Attachment-2_Performance Requirements Summary (PRS)(REVISED)_W911RX-21-Q-0006.pdf

PDF 124 KB Posted

Attached to
1ID Equipment Disinfection Federal contract opportunity
Solicitation number
Amendment-1_W911RX-21-Q-0006
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Hood

View the file

Other files for this federal contract opportunity

Other files attached to 1ID Equipment Disinfection, newest first.
File Type Posted
Amendment-1_Solicitation (RFQ)_W911RX-21-Q-0006.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment-2

Performance Requirements Summary

The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Paragraph Number

Standard Acceptable Quality Level

(AQL)

Method of Surveillance

Proportion of Service to Contract

Price The Contractor shall perform verification that correct measurements Virkon-S is followed and a log is kept for random inspection

5.10 1% Solution No deviation from standard is acceptable

100% surveillance

Deduct 3% of line item cost if inspection results in failed ratio.

Apply Virkon-S 1% solution on equipment

5.11.1 All external

surfaces of equipment

No deviation from standard is acceptable if inspections results in failed inspection.

Contractor shall Allow 10 minute drying time immediately following the application of Vikron-S Solution

5.11 10 minute dry time No deviation from standard is acceptable if allotted dry time is < 10 minutes.

Contractor shall contain, collect and dispose of hazardous and nonhazardous waste and residues

5.12 Federal, Kansas, local & Fort Riley Environmental laws and regulations.

Clean Water Act

No deviation from standard is acceptable if inspections results in shut down by Environmental Professionals.

File details come from the government source that posted it. Updated .