Attachment 2 Request for Technical Literature (Lawnmowers).pdf

PDF 111 KB Posted

Attached to
FRONT CUT LAWNMOWERS Federal contract opportunity
Solicitation number
W911KF-20-Q-0043
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to FRONT CUT LAWNMOWERS, newest first.
File Type Posted
Amendment 002.pdf PDF
Amendment 001.pdf PDF
20-Q-0043.pdf PDF
Attachment 1 Statement of Work- Lawn Mowers (Revised 3-16-20).pdf PDF
Attachment 3 DD Form 1423.pdf PDF
Attachment 4 DD Form 1664.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11/16/18

Request for Technical Literature

A. The bidder shall provide, with its bid, descriptive literature that has previously been used to market the

Lawnmowers. The literature will be used to technically evaluate the bid and shall describe how the mowers meet requirements of the specification; specifically the paragraphs:

Ref. Paragraph Information Furnished

3.0 Requirements

3.1 (A-K) General Requirements for Front Cut Mowers

3.1.1 (A-H) Engine for Front Cut Mowers

3.1.2(A-C) Drivetrain for Front Cut Mowers

3.1.3(A-H) Deck for Front Cut Mowers

3.1.4 (A-G) Console Information/Warning Lights for Front Cut Mowers

3.2 (L-V) General Requirements for Zero-Turn Mowers

3.2.1 (A-H) Engine for Zero-Turn Mowers

3.2.2(A-C) Drivetrain for Zero-Turn Mowers

3.2.3(A-J) Deck for Zero-Turn Mowers

3.2.4(A-G) Console Information/Warning Lights for Zero-Turn Mowers

6.1 Manuals

6.4 Warranty

b. The features, which must be addressed in the descriptive literature, are necessary to consider the bid responsive.

If the bidder’s preprinted literature does not show all these features, the bidder must attach a letter of supplemental information to the literature describing in detail those required features.

c. The failure of descriptive literature to show that the product offered conforms to the requirements of this solicitation will require rejection of the bid.

Conditions’, or ‘prices are subject to change without notice’ shall not be considered for an award. The government has no assurance the products offered will conform to the specification; therefore, the bid is not considered a firm bid and will not be considered for an award.

File details come from the government source that posted it. Updated .