This document is a solicitation for repair work on Fifth Street. It requests bids for asphalt paving, aggregate base courses, milling, and pavement markings. The work includes repairing and resurfacing approximately 2 miles of Fifth Street to specified dimensions and material requirements. Bids are due by April 30th to the Department of the Air Force Air Education and Training Command. The selected contractor will be required to follow standards for asphalt mix design, aggregate gradation, compaction, grade tolerances, and traffic control during construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Past Performance Reference List.pdf | ||
| Attachment 4 - Wage Determination.pdf | ||
| Attachment 8 - SF 1444.pdf | ||
| Attachment 9 - Notice of Compliance.pdf | ||
| Solicitation - FA301020R0025.pdf | ||
| Attachment 3 - Repair Fifth Street DWG revA.pdf | ||
| Attachment 1 - Repair Fifth Street SOW revA.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf | ||
| Attachment 5 - AF 66.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR FIFTH STREET
SPECIFICATIONS SHEET
30 April 2020 revA
Repair Fifth Street
MAHG20-1048
SECTION 32 12 16
HOT-MIX ASPHALT (HMA) FOR ROADS
08/09
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Method of Measurement
The amount paid for will material shall be a fixed price.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 156 (2013; R 2017) Standard Specification for
Requirements for Mixing Plants for
Hot-Mixed, Hot-Laid Bituminous Paving
Mixtures
AASHTO M 320 (2017) Standard Specification for
Performance-Graded Asphalt Binder
AASHTO T 304 (2011; R 2015) Standard Method of Test for
Uncompacted Void Content of Fine Aggregate
ASPHALT INSTITUTE (AI)
AI MS-2 (2015) Asphalt Mix Design Methods
AI MS-22 (2001; 2nd Ed) Construction of Hot-Mix
Asphalt Pavements
AI SP-2 (2001; 3rd Ed) Superpave Mix Design
ASTM INTERNATIONAL (ASTM)
ASTM C117 (2017) Standard Test Method for Materials
Finer than 75-um (No. 200) Sieve in
Mineral Aggregates by Washing
ASTM C127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and
Absorption of Coarse Aggregate
ASTM C128 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and
Absorption of Fine Aggregate
ASTM C131/C131M (2014) Standard Test Method for Resistance to Degradation of Small-Size Coarse
Aggregate by Abrasion and Impact in the Los
Angeles Machine
ASTM C136/C136M (2014) Standard Test Method for Sieve
Analysis of Fine and Coarse Aggregates
ASTM C142/C142M (2017) Standard Test Method for Clay Lumps and Friable Particles in Aggregates
ASTM C29/C29M (2017a) Standard Test Method for Bulk
Density ("Unit Weight") and Voids in
Aggregate
ASTM C566 (2013) Standard Test Method for Total
Evaporable Moisture Content of Aggregate by Drying
ASTM C88 (2018) Standard Test Method for Soundness of
Aggregates by Use of Sodium Sulfate or
Magnesium Sulfate
ASTM D140/D140M (2016) Standard Practice for Sampling
Asphalt Materials
ASTM D1461 (2017) Standard Test Method for Moisture or Volatile Distillates in Asphalt Mixtures
ASTM D2041/D2041M (2011) Theoretical Maximum Specific Gravity and
Density of Bituminous Paving Mixtures
ASTM D2172/D2172M (2017; E 2018) Standard Test Methods for
Quantitative Extraction of Asphalt Binder from
Asphalt Mixtures
ASTM D2419 (2014) Sand Equivalent Value of Soils and Fine
Aggregate
ASTM D242/D242M (2009; R 2014) Mineral Filler for
Bituminous Paving Mixtures
ASTM D2489/D2489M (2016) Standard Test Method for Estimating Degree of Particle Coating of Asphalt Mixtures
ASTM D2726/D2726M (2017) Standard Test Method for Bulk
Specific Gravity and Density of
Non-Absorptive Compacted Bituminous
Mixtures
ASTM D2950/D2950M (2014) Density of Bituminous Concrete in Place by Nuclear Methods
ASTM D3381/D3381M (2018) Standard Specification for Viscosity-
Graded Asphalt Binder for Use in Pavement
Construction
ASTM D3665 (2012; R 2017) Standard Practice for Random
Sampling of Construction Materials
ASTM D3666 (2016) Standard Specification for Minimum
Requirements for Agencies Testing and Inspecting
Road and Paving Materials
ASTM D4125/D4125M (2010) Asphalt Content of Bituminous
Mixtures by the Nuclear Method
ASTM D4791 (2010) Flat Particles, Elongated Particles, or
Flat and Elongated Particles in Coarse Aggregate
ASTM D4867/D4867M (2009; R 2014) Effect of Moisture on
Asphalt Concrete Paving Mixtures
ASTM D5444 (2015) Mechanical Size Analysis of
Extracted Aggregate
ASTM D6307 (2019) Standard Test Method for Asphalt
Content of Asphalt Mixture by Ignition
ASTM D6926 (2016) Standard Practice for Preparation of Asphalt Mixture Specimens Using
Marshall Apparatus
ASTM D6927 (2015) Standard Test Method for Marshall
Stability and Flow of Bituminous Mixtures
ASTM D946/D946M (2015) Penetration-Graded Asphalt Cement for Use in Pavement Construction
1.2 SUBMITTALS
SD-03 Product Data
Mix Design
Quality Control
Material Acceptance
Percent Payment
SD-04 Samples
Asphalt Cement Binder Aggregates
SD-06 Test Reports Aggregates
QC Monitoring
SD-07 Certificates
Asphalt Cement Binder
Testing Laboratory
1.3 ENVIRONMENTAL REQUIREMENTS
Do not place the hot-mix asphalt upon a wet surface or when the surface temperature of the underlying course is less than specified in Table 3. The temperature requirements may be waived by the Contracting Officer, if requested; however, meet all other requirements, including compaction.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Perform the work consisting of pavement courses composed of mineral aggregate and asphalt material heated and mixed in a central mixing plant and placed on a prepared course. HMA designed and constructed in accordance with this section shall conform to the lines, grades, thicknesses, and typical cross sections indicated. Construct each course to the depth, section, or elevation required by the drawings and roll, finish, and approve it before the placement of the next course.
2.1.1 Asphalt Mixing Plant
Plants used for the preparation of hot-mix asphalt shall conform to the requirements of AASHTO M 156 with the following changes:
2.1.1.1 Truck Scales
Weigh the asphalt mixture on approved, certified scales at the
Contractor's expense. Inspect and seal scales at least annually by an approved calibration laboratory.
2.1.1.2 Testing Facilities
Provide laboratory facilities at the plant for the use of the
Government's acceptance testing and the Contractor's quality control testing.
2.1.2 Hauling Equipment
Provide trucks for hauling hot-mix asphalt having tight, clean, and smooth metal beds. To prevent the mixture from adhering to them, the truck beds shall be lightly coated with a minimum amount of paraffin oil, lime solution, or other approved material. Petroleum based products shall not be used as a release agent. Each truck shall have a suitable cover to protect the mixture from adverse weather. When necessary to ensure that the mixture will be delivered to the site at the specified temperature, truck beds shall be insulated or heated and covers (tarps) shall be securely fastened.
2.1.3 Asphalt Pavers
Provide asphalt pavers which are self-propelled, with an activated screed, heated as necessary, and capable of spreading and finishing courses of hot-mix asphalt which will meet the specified thickness, smoothness, and grade. The paver shall have sufficient power to propel itself and
Table 3. Surface Temperature Limitations of Underlying Course
Mat Thickness, inches Degrees C F
3 or greater 40
Less than 3 45 the hauling equipment without adversely affecting the finished surface.
2.2 AGGREGATES
Provide aggregates consisting of crushed stone, crushed gravel, crushed slag, screenings, natural sand and mineral filler, as required. The portion of material retained on the No. 4 sieve is coarse aggregate.
The portion of material passing the No.4 sieve and retained on the No.
200 sieve is fine aggregate. The portion passing the No. 200 sieve is defined as mineral filler. Submit all aggregate test results and samples to the Contracting Officer at least 14 days prior to start of construction.
2.2.1 Coarse Aggregate
Provide coarse aggregate consisting of sound, tough, durable particles, free from films of material that would prevent thorough coating and bonding with the asphalt material and free from organic matter and other deleterious substances. All individual coarse aggregate sources shall meet the following requirements:
a. The percentage of loss shall not be greater than 40 percent after
500 revolutions when tested in accordance with ASTM C131/C131M.
b. The percentage of loss shall not be greater than 18 percent after five cycles when tested in accordance with ASTM C88 using magnesium sulfate [or 12 percent when using sodium sulfate].
c. At least 75 percent by weight of coarse aggregate shall have at least two or more fractured faces when tested in accordance with COE CRD-C
171. Fractured faces shall be produced by crushing.
d. The particle shape shall be essentially cubical and the aggregate shall not contain more than 20 percent percent, by weight, of flat and elongated particles (3:1 ratio of maximum to minimum) when tested in accordance with ASTM D4791.
e. Slag shall be air-cooled, blast furnace slag, with a compacted weight of not less than 75 lb/cu ft when tested in accordance with ASTM
C29/C29M.
f. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C142/C142M.
2.2.2 Fine Aggregate
Fine aggregate shall consist of clean, sound, tough, durable particles free from coatings of clay, silt, or any objectionable material and containing no clay balls.
a. All individual fine aggregate sources shall have a sand equivalent value not less than 45 when tested in accordance with ASTM
D2419.
b. The fine aggregate portion of the blended aggregate shall have an uncompacted void content not less than 45.0 percent when tested in accordance with AASHTO T 304 Method A.
c. The quantity of natural sand (noncrushed material) added to the aggregate blend shall not exceed 25 percent by weight of total aggregate.
d. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C142/C142M
2.2.3 Mineral Filler
Mineral filler shall be nonplastic material meeting the requirements of
ASTM D242/D242M.
2.2.4 Aggregate Gradation
The combined aggregate gradation shall conform to gradations specified in Table 4, when tested in accordance with ASTM C136/C136M and ASTM
C117, and shall not vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa, but grade uniformly from coarse to fine.
Table 4. Aggregate Gradations
Sieve Size, inch Gradation 1 Percent
Passing by Mass
Gradation 2 Percent
Passing by Mass
Gradation 3 Percent
Passing by Mass
1 100 --- ---
3/4 76-96 100 ---
1/2 68-88 76-96 100
3/8 60-82 69-89 76-96
No. 4 45-67 53-73 58-78
No. 8 32-54 38-60 40-60
No. 16 22-44 26-48 28-48
No. 30 15-35 18-38 18-38
No. 50 9-25 11-27 11-27
No. 100 6-18 6-18 6-18
2.3 ASPHALT CEMENT BINDER
Submit a 5 gallon sample for mix design verification. Asphalt cement binder shall conform to AASHTO M 320 Performance Grade (PG). Test data indicating grade certification shall be provided by the supplier at the time of delivery of each load to the mix plant. Submit copies of these certifications to the Contracting Officer. The supplier is defined as the last source of any modification to the binder. The Contracting
Officer may sample and test the binder at the mix plant at any time before or during mix production. Obtain samples for this verification testing in accordance with ASTM D140/D140M and in the presence of the
Contracting Officer.
Furnish these samples to the Contracting Officer for the verification testing, which shall be at no cost to the Contractor. Submit samples of the asphalt cement specified for approval not less than 14 days before start of the test section. Submit copies of certified test data, amount, type and description of any modifiers blended into the asphalt cement binder.
2.3 MIX DESIGN
a. Develop the mix design. The asphalt mix shall be composed of a mixture of well-graded aggregate, mineral filler if required, and asphalt material. The aggregate fractions shall be sized, handled in separate size groups, and combined in such proportions that the resulting mixture meets the grading requirements of the job mix formula
(JMF). Submit proposed JMF; do not produce hot-mix asphalt for payment until a JMF has been approved. The hot-mix asphalt shall be designed in accordance with Marshall (MS-02) or Hveem (MS-02) procedures and the criteria shown in Table 5.
2.4.1 JMF Requirements
Submit in writing the job mix formula for approval at least 14 days prior to the start of the test section including as a minimum:
a. Percent passing each sieve size.
b. Percent of asphalt cement.
c. Percent of each aggregate and mineral filler to be used.
d. Asphalt viscosity grade, penetration grade, or performance grade.
e. Number of blows of hand-held hammer per side of molded specimen.
(NA for Superpave)
f. Laboratory mixing temperature.
No. 200 3-6 3-6 3-6
g. Lab compaction temperature.
h. Temperature-viscosity relationship of the asphalt cement.
i. Specific gravity and absorption of each aggregate.
j. Percent natural sand.
k. Percent particles with 2 or more fractured faces (in coarse aggregate).
l. Fine aggregate angularity.
m. Percent flat or elongated particles (in coarse aggregate).
n. Tensile Strength Ratio (TSR).
o. Antistrip agent (if required) and amount.
p. List of all modifiers and amount.
q. Percentage and properties (asphalt content, binder properties, and aggregate properties) of reclaimed asphalt pavement (RAP) in accordance with paragraph RECYCLED HOT-MIX ASPHALT, if RAP is used.
2.4 RECYCLED HOT MIX ASPHALT
Recycled HMA shall consist of reclaimed asphalt pavement (RAP), coarse aggregate, fine aggregate, mineral filler, and asphalt cement to produce a consistent gradation and asphalt content and properties. When RAP is fed into the plant, the maximum RAP chunk size shall not exceed 2 inches. Design the recycled HMA mix using procedures contained in AI MS-2 and
AI MS-22. The job mix shall meet the requirements of paragraph MIX DESIGN.
The amount of RAP shall not exceed 30 percent.
2.4.1 RAP Aggregates and Asphalt Cement
The blend of aggregates used in the recycled mix shall meet the requirements of paragraph AGGREGATES. Establish the percentage of asphalt in the RAP for the mixture design according to ASTM D2172/D2172M or
ASTM D6307 using the appropriate dust correction procedure.
3.1 PREPARATION OF ASPHALT BINDER MATERIAL
Heat the asphalt cement material avoiding local overheating and providing a continuous supply of the asphalt material to the mixer at a uniform temperature. The temperature of unmodified asphalts shall be no more than
325 degrees F when added to the aggregates.
3.2 PREPARATION OF MINERAL AGGREGATE
Table 5. Mix Design Criteria
Test Property 50 Blows or Mix
Gyrations
75 Blows or Mix
Gyrations
Stability, N pounds, minimum (NA for
Superpave)
*44501000 *80001800
Flow, 0.01 inch, (NA for Superpave) 8-18 8-16
Air voids, percent 3-5 3-5
Percent Voids in mineral aggregate
(VMA),(minimum)
Gradation 1 13.0 13.0
Gradation 2 14.0 14.3
Gradation 3 15.0 15.0
TSR, minimum percent 75 75
* This is a minimum requirement. The average during construction shall be significantly higher than this number to ensure compliance with the specifications.
** Calculate VMA in accordance with AI MS-2, based on ASTM C127 and ASTM C128 bulk specific gravity for the aggregate.
Heat and dry the aggregate for the mixture prior to mixing. No damage shall occur to the aggregates due to the maximum temperature and rate of heating used. The temperature of the aggregate and mineral filler shall not exceed 350 degrees F when the asphalt cement is added. The temperature shall not be lower than is required to obtain complete coating and uniform distribution on the aggregate particles and to provide a mixture of satisfactory workability.
3.3 PREPARATION OF HOT-MIX ASPHALT MIXTURE
The aggregates and the asphalt cement shall be weighed or metered and introduced into the mixer in the amount specified by the JMF. Mix the combined materials until the aggregate obtains a uniform coating of asphalt binder and is thoroughly distributed throughout the mixture. Wet mixing time shall be the shortest time that will produce a satisfactory mixture, but no less than 25 seconds for batch plants. Establish the wet mixing time for all plants based on the procedure for determining the percentage of coated particles described in ASTM D2489/D2489M, for each individual plant and for each type of aggregate used. The wet mixing time will be set to at least achieve 95 percent of coated particles. The moisture content of all hot-mix asphalt upon discharge from the plant shall not exceed
0.5 percent by total weight of mixture as measured by ASTM D1461.
3.1 PREPARATION OF THE UNDERLYING SURFACE
Immediately before placing the hot mix asphalt, clean the underlying course of dust and debris. Apply a prime coat and/or tack coat in accordance with the contract specifications.
3.6 TRANSPORTING AND PLACING
3.7.1 Transporting
Transport the hot-mix asphalt from the mixing plant to the site in clean, tight vehicles. Schedule deliveries so that placing and compacting of mixture is uniform with minimum stopping and starting of the paver.
Provide adequate artificial lighting for night placements. Hauling over freshly placed material will not be permitted until the material has been compacted as specified, and allowed to cool to 140 degrees F. To deliver mix to the paver, use a material transfer vehicle operated to produce continuous forward motion of the paver.
3.7.1 Placing
Place and compact the mix at a temperature suitable for obtaining density, surface smoothness, and other specified requirements. Upon arrival, place the mixture to the full width by an asphalt paver; it shall be struck off in a uniform layer of such depth that, when the work is completed, it will have the required thickness and conform to the grade and contour indicated. Regulate the speed of the paver to eliminate pulling and tearing of the asphalt mat.
Unless otherwise permitted, placement of the mixture shall begin along the centerline of a crowned section or on the high side of areas with a one-way slope. Place the mixture in consecutive adjacent strips having a minimum width of 10 feet. On isolated areas where irregularities or unavoidable obstacles make the use of mechanical spreading and finishing equipment impractical, the mixture may be spread and luted by hand tools.
3.8 COMPACTION OF MIXTURE
After placing, the mixture shall be thoroughly and uniformly compacted by rolling. Compact the surface as soon as possible without causing displacement, cracking or shoving. The sequence of rolling operations and the type of rollers used shall be at the discretion of the Contractor.
The speed of the roller shall, at all times, be sufficiently slow to avoid displacement of the hot mixture and be effective in compaction. Any displacement occurring as a result of reversing the direction of the roller, or from any other cause, shall be corrected at once. Furnish sufficient rollers to handle the output of the plant. Continue rolling until the surface is of uniform texture, true to grade and cross section, and the required field density is obtained. To prevent adhesion of the mixture to the roller, keep the wheels properly moistened but excessive water will not be permitted. In areas not accessible to the roller, the mixture shall be thoroughly compacted with hand tampers. Any mixture that becomes loose and broken, mixed with dirt, contains check-cracking, or is in any way defective shall be removed full depth, replaced with fresh hot mixture and immediately compacted to conform to the surrounding area. This work shall be done at the
Contractor's expense. Skin patching will not be allowed.
3.10 QUALITY CONTROL
3.10.1 General Quality Control Requirements
Develop and submit an approved Quality Control Plan. Submit aggregate and QC test results. Do not produce hot-mix asphalt for payment until the quality control plan has been approved addressing all elements which affect the quality of the pavement including, but not limited to:
a. Mix Design
b. Aggregate Grading
c. Quality of Materials
d. Stockpile Management
e. Proportioning
f. Mixing and Transportation
g. Mixture Volumetrics
h. Moisture Content of Mixtures
i. Placing and Finishing
j. Joints
k. Compaction
l. Surface Smoothness
3.10.2 Quality Control Testing
Perform all quality control tests applicable to these specifications and as set forth in the Quality Control Program. The testing program shall include, but shall not be limited to, tests for the control of asphalt content, aggregate gradation, temperatures, aggregate moisture, and moisture in the asphalt mixture, laboratory air voids, stability, flow, in-place density, grade and smoothness. Develop a Quality Control Testing Plan as part of the
Quality Control Program.
3.10.3.1 Gradation
Determine aggregate gradations a minimum of twice per lot from mechanical analysis of recovered aggregate in accordance with ASTM D5444. When asphalt content is determined by the ignition oven or nuclear method, aggregate gradation shall be determined from hot bin samples on batch plants, or from the cold feed on drum mix plants. For batch plants, test aggregates in accordance with ASTM C136/C136M using actual batch weights to determine the combined aggregate gradation of the mixture.
3.10.3.2 Additional Testing
Any additional testing, which the Contractor deems necessary to control the process, may be performed at the Contractor's option.
3.10.3.3 QC Monitoring
Submit all QC test results to the Contracting Officer on a daily basis as the tests are performed. The Contracting Officer reserves the right to monitor any of the Contractor's quality control testing and to perform duplicate testing as a check to the Contractor's quality control testing.
3.10.4 Sampling
When directed by the Contracting Officer, sample and test any material which appears inconsistent with similar material being produced, unless such material is voluntarily removed and replaced or deficiencies corrected by the
Contractor. All sampling shall be in accordance with standard procedures specified.
3.11 MATERIAL ACCEPTANCE
Testing for acceptability of work will be performed by an independent laboratory hired by the Contractor. Forward test results to the Contracting
Officer. Acceptance of the plant produced mix and in-place requirements will be on a lot to lot basis. A standard lot for all requirements will be equal to 2000 short tons.
3.11.1 Additional Sampling and Testing
The Contracting Officer reserves the right to direct additional samples and tests for any area which appears to deviate from the specification requirements.
3.11.2 Grade
The final wearing surface of pavement shall conform to the elevations and cross sections shown and shall vary not more than 0.05 foot from the plan grade established and approved at site of work. Finished surfaces at juncture with other pavements shall coincide with finished surfaces of abutting pavements. Deviation from the plan elevation will not be permitted in areas of pavements where closer conformance with planned elevation is required for the proper functioning of drainage and other appurtenant structures involved.
The grade will be determined by running lines of levels at intervals of 25 feet, or less, longitudinally and transversely, to determine the elevation of the completed pavement surface. Within 5 working days, after the completion of a particular lot incorporating the final wearing surface, test the final wearing surface of the pavement for conformance with the specified plan grade.
3.11.1 Surface Smoothness
Use one of the following methods to test and evaluate surface smoothness of the pavement. Perform all testing in the presence of the Contracting Officer.
Keep detailed notes of the results of the testing and furnish a copy to the Government immediately after each day's testing. Where drawings show required deviations from a plane surface (crowns, drainage inlets, etc.), the surface shall be finished to meet the approval of the Contracting Officer.
3.11.1.1 Smoothness Requirements
3.11.1.1.1 Straightedge Testing
The finished surfaces of the pavements shall have no abrupt change of 1/4 inch or more, and all pavements shall be within the tolerances of 1/4 inch in both the longitudinal and transverse directions, when tested with an approved 12 feet straightedge.
3.11.4.2.1 Straightedge Testing
Hold the straightedge in contact with the surface and move it ahead one-half the length of the straightedge for each successive measurement.
Determine the amount of surface irregularity by placing the freestanding
(unleveled) straightedge on the pavement surface and allowing it to rest upon the two highest spots covered by its length, and measuring the maximum gap between the straightedge and the pavement surface in the area between these two high points.
-- End of Section --
BITUMINOUS TACK AND PRIME COATS
1.1.1 Waybills and Delivery Tickets
NA
REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO T 102 (2009; R 2013) Standard Method of Test for Spot Test of Asphaltic Materials
ASTM INTERNATIONAL (ASTM)
ASTM D1250 (2008) Standard Guide for Use of the Petroleum Measurement Tables
ASTM D140/D140M (2016) Standard Practice for Sampling Asphalt Materials
ASTM D2026/D2026M (2015) Cutback Asphalt (Slow-Curing Type)
ASTM D2027/D2027M (2013) Cutback Asphalt (Medium-Curing Type)
ASTM D2028/D2028M (2015) Cutback Asphalt (Rapid-Curing Type)
ASTM D2397/D2397M (2017) Standard Specification for Cationic Emulsified Asphalt
ASTM D2995 (1999; R 2009) Determining Application Rate of Bituminous Distributors
ASTM D6373 (2016) Standard Specification for Performance Graded Asphalt Binder
ASTM D946/D946M (2015) Penetration-Graded Asphalt Cement for Use in
Pavement Construction
ASTM D977 (2017) Standard Specification for Emulsified Asphalt
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design and Construction (LEED-NC)
1.2 QUALITY ASSURANCE
Certificates of compliance for asphalt materials delivered will be obtained and checked to ensure that specification requirements are met.
Tack coat materials will not be diluted. Prime coat materials when emulsions are used can be diluted on site with potable water up to 1 part emulsion to 1 part water.
1.3 DELIVERY, STORAGE, AND HANDLING
Inspect the materials delivered to the site for contamination and damage. Unload and store the materials with a minimum of handling.
1.4 EQUIPMENT, TOOLS AND MACHINES
1.4.1 General Requirements
Equipment, tools and machines used in the work are subject to approval.
Maintain in a satisfactory working condition at all times. Calibrate equipment such as asphalt distributors, scales, batching equipment, spreaders and similar equipment within 12 months of their use. If the calibration expires during project, recalibrate the equipment before work can continue.
1.4.2 Bituminous Distributor
Provide a self-propelled distributor with pneumatic tires of such size and number to prevent rutting, shoving or otherwise damaging the surface being sprayed. Calibrate the distributer in accordance with ASTM D2995. Design and equip the distributor to spray the bituminous material in a uniform coverage at the specified temperature, at readily determined and controlled total liquid rates from 0.03 to 1.0 gallons per square yard, with a pressure range of 25 to 75 psi and with an allowable variation from the specified rate of not more than plus or minus 5 percent, and at variable widths. Include with the distributor equipment a separate power unit for the bitumen pump, full-circulation spray bars, tachometer, pressure gauges, volume-measuring devices, adequate heaters for heating of materials to the proper application temperature, a thermometer for reading the temperature of tank contents, and a hand hose attachment suitable for applying bituminous material manually to areas inaccessible to the distributor. The distributor will be capable of circulating and agitating the bituminous material during the heating process.
1.4.3 Heating Equipment for Storage Tanks
Use steam, electric, or hot oil heaters for heating the bituminous material. Provide steam heaters consisting of steam coils and equipment for producing steam, so designed that the steam cannot come in contact with the bituminous material. Fix an armored thermometer to the tank with a temperature range from C 40 to 400 degrees F so that the temperature of the bituminous material may be determined at all times.
1.4.4 Power Brooms and Power Blowers
Use power brooms and power blowers suitable for cleaning the surfaces to which the bituminous coat is to be applied.
1.5 ENVIRONMENTAL REQUIREMENTS
Apply bituminous coat only when the surface to receive the bituminous coat is dry. A limited amount of moisture (approximately 0.03 gallon/square yard) can be sprayed on the surface of unbound material when prime coat is used to improve coverage and penetration of asphalt material. Apply bituminous coat only when the atmospheric temperature in the shade is C 50 degrees F or above and when the temperature has not been below 35 degrees F for the 12 hours prior to application, unless otherwise directed.
2.1 PRIME COAT
Provide asphalt conforming to one of the following grades:
2.1.1 Emulsified Asphalt
Provide emulsified asphalt conforming to ASTM D977, Type SS-1. Asphalt emulsion can be diluted up to 1 part water to 1 part emulsion for prime coat use. Do not dilute asphalt emulsion for tack coat use.
2.2 TACK COAT
2.2.1 Emulsified Asphalt
Provide emulsified asphalt conforming to ASTM D977, Type RS-1. For prime coats the emulsified asphalt can be diluted with up to 1 part emulsion to 1 part water. No dilution is allowed for tack coat applications. The base asphalt used to manufacture the emulsion is required to show a negative spot when tested in accordance with AASHTO T 102 using standard naphtha.
3.1 PREPARATION OF SURFACE
Immediately before applying the bituminous coat, remove all loose material, dirt, clay, or other objectionable material from the surface to be treated by means of a power broom or blower supplemented with hand brooms. Apply treatment only when the surface is dry and clean.
3.2 APPLICATION RATE
The exact quantities within the range specified, which may be varied to suit field conditions, will be determined by the Contracting Officer.
3.2.1 Tack Coat
Apply bituminous material for the tack coat in quantities of not less than 0.03 gallons nor more than 0.10 gallons per square yard of residual asphalt onto the pavement surface as approved by the
Contracting Officer. Do not dilute asphalt emulsion when used as a tack coat.
3.2.2 Prime Coat
Apply bituminous material for the prime coat in quantities of not less than0.05 gallons nor more than 0.12 gallons per square yard of residual asphalt for asphalt emulsion up to a 1 to 1 dilution rate or for residual asphalt for cutback asphalt.
3.3 APPLICATION TEMPERATURE
3.3.1 Viscosity Relationship
Apply asphalt at a temperature that will provide a viscosity between 10 and 60 seconds, Saybolt Furol, or between 20 and 120 square mm/sec 20 and 120 centistokes, kinematic. Furnish the temperature viscosity relation to the Contracting Officer.
3.4 General
Following preparation and subsequent inspection of the surface, apply the bituminous prime or tack coat with the bituminous distributor at the specified rate with uniform distribution over the surface to be treated. Properly treat all areas and spots, not capable of being sprayed with the distributor, with the hand spray. Until the succeeding layer of pavement is placed, maintain the surface by protecting the surface against damage and by repairing deficient areas at no additional cost to the Government. If required, spread clean dry sand to effectively blot up any excess bituminous material. No smoking, fires, or flames other than those from the heaters that are a part of the equipment are permitted within 25 feet of heating, distributing, and transferring operations of cutback materials. Prevent all traffic, except for paving equipment used in constructing the surfacing, from using the underlying material, whether primed or not, until the surfacing is completed. The bituminous coat requirements are described herein.
3.4.1 Prime Coat
Apply the bituminous material uniformly over the surface to be treated at a pressure range of 25 to 75 psi; the rate will be as specified above in paragraph APPLICATION RATE. To obtain uniform application of the prime coat on the surface treated at the junction of previous and subsequent applications, spread building paper on the surface for a sufficient distance back from the ends of each application to start and stop the prime coat on the paper and to ensure that all sprayers will operate at full force on the surface to be treated. Immediately after application remove and destroy the building paper.
3.4.2 Tack Coat
Apply tack coat at the locations shown on the drawings. A tack coat should be applied to every bound surface (asphalt or concrete pavement) that is being overlaid with asphalt mixture and at transverse and longitudinal joints. Apply the tack coat when the surface to be treated is clean and dry. Immediately following the preparation of the surface for treatment, apply the bituminous material by means of the bituminous distributor, within the limits of temperature specified herein and at a rate as specified above in paragraph APPLICATION RATE.
Apply the bituminous material so that uniform distribution is obtained over the entire surface to be treated. Treat lightly coated areas and spots missed by the distributor by spraying with a hand wand or using other approved method. Following the application of bituminous material, allow the surface to cure without being disturbed for period of time necessary to permit setting of the tack coat. Apply the bituminous tack coat only as far in advance of the placing of the overlying layer as required for that day's operation.
Maintain and protect the treated surface from damage until the succeeding course of pavement is placed.
3.5 CURING PERIOD
Following application of the bituminous material and prior to application of the succeeding layer of asphalt mixture allow the bituminous coat to cure and water or volatiles to evaporate prior to overlaying. Maintain the tacked surface in good condition until the succeeding layer of pavement is placed, by protecting the surface against damage and by repairing and recoating deficient areas.
3.6 FIELD QUALITY CONTROL
Obtain certificates of compliance for all asphalt material delivered to the project. Obtain samples of the bituminous material under the supervision of the Contracting Officer. The sample may be retained and tested by the Government at no cost to the Contractor.
3.7 SAMPLING AND TESTING
Furnish certified copies of the manufacturer's test reports indicating temperature viscosity relationship for cutback asphalt or asphalt cement, compliance with applicable specified requirements, not less than 5 days before the material is required in the work.
3.7.1 Sampling
Unless otherwise specified, sample bituminous material in accordance with
ASTM D140/D140M.
3.7.2 Calibration Test
Furnish all equipment, materials, and labor necessary to calibrate the bituminous distributor. Calibrate using the approved job material and prior to applying the bituminous coat material to the prepared surface. Calibrate the bituminous distributor in accordance with ASTM D2995.
3.7.3 Trial Applications
Before applying the spray application of tack or prime coat, apply three lengths of at least 100 feet for the full width of the distributor bar to evaluate the amount of bituminous material that can be satisfactorily applied.
3.7.3.1 Tack Coat Trial Application Rate
Unless otherwise authorized, apply the trial application rate of bituminous tack coat materials in the amount of 0.05 gallons per square yard. Make other trial applications using various amounts of material as may be deemed necessary.
3.7.3.2 Prime Coat Trial Application Rate
Unless otherwise authorized, apply the trial application rate of bituminous materials in the amount of 0.15 gallon per square yard. Make other trial applications using various amounts of material as may be deemed necessary.
3.7.4 Sampling and Testing During Construction
Perform quality control sampling and testing as required in paragraph
FIELD QUALITY CONTROL.
3.8 TRAFFIC CONTROLS
Keep traffic off surfaces freshly treated with bituminous material.
Provide sufficient warning signs and barricades so that traffic will not travel over freshly treated surfaces.
SECTION 32 11 23
AGGREGATE BASE COURSES
08/17
PART 1 GENERAL
1.1.1.1 Area
NA
1.1.1.2 Volume
NA
1.1.1.3 Weight
NA
1.1.2 Payment
1.2 REFERENCES
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density
Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm
(18-in.) Drop
AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse
Particles in the Soil Compaction Test
AASHTO T 88 (2013) Standard Method of Test for Particle Size Analysis of Soils
ASTM INTERNATIONAL (ASTM)
ASTM C117 (2017) Standard Test Method for Materials Finer than 75-um (No.
200) Sieve in Mineral Aggregates by Washing
ASTM C127 (2015) Standard Test Method for Density, Relative Density
(Specific Gravity), and Absorption of Coarse Aggregate
ASTM C128 (2015) Standard Test Method for Density, Relative Density
(Specific Gravity), and Absorption of Fine Aggregate
ASTM C131/C131M (2014) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles
Machine
ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and
Coarse Aggregates
ASTM C29/C29M (2017a) Standard Test Method for Bulk Density ("Unit
Weight") and Voids in Aggregate
ASTM C88 (2018) Standard Test Method for Soundness of Aggregates by Use of
Sodium Sulfate or Magnesium Sulfate
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and
Unit Weight of Soil in Place by Sand-Cone Method
ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory
Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the
Rubber Balloon Method
ASTM D2487 (2017) Standard Practice for Classification of Soils for
Engineering Purposes (Unified Soil Classification System)
ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D5821 (2013; R 2017) Standard Test Method for Determining the
Percentage of Fractured Particles in Coarse Aggregate
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water
Content of Soil and
Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates
ASTM E11 (2016) Standard Specification for Woven Wire Test Sieve Cloth and
Test Sieves
1.3 DEFINITIONS
For the purposes of this specification, the following definitions apply.
1.3.1 Aggregate Base Course
Aggregate base course (ABC) is well graded, durable aggregate uniformly moistened and mechanically stabilized by compaction.
1.3.2 Graded-Crushed Aggregate Base Course
Graded-crushed aggregate (GCA) base course is well graded, crushed, durable aggregate uniformly moistened and mechanically stabilized by compaction.
1.3.3 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum laboratory dry density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum dry density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the
19.0 mm 3/4 inch sieve, the degree of compaction for material having more than 30 percent by weight of their particles retained on the 19.0 mm 3/4 inch sieve will be expressed as a percentage of the laboratory maximum dry density in accordance with AASHTO T 180 Method D and corrected with
AASHTO T 224.
1.4 SUBMITTALS
SD-03 Product Data
Plant
SD-06 Test Reports
Initial Tests; In-Place Tests
1.5 EQUIPMENT, TOOLS, AND MACHINES
All plant, equipment, and tools used in the performance of the work will be subject to approval by the Contracting Officer before the work is started.
Maintain all plant, equipment, and tools in satisfactory working condition at all times. Use equipment capable of minimizing segregation, producing the required compaction, meeting grade controls, thickness control, and smoothness requirements as set forth herein.
1.6 QUALITY ASSURANCE
Sampling and testing are the responsibility of the Contractor. Test the materials to establish compliance with the specified requirements and perform testing at the specified frequency. The Contracting Officer may specify the time and location of the tests. Furnish copies of test results to the Contracting Officer within 24 hours of completion of the tests.
1.6.1 Sampling
Take samples for laboratory testing in conformance with ASTM D75/D75M. When deemed necessary, the sampling will be observed by the Contracting Officer.
1.6.2 Tests
1.6.2.1 Sieve Analysis
Perform sieve analysis in conformance with ASTM C117 and ASTM C136/C136M using sieves conforming to ASTM E11.
1.6.2.2 Liquid Limit and Plasticity Index
Determine liquid limit and plasticity index in accordance with ASTM D4318.
1.6.2.3 Moisture-Density Determinations
Determine the laboratory maximum dry density and optimum moisture content in accordance with paragraph DEGREE OF COMPACTION.
1.6.2.4 Field Density Tests
Measure field density in accordance with ASTM D1556/D1556M, ASTM D2167 or
ASTM D6938. For the method presented in ASTM D1556/D1556M use the base plate as shown in the drawing. For the method presented in ASTM D6938 check the calibration curves and adjust them, if necessary, using only the sand cone method as described in paragraph Calibration, of the ASTM publication. Tests performed in accordance with ASTM D6938 result in a wet unit weight of soil and ASTM D6938 will be used to determine the moisture content of the soil. Also check the calibration curves furnished with the moisture gauges along with density calibration checks as described in
ASTM D6938. Make the calibration checks of both the density and moisture gauges using the prepared containers of material method, as described in paragraph Calibration of ASTM D6938, on each different type of material being tested at the beginning of a job and at intervals as directed.
Submit calibration curves and related test results prior to using the device or equipment being calibrated.
1.6.2.5 Wear Test
Perform wear tests on [ABC] [and] [GCA] course material in conformance with
ASTM C131/C131M.
Perform soundness tests on GCA in accordance with ASTM C88.
1.7 ENVIRONMENTAL REQUIREMENTS
Perform construction when the atmospheric temperature is above 35 degrees
F.
PART 2 PRODUCTS
2.1 AGGREGATES
NOTE: Material requirements from State or other local highway agency specifications may be incorporated in contract documents for constructing aggregate base course for roads, streets, or similar use pavements if the following conditions are met:
a. Percentage of material by weight passing the
0.075 mm (No. 200) sieve will not exceed 8.
b. Where local conditions dictate a non-frost-susceptible material, particles passing the 0.02 mm particle size will not exceed 3 percent.
c. Portion of the material passing the 0.425 mm (No. 40) sieve must have a liquid limit not greater than 25 and a plasticity index not greater than 5.
d. Rounded aggregates (such as river-run gravel) will not be allowed since they do not provide sufficient interlocking action to produce the desired strengths and durability.
Provide material consisting of clean, sound, durable particles of crushed stone, crushed gravel, angular sand, or other approved material. The portion retained on the 4.75 mm No. 4 sieve is known as coarse aggregate;
that portion passing the 4.75 mm No. 4 sieve is known as fine aggregate.
When the coarse and fine aggregate is supplied form more than one source, provide aggregate from each source that meets the specified requirements.
2.1.1 Coarse Aggregate
Provide coarse aggregates with angular particles of uniform density.
Separately stockpile coarse aggregate supplied from more than one source.
a. Crushed Gravel: Provide crushed gravel that has been manufactured by crushing gravels and that meets all the requirements specified below.
b. Crushed Stone: Provide crushed stone consisting of freshly mined quarry rock, meeting all the requirements specified below.
NOTE: Verify the subgrade soil contains less than
0.3 percent of sulfates, to prevent expansive ettringite reaction with the recycled concrete. See UFC 3-250-11, Appendix C for testing procedure.
Otherwise, delete recycled concrete option.
Do not permit recycled concrete aggregate (RCA) to be used in a airfield pavement section without evaluating for Alkali-Silica Reactivity (ASR).
See IPRF-01-G-002-03-5, "Evaluation, Design and Construction
Techniques for Airfield Concrete Pavement Used as Recycled Material for
Base." For Air Force projects, perform risk assessment in accordance with
ETL 07-06, "Risk Assessment Procedures for Recycling Portland Cement
Concrete (PCC) Suffering From Alkali-Silica Reaction (ASR) in Airfield
Pavement Structures."
2.1.1.1 Aggregate Base Course
The percentage of loss of ABC coarse aggregate must not exceed 50 percent when tested in accordance with ASTM C131/C131M. Provide aggregate that contains no more than 30 percent flat and elongated particles. A flat particle is one having a ratio of width to thickness greater than 3; an elongated particle is one having a ratio of length to width greater than
3. In the portion retained on each sieve specified, the crushed aggregates must contain at least 50 percent by weight of crushed pieces having two or more freshly fractured faces determined in accordance with
ASTM D5821.
When two fractures are contiguous, the angle between planes of the fractures must be at least 30 degrees in order to count as two fractured faces. Manufacture crushed gravel from gravel particles 50 percent of which, by weight, are retained on the maximum size sieve listed in TABLE 1.
2.1.1.2 Graded-Crushed Aggregate Base Course
The percentage of loss of GCA coarse aggregate must not exceed 40 percent loss when tested in accordance with ASTM C131/C131M. Provide GCA coarse aggregate that does not exhibit a loss greater than 18 percent weighted average, at five cycles, when tested for soundness in magnesium sulfate, or
12 percent weighted average, at five cycles, when tested in sodium sulfate in accordance with ASTM C88. Provide aggregate that contains no more than
20 percent flat and elongated particles for the fraction retained on the
1/2 inch sieve nor 20 percent for the fraction passing the 1/2 inch sieve.
A flat particle is one having a ratio of width to thickness greater than 3;
an elongated particle is one having a ratio of length to width greater than
3. In the portion retained on each sieve specified, the crushed aggregate must contain at least 90 percent by weight of crushed pieces having two or more freshly fractured faces determined in accordance with ASTM D5821.
2.1.2 Fine Aggregate
Provide fine aggregates consisting of angular particles of uniform density.
2.1.2.1 Aggregate Base Course
Provide ABC fine aggregate that consists of screenings, angular sand, crushed recycled concrete fines, or other finely divided mineral matter processed or naturally combined with the coarse aggregate.
2.1.3 Gradation Requirements
Apply the specified gradation requirements to the completed base course.
Provide aggregates that are continuously well graded within the limits specified in TABLE 1. Use sieves that conform to ASTM E11.
TABLE 1. GRADATION OF AGGREGATES
Percentage by Weight Passing Square-Mesh Sieve
Sieve
TABLE 1. GRADATION OF AGGREGATES
Percentage by Weight Passing Square-Mesh Sieve
Designation No. 1 No. 2 No. 3
2 inch 100 ---- ----
1-1/2 inch 70-100 100 ----
1 inch 45-80 60-100 100
1/2 inch 30-60 30-65 40-70
No. 4 20-50 20-50 20-50
No. 10 15-40 15-40 15-40
Sieve
TABLE 1. GRADATION OF AGGREGATES
Percentage by Weight Passing Square-Mesh Sieve
Designation No. 1 No. 2 No. 3
No. 40 5-25 5-25 5-25
No. 200 0-8 0-8 0-8
NOTE 1: Particles having diameters less than 0.02 mm must not be in excess of 3 percent by weight of the total sample tested as determined in accordance with AASHTO T 88.
NOTE 2: The values are based on aggregates of uniform specific gravity.
If materials from different sources are used for the coarse and fine aggregates, test the materials in accordance with ASTM C127 and ASTM C128 to determine their specific gravities. Correct the percentages passing the various sieves as directed by the Contracting Officer if the specific gravities vary by more than 10 percent.
2.2 LIQUID LIMIT AND PLASTICITY INDEX
Apply liquid limit and plasticity index requirements to the completed course and to any component that is blended to meet the required gradation. The portion of any component or of the completed course passing the No. 40 sieve must be either nonplastic or have a liquid limit not greater than 25 and a plasticity index not greater than 5.
2.3 TESTS, INSPECTIONS, AND VERIFICATIONS
2.3.1 Initial Tests
Perform one of each of the following tests, on the proposed material prior to commencing construction, to demonstrate that the proposed material meets all specified requirements when furnished. Complete this testing for each source if materials from more than one source are proposed.
a. Sieve Analysis [including 0.02 mm material].
b. Liquid limit and plasticity index.
c. Moisture-density relationship.
d. Wear.
2.3.2 Approval of Material
Tentative approval of material will be based on initial test results.
PART 3 EXECUTION
3.4 PREPARATION OF UNDERLYING COURSE OR SUBGRADE
Clean the underlying course or subgrade of all foreign substances prior to constructing the base course(s). Construct the surface of the underlying course or subgrade to meet specified compaction and surface tolerances.
Correct ruts or soft yielding spots in the underlying courses, areas having inadequate compaction, and deviations of the surface from the specified requirements set forth herein by loosening and removing soft or unsatisfactory material and adding approved material, reshaping to line and grade, and recompacting to specified density requirements. Do not allow traffic or other operations to disturb the finished underlying course and maintain in a satisfactory condition until the base course is placed.
3.5 GRADE CONTROL
Provide a finished and completed base course conforming to the lines, grades, and cross sections shown.