be installed according to Appendix D drawings, Appendix E ASHRAE 170 requirements, and the manufacture written instructions. A new UV-C system will not be required and is not a part of this contract.

(iii) A new drain line shall be piped from each humidifier according to the manufacture written instructions. The drain line shall terminate at each corresponding floor drain per the IMC, with a proper air gap, according to the manufacture written instructions, and according to Appendix D.

(iv) Contractor shall demolish 2 runs of existing humidifier condensate drains which are each approximately 25 feet length of 1-1/4” Schedule 40 PVC. Contractor shall re-plumb each of the 2 condensate drains for each of 5 air handlers. There have been problems with the cooling coil condensate drains on the suction side of the fans and as a precaution each humidifier drain will be re-piped as a part of this project on the discharge side of the fan. Contractor shall install 2 new 1-1/2” Schedule 40 PVC condensate drain systems approximately 25 feet in length and according to Appendix B of this document. No reduced fittings or piping smaller than

5/18/2022 Statement of Work Page 6 of 12

1-1/2” shall be installed and the deepest trap possible shall be installed with the goal being close to 12 inches deep without drilling into the existing concrete floor and according to Appendix A.

(v) The Condair nozzle system and the post evaporation unit providing adiabatic humidification inside each air handler is currently installed.

Contractor shall verify and inspect the installation according to the manufacture written instructions for all 5 existing air handler humidification systems. Contractor shall notify the COR immediately if any component is not installed correctly.

(vi) Contractor shall plan to execute all plumbing work inside each air handler outside normal business hours (8AM-5PM) or on weekends unless the work can be done in a 1 hour shutdown or less. Contractor shall provide, install, and connect the spray circuits from the nozzle grids to the housing feed throughs within the air handler wall and according to the manufacture written instructions. Refer to Figure 33 on this page for reference. Notice that only 3 circuits are needed for all 5 humidifiers and refer to item (ix) for more information on circuiting requirements.

5/18/2022 Statement of Work Page 7 of 12

(vii) The housing feed throughs of Air Handler #3 are located upstream of the filter bank. It is anticipated that there is no way to connect the spray circuits to the housing feed throughs without compromising the installation of the filter bank. Contractor shall relocate the housing feed throughs for Air Handler #3 next to the humidification access door and in a vertical fashion (if required) in order to fit the housing feed throughs and all spray circuits such that the door can still be opened without interruption.

(viii) The reinstallation of the Air Handler #3 spray circuits shall be installed in a fashion that allows them to drain and according to Appendix D to possibly run

5/18/2022 Statement of Work Page 8 of 12 underneath the door with a stainless steel cover unless an alternative solution can be determined by the contractor. Any alternative solution shall be reviewed and approved by all IHS staff stakeholders. The feed through penetrations upstream of the filter bank shall be patched to match the existing AHU wall and then sealed air and water tight.

(ix) Housing feed through connectors are not installed on Air Handlers 1 and 2.

Contractor shall provide and install new housing feed through connectors on both of these air handlers according to the manufacture written instructions.

(x) All 5 air handler humidifiers are 7 stage units requiring only 3 housing feed throughs at each air handler. Currently there appears to be more than 3 feed throughs installed at each of the air handlers. Contractor shall carefully remove and seal each feed through that is not needed or not required per the manufacture written instructions. All penetrations not used shall be insulated and sealed air and water tight within each air handler wall.

(xi) Contractor shall provide, install, and connect each of the 3 spray circuits at the air handling unit wall of all 5 air handlers to the spray circuit connections at each of the 5 Condair central humidification units according to the manufacture written instructions and with the proper slope. Refer to Figure 38 for reference and Appendix D.

5/18/2022 Statement of Work Page 9 of 12

C. HVAC WORK

1. Contractor shall plan for all HVAC work to be conducted outside normal business hours (8AM-5PM local time) or on weekends unless this work can be conducted within 1 hour or less. Contractor shall provide and install a SterilAire 6”X6”X2” thick viewport (or approved equal) in each air handler door closest to the nozzle dispersion grid for viewing of the humidifier during operation without having to open the air handler door. Contractor shall insulate and seal system air and water tight according to the manufacture written instructions. Appendix B shows an example of what shall be provided. Other manufactures will be allowed that meet similar form, fit, function, and design intent.

D. ELECTRICAL / TEMPERATURE CONTROLS WORK

1. Contractor shall provide 120V, single phase power to each new humidifier from existing panel PLE2 per Appendix D. Contractor shall install wire, conduit, and all accessories for a complete and operable power circuit and system for each of the 5 existing humidifier units. All work shall be in accordance with the latest NEC.

2. Contractor shall provide 460V, 3 phase power service from existing panel DHPE to the existing RO system according to Appendix D and the manufacture written instructions. The original design drawings show power from circuit 23. However, it appears this circuit is currently in use.

Contractor may need to provide power from the open breaker circuit #26 as it appears this one is not in use and rated for 15 amps / 3 phase. All work shall be in accordance with the latest NEC.

3. Connect control and power wiring for each of the 5 humidifiers connecting the control unit to the main unit per the manufacture written instructions.

Appendix C shows a picture of typical unit connectors and wiring harness for each humidifier unit.

4. Contractor shall provide and install a new return air temperature and humidity sensor in the existing return duct for each of the 5 air handlers. The sequence for each humidifier unit shall measure the return air humidity and control to a return air humidity setpoint. The return air temperature, humidity, and the return air humidity setpoint should all be viewable points on the Metasys graphic for each air handler and humidifier as a part of the final completion for this project.

5. Contractor shall provide and install a new supply air temperature and humidity sensor in the existing supply duct for each of the 5 air handlers. The supply air temperature and humidity should be viewable points on the Metasys graphic for each air handler and humidifier graphic as a part of the final completion for this project.

6. Contractor shall provide and install a Bacnet MSTP serial communication connection to each of the 5 Condair humidifiers and pull in the points to Metasys listed below. All points shall be set up on a separate humidifier

5/18/2022 Statement of Work Page 10 of 12 graphic and accessible from each of the corresponding air handler graphics via a clickable button.

(i) HUMIDIFIER STATUS – OBJECT ID 500

(ii) SERVICE STATUS – ID 549

(iii) FAULT CODE – ID 10759

(iv) ACTUAL HUMIDITY DEMAND – ID 10729

(v) ACTUAL HUMIDITY CAPACITY – ID 10702

(vi) INLET PRESSURE – ID 10732

(vii) NOZZLE PRESSURE – ID 10733

(viii) WATER TEMPERATURE – ID 10734

(ix) WATER CONDUCTIVITY – ID 10735

(x) HUMIDITY SETPOINT – ID 10602

(xi) HUMIDITY COMMAND – ID 10611

7. The following Metasys points shall be viewable both on each air handler graphic and the humidifier graphic.

(i) RETURN AIR TEMPERATURE

(ii) RETURN AIR HUMIDITY

(iii) HUMIDITY SETPOINT

(iv) HUMIDITY COMMAND

(v) ACTUAL HUMIDITY CAPACITY

(vi) SUPPLY AIR HUMIDITY

8. Each air handler graphic shall be altered or changed to reflect the new humidification system location and show it in the correct location on the graphic. The points shown in item 7 above shall be implemented on the main air handler graphic and then a link shall take user to corresponding humidifier screen that shows all of the other points listed in item 6 above.

1.5. SUBMITTALS

A. Submittals or shop drawings shall be submitted for the following items and shall be delivered electronically to the COR or designated PM for final approval before ordering any new material or equipment.

1. New domestic cold water piping material, size, thickness, specifications, standards, and any other pertinent information connecting the existing system to the new ML RO system.

2. New domestic cold water piping insulation material, thickness, specifications, standards, and any other pertinent information.

5/18/2022 Statement of Work Page 11 of 12

3. New Schedule 40 PVC supply and return piping connecting the ML RO system to each of the 5 humidifiers. This would include material, size, thickness, specifications, standards, and any other pertinent information.

4. New Schedule 40 PVC condensate drain piping material, size, thickness, specifications, standards, and any other pertinent information.

5. New piping accessories including but not limited to isolation valves, balancing valves, check valves, sub-micron filter, dielectric fittings, unions, and any other pertinent information.

6. New temperature control diagrams and humidity sensor specifications, installation requirements, wiring requirements, brand, size, accuracy, and any other pertinent information.

7. Electrical wiring, conduit, circuit breakers, disconnects, and any other required electrical accessories per the NEC or the manufacture written instructions.

8. Any other pertinent information.

1.6. TRIBAL REQUIREMENTS

A. The Contractor and all subcontractors engaging in work on the Rosebud Indian Reservation will be required to comply with the Indian preference and Indian preference program requirements administered by the Rosebud Sioux Tribe Tribal Employment and Contracting Rights Office (TECRO).

B. Contractors are strongly encouraged to contact the TECRO office at (605) 747-2322 for an explanation of tribal requirements. Taxes, employment fees, and other fees may apply for any work conducted on the Rosebud Indian Reservation.

1.7. CONTRACTOR LIABILITY FOR PERSONAL INJURY AND/OR

PROPERTY DAMAGE

A. The Contractor assumes responsibility for all damage or injury to persons or property occasioned through the use, maintenance, and operation of the Contractor’s vehicles or other equipment by, or the action of, the Contractor or the Contractor’s employees and agents. The Contractor assumes responsibility for any and all damage and/or injury to persons or property resulting from any action of prime contractor and subcontractor employees (at any tier).

B. The Contractor, at the Contractor’s expense, shall maintain adequate public liability and property damage insurance during the continuance of this contract, insuring the Contractor against all claims for injury or damage.

C. The Contractor shall maintain Workers’ Compensation and other legally required insurance with respect to the Contractor’s own employees and agents.

D. The Government shall in no event be liable or responsible for damage or injury to any person or property occasioned through the use, maintenance, or operation of any vehicle or other equipment by, or the action of, the Contractor or the Contractor’s employees and agents in performing under this contract, and the

5/18/2022 Statement of Work Page 12 of 12

Government shall be indemnified and held harmless against claims for damage or injury in such cases.

1.8. SAFETY AND SECURITY

A. The contractor shall be responsible for the safe progress of the work to assure that medical staff, visitors, and children are not allowed access to unsafe areas or conditions during the progress of the work. The contractor and staff shall afford all staff, patients, and visitors’ professional courtesy during the course of the project. Interim life safety measures will be strictly enforced during construction.

For details, contact the Safety Officer at the Rosebud Comprehensive Health Care Center.

B. The hospital and the Indian Health Service staff shall not be responsible for the security of the contractor’s tools, equipment, or material during the course of the project.

1.9. RESTORATION

A. The contractor shall restore all areas disturbed by construction to a condition at least equal to or better than prior condition before construction. The contractor shall dispose of all excess construction materials, equipment, tools, waste, and rubbish. For additional disposal information please contact the Solid Waste Coordinator for the Rosebud Sioux Tribe.

1.10. WARRANTY

A. Unless otherwise specified, the contractor shall guarantee all materials and equipment furnished and work performed for a period of one year from the date of substantial completion. The contractor shall promptly make such corrections as may be necessary by reason of such defects including the repairs of any damage to other parts of the systems resulting from such defects. The COR will give notice of observed defects with reasonable promptness.

1.11. CLOSEOUT DOCUMENTS

A. The Contractor shall submit one hard copy set of all final, installed submittal items, accessories, and all installation/operation/maintenance documents associated with the project and as a part of the final O&M package of the project.

B. The Contractor shall also submit one electronic copy of all final closeout documentation to the COR/PM or government project representative.

APPENDIX A - PROPOSED

CONDENSATE DRAIN DESIGN AND

INSTALLATION DETAIL

m m

AHU DRAIN PAN SLOPED

AT

" PER FOOT

CLEAN OUT REQUIRED AT EACH SIDE OF

U-BEND AND AT END OF DRAIN LINE

4"

12"

8"

FLOOR SINK OR DRAIN

1 INCH AIR GAP

1-1/2" SCHEDULE 40 PVC

SLOPE HORIZONTAL RUN AT

" PER FOOT TO DRAIN

NOT TO SCALEM1

1 PROPOSED P-TRAP DESIGN AND INSTALLATION DETAIL

AHU Viewport For 2” (5.1 cm) Wall /Panel

AHU Viewport For 2” (5.1 cm) Wall /Panel

The Steril-Aire AHU Viewport provides a safe, effective means to view working UVC Emitters™ inside an air handling unit (AHU). The AHU Viewport provides installation flexibility for AHU insulated walls of 2” (5.1 cm). It provides the ability to view the interior of the AHU through a 6” x 6” (15.2 cm x 15.2 cm) clear wire glass without the need to open access panels/doors or disconnecting circuits while offering personnel protection against exposure to UVC light.

UVC for HVAC

TM

Corporate Office:

2840 N. Lima Street Burbank, CA 91504 Telephone: 818-565-1128 Fax: 818-565-1129

Website: www.steril-aire.com Email: sales@steril-aire.com

Steril-Aire, Inc.

© 2010 Steril-Aire 1126-07/10

Applications

The Viewport provides an observation window to view the interior of medium and large AHUs. For use in air handling unit insulated wall/panels of 2” (5.1 cm).

S

818-565-1128 w

F

A

Benefits

• Allows for viewing of AHU interior and Steril-Aire UVC Emitters without opening access doors/panels

• Quick, easy installation

• Large 6” x 6” (15.2 cm x 15.2 cm) wire glass observation window

AHU Viewport Specifications

The AHU Viewport shall be factory assembled and tested.

The AHU Viewport shall consist of the following:

PANELS: Two layers of aluminum framing with 8 pre-drilled screw holes and 8 screws

GASKET: Adhesive gasket tape on framing perimeter

GLASS: Wire glass 6” x 6” x 1/4” (15.2 cm x 15.2 cm x .6 cm)

Special Characteristics

• 6” x 6” viewport

• Clear wire glass

• Aluminum frame of 6063-T5 alloy tempered to an UTS of 22 ksi and YS of 16 ksi

• Framing and screws made of noncorrosive materials

• Free from defects impairing strength and/or durability

• Easy to install

Part Number

90000217AHU Viewport - For 2” (5.1 cm) Wall/Panel

Description

Ordering Information

APPENDIX B - PROPOSED VIEWPORT PRODUCT

mpfister Text Box

POWER AND CONTROL CONNECTORS

mpfister Text Box

APPENDIX C - CONTROL UNIT AND CENTRAL UNIT PICTURES

Line

CONTROL UNIT

mpfister Text Box

CENTRAL OR MAIN UNIT

mpfister Line

Line

(E)1 1/4" DCW

EXISTING

CHASE

EXISTING

CHASE

ASHRAE 170 HVAC

IMPROVEMENTS

REV

ISSUE:

PROJECT NO:

CAD DWG FILE:

DRAWN BY:

CHECKED BY:

SHEET TITLE

DATE DESCRIPTION

SHEET ______ OF ______

U. S. DEPARTMENT

OF HEALTH AND

HUMAN SERVICES

3-2-2022 131242

3/2/22 100% CONSTRUCTION DOCUMENTS

MD-208

MD-208

PENTHOUSE PIPING

DEMO PLAN

PFISTER

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

ROS

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text

INDIAN HEALTH SERVICE

AutoCAD SHX Text

DIVISION OF

AutoCAD SHX Text

FACILITY MANAGEMENT

AutoCAD SHX Text

DFM DRECTOR

AutoCAD SHX Text

DFM PROJECT MANAGER

AutoCAD SHX Text

OEHE DIRECTOR

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

CONCURRENCE

AutoCAD SHX Text

OEHE DIRECTOR, ACTING

AutoCAD SHX Text

REVIEWED:

AutoCAD SHX Text

DFM ARCHITECT / ENGINEER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text P

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

GREAT PLAINS AREA

AutoCAD SHX Text

AutoCAD SHX Text

PENTHOUSE PIPING DEMO PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INCH = 1 FOOT

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 15'

AutoCAD SHX Text 10'

AutoCAD SHX Text 5'

AutoCAD SHX Text

AutoCAD SHX Text 12"

AutoCAD SHX Text

NORTH

AutoCAD SHX Text DEMOLISH EXISTING PVC CONDENSATE DRAIN AND ALL ACCESSORIES PER THE SOW AND REMOVE FROM SITE. DEMOLISH EXISTING INCH PVC RO PIPING AND ALL ACCESSORIES PER 34 INCH PVC RO PIPING AND ALL ACCESSORIES PER THE SOW AND REMOVE FROM SITE. CAREFULLY REMOVE EXISTING HUMIDIFIER AND PREPARE FOR REINSTALLATION PER M-208 REMODEL PLAN, SOW, AND MANUFACTURE WRITTEN INSTRUCTIONS. ENSURE PROPERLY SIZED HUMIDIFIER IS INSTALLED IN CORRECT LOCATION. SEE SHEET M-208 FOR DETAILS. CAREFULLY REMOVE EXISTING HOUSING FEED THROUGH PORTS UP STREAM OF EXISTING FILTER BANK AT THE AIR HANDLER WALL AND PREPARE FOR REINSTALLATION IN A DIFFERENT LOCATION. SEE REMODEL PLAN. SEAL EXISTING HOUSING FEED THROUGH HOLES AIR AND WATER TIGHT.

AutoCAD SHX Text

MECHANICAL KEYNOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PENTHOUSE KEYPLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL MECHANICAL NOTES

AutoCAD SHX Text

1. EXISTING DUCTWORK/PIPING/EQUIPMENT SHOWN WAS OBTAINED FROM EXISTING DUCTWORK/PIPING/EQUIPMENT SHOWN WAS OBTAINED FROM ORIGINAL CONTRACT DOCUMENTS. EXACT LOCATIONS AND SIZES SHALL BE DETERMINED IN FIELD BY CONTRACTOR.

AutoCAD SHX Text

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

DEMO HATCHING - DEMOLISH PIPING WITHIN HATCHED AREA

AutoCAD SHX Text

POINT OF DISCONNECT - DEMO PIPING FROM EXISTING EQUIP.

AutoCAD SHX Text

ROS

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING EQUIPMENT TAG (RO SYSTEM, HUMIDIFIER, ETC.)

mpfister

APPENDIX D - CONTRACT DRAWINGS

(E)1-1/4" DCW

CHASE

1-1/2" DRAIN

3/4" DRAIN

3/4" RO SUPPLY

1-1/2" DRAIN

3/4" DRAIN

3/4" RO SUPPLY

3/4" RO SUPPLY

3/4" RO SUPPLY

3/4" DRAIN

1-1/2" DRAIN

EXISTING

CHASE

EXISTING

CHASE

1/2" RO RETURN

1/2" RO RETURN

1/2" RO RETURN

3/4" RO RETURN

1/2" RO RET.

3/4" RO SUP.

ASHRAE 170 HVAC

IMPROVEMENTS

REV

ISSUE:

PROJECT NO:

CAD DWG FILE:

DRAWN BY:

CHECKED BY:

SHEET TITLE

DATE DESCRIPTION

SHEET ______ OF ______

U. S. DEPARTMENT

OF HEALTH AND

HUMAN SERVICES

3-2-2022 131242

3/2/22 100% CONSTRUCTION DOCUMENTS

PFISTER

M-208

M-208

PENTHOUSE PIPING &

HVAC PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

ROS

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text seal

AutoCAD SHX Text seal

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text

INDIAN HEALTH SERVICE

AutoCAD SHX Text

DIVISION OF

AutoCAD SHX Text

FACILITY MANAGEMENT

AutoCAD SHX Text

DFM DRECTOR

AutoCAD SHX Text

DFM PROJECT MANAGER

AutoCAD SHX Text

OEHE DIRECTOR

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

CONCURRENCE

AutoCAD SHX Text

OEHE DIRECTOR, ACTING

AutoCAD SHX Text

REVIEWED:

AutoCAD SHX Text

DFM ARCHITECT / ENGINEER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text P

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

GREAT PLAINS AREA

AutoCAD SHX Text

AutoCAD SHX Text

PENTHOUSE PIPING PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INCH = 1 FOOT

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 15'

AutoCAD SHX Text 10'

AutoCAD SHX Text 5'

AutoCAD SHX Text

AutoCAD SHX Text 12"

AutoCAD SHX Text

NORTH

AutoCAD SHX Text CONNECT EXISTING 1-1/4" DCW COPPER LINE TO EXISTING SOFT WATER SYSTEM PER THE STATEMENT OF WORK (SOW) AND THE MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE INSULATION ON ALL EXPOSED COPPER PIPING AND FITTINGS PER THE SOW. RE-LOCATE 148 KG/HR (326 LBS/HR) HUMIDIFIER UNIT TO THIS LOCATION. THERE IS A BLACK X MARKED ON THE FLOOR, ON SITE WHERE THE RE-LOCATED UNIT SHALL SIT. INSTALL PER SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE AND CONNECT NEW 34INCH SCHEDULE 40 PVC RO WATER SERVICE AND ISOLATION VALVE PER THE SOW AND IN AN ACCESSIBLE LOCATION. ALSO PROVIDE NEW DRAIN LINE AND ROUTE TO FLOOR DRAIN PER THE SOW. KEEP ALL NEW WATER LINES AND DRAINS AWAY FROM EXISTING VFD PER THE LATEST NEC AND INSTALLED DIRECTLY BEHIND THE NEW HUMIDIFIER MOUNTING LOCATION. RE-LOCATE 74 KG/HR (163 LBS/HR) HUMIDIFIER UNIT TO THIS LOCATION. THERE IS A BLACK X MARKED ON THE CONCRETE FLOOR ON SITE WHERE THE RE-LOCATED UNIT SHALL SIT. INSTALL PER SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE AND CONNECT NEW 34INCH SCHEDULE 40 PVC RO WATER SERVICE AND ISOLATION VALVE PER THE SOW AND IN AN ACCESSIBLE LOCATION. ALSO PROVIDE NEW DRAIN LINE AND ROUTE TO FLOOR DRAIN PER THE SOW. RE-LOCATE 74 KG/HR (163 LBS/HR) HUMIDIFIER UNIT TO THIS APPROXIMATE LOCATION AND OUT OF THE WAY OF THE EXISTING HEATING WATER PIPING WHICH IS NOT SHOWN. COORDINATE EXACT LOCATION WITH COR/PM. INSTALL PER SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE AND CONNECT NEW INCH SCHEDULE 40 PVC RO WATER 34 INCH SCHEDULE 40 PVC RO WATER SERVICE AND ISOLATION VALVE PER THE SOW AND IN AN ACCESSIBLE LOCATION. ALSO PROVIDE NEW DRAIN LINE AND ROUTE TO FLOOR DRAIN PER THE SOW. RE-LOCATE 103 KG/HR (227 LBS/HR) HUMIDIFIER UNIT TO THIS LOCATION. THERE IS A BLACK X MARKED ON THE CONCRETE FLOOR ON SITE WHERE THE RE-LOCATED UNIT SHALL SIT. INSTALL PER SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE AND CONNECT NEW 34INCH SCHEDULE 40 PVC RO WATER SERVICE AND ISOLATION VALVE PER THE SOW AND IN AN ACCESSIBLE LOCATION. ALSO PROVIDE NEW DRAIN LINE AND ROUTE TO FLOOR DRAIN PER THE SOW. RE-LOCATE 33 KG/HR (73 LBS/HR) HUMIDIFIER UNIT TO THIS LOCATION. THERE IS A BLACK X MARKED ON THE CONCRETE FLOOR ON SITE WHERE THE RE-LOCATED UNIT SHALL SIT. INSTALL PER SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE AND CONNECT NEW & 34 & 12 INCH SCHEDULE 40 PVC RO SUPPLY AND RETURN WATER SERVICE AND ALL ACCESSORIES PER THE SOW, NOTE 12, ASHRAE 170, AND IN AN ACCESSIBLE LOCATION. ALSO PROVIDE NEW DRAIN LINE AND ROUTE TO FLOOR DRAIN PER THE SOW. ROUTE HUMIDIFIER CONDENSATE DRAINS TO EXISTING FLOOR SINK ACCORDING TO SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE P-TRAP AT DRAIN EXIT ACCORDING TO APPENDIX B AND PROVIDE ALL DRAINS WITH PROPER AIR GAP ACCORDING TO THE LATEST IMC. PROVIDE, INSTALL, AND CONNECT MANUFACTURED CONDAIR SPRAY CIRCUITS FROM EACH NOZZLE GRID SYSTEM TO THE HOUSING FEED THROUGHS LOCATED AT THE AIR HANDLER WALL PER THE SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. SEAL ALL FEED THROUGH HOLES THAT ARE NOT USED AIR TIGHT AT THE AIR HANDLER WALL PER THE SOW. PROVIDE, INSTALL, AND CONNECT MANUFACTURED CONDAIR FLEX TUBING FROM HUMIDIFIER UNIT TO HOUSING FEED THROUGHS LOCATED AT THE AIR HANDLER WALL PER THE SOW AND MANUFACTURE WRITTEN INSTRUCTIONS. RE-LOCATE AND INSTALL EXISTING MANUFACTURED CONDAIR HOUSING FEED THROUGHS IN AIR HANDLER WALL NEAR THE HUMIDIFIER ACCESS DOOR ACCORDING TO THE MANUFACTURE WRITTEN INSTRUCTIONS. ROUTE TUBING UNDERNEATH ACCESS DOOR IF NECESSARY AND PROTECT WITH STAINLESS STEEL FOOT GUARD. FINAL GUARD MATERIAL AND METHODS SHALL BE APPROVED BY FACILITY MANAGER, COR, AND PM. PROVIDE AND INSTALL GLASS 6"X6" STERIL-AIR AHU VIEWPORT (OR APPROVED EQUAL) WITHIN EXISTING AIR HANDLER HUMIDIFIER ACCESS DOOR. SEE APPENDIX C FOR PROPOSED PRODUCT CUT SHEET. COORDINATE WITH FACILITY MANAGER, COR, AND PM FOR UNIT SHUT DOWN SCHEDULE. PROVIDE AND INSTALL ALL REQUIRED PIPING AND ACCESSORIES ACCORDING TO THE SOW, ASHRAE 170, AND THE MANUFACTURE WRITTEN INSTRUCTIONS INCLUDING BUT NOT LIMITED TO COMPLETE RETURN PIPING SYSTEM, AN ISOLATION VALVE ON THE SUPPLY AND RETURN LINES, AND SUBMICRON IN-LINE FILTER. ALL ACCESSORIES SHALL BE INSTALLED AS CLOSE TO THE HUMIDIFIER UNIT AS POSSIBLE AND IN AN ACCESSIBLE LOCATION. PROVIDE RETURN BRANCH ISOLATION VALVE, CHECK VALVE, AND CIRCUIT SETTER BALANCING VALVE AND SET TO GPM FLOW. 12 GPM FLOW.

AutoCAD SHX Text

MECHANICAL KEYNOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PENTHOUSE KEYPLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL MECHANICAL NOTES

AutoCAD SHX Text

1. EXISTING DUCTWORK/PIPING/EQUIPMENT SHOWN WAS OBTAINED FROM EXISTING DUCTWORK/PIPING/EQUIPMENT SHOWN WAS OBTAINED FROM ORIGINAL CONTRACT DOCUMENTS. EXACT LOCATIONS AND SIZES SHALL BE DETERMINED IN FIELD BY CONTRACTOR. 2. CONTRACTOR SHALL PROVIDE AND INCLUDE A FULL CONDAIR CONTRACTOR SHALL PROVIDE AND INCLUDE A FULL CONDAIR FACTORY STARTUP AND COMMISSIONING SERVICE AS A PART OF THIS CONTRACT AND PER THE STATEMENT OF WORK (SOW) FOR THE RO SYSTEM AND ALL HUMIDIFIERS. CONTRACTOR IS ALSO REQUIRED TO COMMISSION AND VERIFY THAT THE NEW KINETICO SOFT WATER SYSTEM IS 100% OPERATIONAL.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING EQUIPMENT TAG - RO SYSTEM, AHU, HUMIDIFIER, ETC.

AutoCAD SHX Text

POINT OF CONNECTION

AutoCAD SHX Text

DCW, RO WATER, OR CONDENSATE DRAINS

AutoCAD SHX Text

EXISTING ELECTRICAL PANEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LEGEND CONT.

AutoCAD SHX Text

CIRCUIT SETTER BALANCING VALVE

AutoCAD SHX Text

RO WATER RETURN OR RECIRCULATION LINE

AutoCAD SHX Text

CHECK VALVE

CHASE

EXISTING

CHASE

EXISTING

CHASE

PLE2-1

PLE2-2

PLE2-3

PLE2-4

PLE2-5

(E) PANEL PLE2

(E) DISTRIBUTION PANEL DHPE

DHPE-26

ASHRAE 170 HVAC

IMPROVEMENTS

REV

ISSUE:

PROJECT NO:

CAD DWG FILE:

DRAWN BY:

CHECKED BY:

SHEET TITLE

DATE DESCRIPTION

SHEET ______ OF ______

U. S. DEPARTMENT

OF HEALTH AND

HUMAN SERVICES

5-18-2022 131242

5/18/22 100% CONSTRUCTION DOCUMENTS

E-108

PFISTER

E-108

PENTHOUSE

ELECTRICAL AND

CONTROLS PLAN

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

ROS

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text

AHU

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

CONSULTANTS

AutoCAD SHX Text seal

AutoCAD SHX Text seal

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text L

AutoCAD SHX Text

AutoCAD SHX Text H

AutoCAD SHX Text N

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text U

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text

INDIAN HEALTH SERVICE

AutoCAD SHX Text

DIVISION OF

AutoCAD SHX Text

FACILITY MANAGEMENT

AutoCAD SHX Text

DFM DRECTOR

AutoCAD SHX Text

DFM PROJECT MANAGER

AutoCAD SHX Text

OEHE DIRECTOR

AutoCAD SHX Text

APPROVED:

AutoCAD SHX Text

CONCURRENCE

AutoCAD SHX Text

OEHE DIRECTOR, ACTING

AutoCAD SHX Text

REVIEWED:

AutoCAD SHX Text

DFM ARCHITECT / ENGINEER

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DATE

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text U

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text H

AutoCAD SHX Text P

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text L

AutoCAD SHX Text H

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

GREAT PLAINS AREA

AutoCAD SHX Text

AutoCAD SHX Text

PENTHOUSE ELECTRICAL PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INCH = 1 FOOT

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text 15'

AutoCAD SHX Text 10'

AutoCAD SHX Text 5'

AutoCAD SHX Text

AutoCAD SHX Text 12"

AutoCAD SHX Text

NORTH

AutoCAD SHX Text PROVIDE POWER CIRCUIT FROM EXISTING 120V/ 15 AMP BREAKER OF PLE2 PER NEC REQUIREMENTS. PROVIDE WIRE, GROUND, CONDUIT, AND ALL ACCESSORIES FOR A COMPLETE AND 100% OPERABLE SYSTEM. CONNECT POWER AND CONTROL WIRING FROM THE CONTROL UNIT TO THE MAIN UNIT ACCORDING TO SECTION 1.4, D., 3. OF THE SOW, THE MANUFACTURE WRITTEN INSTRUCTIONS, AND THE NEC. TEMPERATURE CONTROLS CONTRACTOR TO PROVIDE AND CONNECT BACNET SERIAL COMMUNICATION TO EACH HUMIDIFIER PER THE SOW AND THE MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE ALL GRAPHICS AND CONTROLS POINTS LISTED IN THE SOW. PROVIDE POWER CIRCUIT FROM EXISTING PANEL PLE2 PER NEC REQUIREMENTS. PROVIDE NEW 120V/ 15 AMP BREAKER, WIRE, GROUND, CONDUIT, AND ALL ACCESSORIES FOR A COMPLETE AND 100% OPERABLE SYSTEM. CONNECT POWER AND CONTROL WIRING FROM THE CONTROL UNIT TO THE MAIN UNIT ACCORDING TO SECTION 1.4, D., 3. OF THE SOW, THE MANUFACTURE WRITTEN INSTRUCTIONS, AND THE NEC. TEMPERATURE CONTROLS CONTRACTOR TO PROVIDE AND CONNECT BACNET SERIAL COMMUNICATION TO EACH HUMIDIFIER PER THE SOW AND THE MANUFACTURE WRITTEN INSTRUCTIONS. PROVIDE ALL GRAPHICS AND CONTROLS POINTS LISTED IN THE SOW. PROVIDE POWER CIRCUIT FROM EXISTING 480V/3PH/ 15 AMP BREAKER OF DHPE TO EXISTING REVERSE OSMOSIS SYSTEM DISCONNECT PER NEC REQUIREMENTS. PROVIDE WIRE, GROUND, CONDUIT, AND ALL ACCESSORIES FOR A COMPLETE AND 100% OPERABLE SYSTEM. DEMOLISH EXISTING SUPPLY DUCT TEMPERATURE AND HUMIDITY SENSOR. PROVIDE AND INSTALL NEW SUPPLY DUCT TEMPERATURE AND HUMIDITY SENSOR IN SAME LOCATION. TEMPERATURE CONTROLS CONTRACTOR TO ENSURE SENSORS ARE READING ACCURATELY ON METASYS AIR HANDLER GRAPHIC AS WELL AS HUMIDIFIER GRAPHIC. DEMOLISH EXISTING RETURN DUCT TEMPERATURE AND HUMIDITY SENSOR. PROVIDE AND INSTALL NEW RETURN DUCT TEMPERATURE AND HUMIDITY SENSOR IN SAME LOCATION. TEMPERATURE CONTROLS CONTRACTOR TO ENSURE SENSORS ARE READING ACCURATELY ON METASYS AIR HANDLER GRAPHIC AS WELL AS HUMIDIFIER GRAPHIC. TEMPERATURE CONTROLS CONTRACTOR SHALL CONTROL HUMIDIFIER TO MAINTAIN RETURN HUMIDITY SETPOINT ACCORDING TO MANUFACTURE WRITTEN INSTRUCTIONS OR RECOMMENDATIONS.

AutoCAD SHX Text

ELECTRICAL KEYNOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PENTHOUSE KEYPLAN

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

NO SCALE

AutoCAD SHX Text

PENTHOUSE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL ELECTRICAL NOTES

AutoCAD SHX Text

1. ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST NEC (NFPA ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST NEC (NFPA 70). 2. CONTRACTOR SHALL PROVIDE AND INSTALL ALL POWER WIRING IN CONTRACTOR SHALL PROVIDE AND INSTALL ALL POWER WIRING IN PROPER RACEWAYS PER THE NEC.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

ROS

AutoCAD SHX Text

AutoCAD SHX Text

FUSED SWITCH

AutoCAD SHX Text

SAFETY SWITCH

AutoCAD SHX Text

EXISTING MECHANICAL EQUIPMENT TAG - RO SYSTEM, ETC.

AutoCAD SHX Text

EXISTING ELECTRICAL PANEL WITHIN SCOPE OF WORK

AutoCAD SHX Text

EXISTING ELECTRICAL PANEL NOT IN SCOPE OF WORK

AutoCAD SHX Text

EXISTING MECHANICAL EQUIPMENT

AutoCAD SHX Text

(EXISTING)

AutoCAD SHX Text

(EXISTING)

APPENDIX E - ASHRAE 170 HUMIDIFICATION REQUIREMENTS

APPENDIX_A.pdf
Sheets and Views
Layout1
APPENDIX_D.pdf
PIPING DEMO PLAN
MD-208
PIPING NEW PLAN
M-208
ELECT & CNTRLS PLAN
E-108
E108_ELECTRICAL_PLAN.pdf
Sheets and Views
E-108
M208_DEMO_PLUMBING.pdf
Sheets and Views
M-208
M208_NEW_PLUMBING.pdf
Sheets and Views
M-208
E108_ELECTRICAL_PLAN.pdf
Sheets and Views
E-108

File details come from the government source that posted it. Updated .