Attachment 2 - Final Drawing Set.pdf

PDF 11 MB Posted

Attached to
Install Steam Boilers, B106 Federal contract opportunity
Solicitation number
FA875122B0004
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document outlines a federal contract opportunity for the installation of steam boilers at an Air Force research laboratory. The contractor will be required to provide all labor, equipment, and materials to install steam boilers in Building 106 at the Air Force Research Laboratory Rome Research Site in Rome, New York. The work must be performed in accordance with the specifications in Attachment 1 and drawings in Attachment 2. The contract will be awarded as a firm fixed price contract through a competitive invitation for bid process. Bids are due approximately 30 days after the solicitation is posted on May 27, 2022 at SAM.gov under reference number FA875122B0004. Interested vendors must register at SAM.gov by the response date. The estimated value of the construction is between $1 million and $5 million. The winning bidder must be registered in SAM.gov and WAWF and will be required to provide payment and performance bonds equal to the bid amount. The Department of the Air Force Materiel Command Research Laboratory is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Install Steam Boilers, B106, newest first.
File Type Posted
Attachment 1 - Final Spec.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABCDEFGHJKLMNOPQRST

CORRIDOR "F"

E A

S T

C

O R

R I D

O R

2a

2b

C1

Y X

8WF31

W

F

W F

8WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF31

W

F

W F

W

F

W

F

10WF4910WF4910WF4910WF4910WF49

W

F

W F

W

F

W

F

W F

W

F

A1F1H1

S1T1UU1U2V

H2

W

6W20

6W206W20

6W20

6W20

6W20

W

W

W

W

W

W

S t a i r

S t a i r

C C

C C

C C

C

C C

C

C

F137

F152

F152A

F133

F131

F129

F132

F134

F136

F102

F109

F103

F122

F122A F136A

A' B' C' D' E' F' G'

8'

7'

6'

3'

1'

LIFT

F152D

STEAM

PIT

F152B

F152C

E

ABE

C C

C

EC

EC

EC

EC

EC EC

1 .2

E

F153

F153A

F153C

F153B

F152F

855 SF

1771 SF

2077 SF

4384 SF

1A

3A

1A

1A

4A

1A

4A

10A

1A

9A

106-5

E F109A

1 1846

F122B

F142

F-CORRIDOR

F143

F141

BEA

F137A

F144

MAIN CONF.

ROOM

SERVER

ROOM

OFFICE

W

F

W F

W

F

W

F

W F

8WF318WF31

W

F

W

F

36x72 x

36x72 x

36x72 x

A3-T

AT-O

DFC/OPS

1.1

1.2

1.3

1.4

J

8WF31

H

8WF31

G F

8WF31 8WF31

E

8WF31

D

8WF31

C

8WF31

B A

8WF31

W

F

H2

H1

C1

F242

F

A B C D E F G

EC

E

RIOS

4 PC TECHS/PRE-PROD

2 PROGRAM MGRS

MECH

240 SF

RIO DIVISION

SUITE

DEPUTY

DIVISION

CHIEF

275SF

WAITING

AREA

Gail

ADMIN

120SF

STORAGE/PRINTER-COPIER

AREA

OFFICE

FOR 4

OFFICE

FOR 2

13'20'

21'-6"

27'-4"

21'-6"

14'-4"

19'

10'

12'

10'-4"15'

29'-6"

ASBESTOS MATERIAL REMOVAL SCHEDULE

LEGEND MATERIAL DESCRIPTION APPROXIMATE QUANTITY

ASBESTOS CONTAINING PIPE AND PIPE FITTINGS ON

FIBERGLASS INSULATED LINES 17 FITTINGS

ASBESTOS CONTAINING BLACK ROOF FLASHING MATERIAL 3 SF

ASBESTOS REMOVAL AREAS

GENERAL NOTES - ASBESTOS REMOVAL:

THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE WITH THE CONTRACT

SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO SPECIFICATION NUMBER 028200, NEW YORK STATE DEPARTMENT OF LABOR (N.Y.S.D.O.L.) INDUSTRIAL CODE RULE 56, OSHA, NESHAPS, AHERA AND ALL OTHER

APPLICABLE CODES.

THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR HAZARDOUS MATERIAL

REMOVAL (ACM OR OTHERWISE), AND SHALL EMPLOY NYSDOL CERTIFIED EMPLOYEES.

THE CONTRACTOR SHALL COORDINATE ALL WORK INCLUDING ASBESTOS REMOVAL WITH OTHER

CONTRACTORS, IF APPLICABLE, AND CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE.

ABATEMENT CONTRACTOR SHALL RECEIVE PROJECT MONITOR/CONTRACTING OFFICER OR

DESIGNATED GOVERNMENT REPRESENTATIVE APPROVAL BEFORE ANY ABATEMENT IS UNDERTAKEN.

THE CONTRACTOR SHALL MAINTAIN SECURITY IN THE BUILDING AND WORK AREAS AT ALL TIMES.

ASBESTOS WASTE DUMPSTER LOCATION IS TO BE COORDINATED WITH THE CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE. ALL WASTE SHALL BE TRANSPORTED IN A POLYETHYLENE

SHEETING LINED AND COVERED CART.

INTERRUPTION OF HEAT AND ELECTRICAL SERVICES MAY EXIST IN ABATEMENT AREAS.

COORDINATE SHUT DOWN AND LOCK OUT OF ELECTRIC POWER WITH THE ELECTRICAL CONTRACTOR AND CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE. THE ABATEMENT CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND LIGHTING TO CONDUCT THEIR WORK. ALL TEMPORARY POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE WORK AREA THROUGH A GROUND-FAULT CIRCUIT

INTERRUPTER AT THE SOURCE.

COORDINATE HOOK-UP OF WATER SERVICE FOR DECONTAMINATION PURPOSES WITH THE

CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE. WATER FOR THE

DECONTAMINATED UNITS IS AVAILABLE ON-SITE FROM THE CONTRACTING OFFICER OR DESIGNATED

GOVERNMENT REPRESENTATIVE.

ALL FURNITURE, OTHER READILY MOVABLE ITEMS INCLUDING DOORS AND NON-AC ITEMS, IF

PRESENT SHALL BE REMOVED BY THE CONTRACTOR PRIOR TO ABATEMENT WORK FOR NON ACM

DISPOSAL.

HEPA VACUUM EXISTING NON-MOVABLE EQUIPMENT PRIOR TO COVERING WITH PROTECTIVE

SHEETING.

UNDER NO CIRCUMSTANCES SHALL CONTAMINATED LIQUIDS OR DEBRIS ENTER THE EXISTING

SEWER/SEPTIC SYSTEM. ALL WASTEWATER SHALL BE FILTERED THROUGH A SYSTEM WITH AT LEAST 5.0

MICRON PARTICLE SIZE COLLECTION CAPABILITY.

NYSDOL AIR MONITORING IS THE RESPONSIBILITY OF THE GOVERNMENT (1 WEEKS ALLOTTED). OSHA AIR

MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR.

REPRESENTATIVE. FOR REQUIRED WATER SHUT-OFF AND DISCONNECTS PRIOR TO PLUMBING FIXTURE

REMOVALS.

CONTRACTOR SHALL PROVIDE POWERED AIR SUPPLY RESPIRATORS TO THE OWNER, IF REQUESTED, TO ACCESS

ANY WORK AREAS AS NEEDED.

ITEMS TO BE ABATED/REMOVED INCLUDE, BUT ARE NOT LIMITED TO: MUD PIPE FITTING INSULATION ON

FIBERGLASS PIPE INSULATION RUNS AND ROOF TAR.

BUILDING DEMOLITION/ABATEMENT ACTIVITIES WILL OCCUR ONLY AFTER OCCUPANTS HAVE BEEN RELOCATED

TO ANOTHER FACILITY.

FRIABLE ASBESTOS CONTAINING MATERIALS MUST BE REMOVED FIRST, DURING THE ABATEMENT.

INCIDENTAL DISTURBANCES, DUE TO CONTRACTOR NEGLIGENCE, WILL BE THE RESPONSIBILITY OF THE

CONTRACTOR TO REMEDIATE IN FULL, IN ACCORDANCE WITH ALL APPLICABLE CODES.

CONTRACTING OFFICER/GOVERNMENT REPRESENTATIVE WILL BE IMMEDIATELY NOTIFIED FOR ANY SAFETY, OCCUPATIONAL HEALTH OR ENVIRONMENTAL ISSUES DURING SCOPE OF THIS WORK.

ALL WASTE MUST BE TRANSPORTED OFFSITE AND DISPOSED OF AT THE PROPER LANDFILL, APPROVED BY

CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE.

CONTRACTOR MUST SPECIFY ANY VARIANCES ANTICIPATED TO BE USED FOR APPROVAL. CONTRACTOR REQUIRED TO SHOW PROOF OF AN APPROVED VARIENCE BY NYSDOL, SIMILAR IN SCOPE TO PROJECT, WITHIN

THE LAST THREE YEARS.

AIR MONITORING IS BASED ON AN ANTICIPATED ONE-WEEK ABATEMENT TIMEFRAME, ANYTHING

ADDITIONAL WILL BE AT THE CONTRACTOR'S EXPENSE. BIDDING SHALL REFLECT APPROPRIATE CONTRACTOR

TEAM TO COMPLETE IN ALLOTTED TIMEFRAME.

EXISTING DRAWINGS ARE AVAILABLE FOR REVIEW. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS

(STRUCTURAL, HAZ MATERIALS OR OTHERWISE) PRIOR TO BIDDING.

VARIATIONS (±20%) IN QUANTITIES AND LOCATIONS OF HAZ MATERIALS (ACM or OTHERWISE INDICATED) ARE CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND TIME OF THIS CONTRACT. QUANTITIES SHOWN ARE FOR INFORMATION ONLY AND SHALL BE USED AS A GUIDELINE. AT MINIMUM, MATERIALS IDENTIFIED ON DRAWINGS ARE TO BE REMOVED AND PROPERLY DISPOSED. REFER TO THE ASBESTOS, LEAD AND PCB

SAMPLING REPORT FOR FURTHER/SUPPORTING INFORMATION.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE BUILDING, BUILDING STRUCTURE/COMPONENTS, SYSTEMS/EQUIPMENT, THAT ARE CONSEQUENTLY DAMAGED AS A

RESULT OF THE CONTRACTOR'S WORK.

PIPE INSULATION.ROOF TAR.

9 SF

ALD DAM

JAN. 15, 2022

8WF31

8W F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

C

480-208 Trans 112.4kva

CAB 1 CAB 2

Unit #1

TRANSUPS

MBP

SWITCH ELVDP

PANEL

BATTERIES

ELVDP

PANEL

CUMMINS

TRANSFER

SWITCH

Liebert

DATA

AIRE

Richard Childres

Jay Marchesani 3A

Tabith Haggart

Jerry Kalka

Cody Owens Andrey Selyuzhitskiy

Ashley Wielzerzak

F142

F-CORRIDOR

F143F141

BREAK

ROOM

F137A

F144

MAIN CONF.

ROOM

SERVER

ROOM

OFFICE

REFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

8WF31 8WF31 8WF31 8WF31 8WF31

8WF31

8W F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

C

480-208 Trans 112.4kva

CAB 1 CAB 2

TRANSUPS

MBP

SWITCH ELVDP

PANEL

BATTERIES

ELVDP

PANEL

CUMMINS

TRANSFER

SWITCH

855 SF

Richard Childres

Jay Marchesani 3A

Tabith Haggart

Jerry Kalka

Cody Owens Andrey Selyuzhitskiy

Ashley Wielzerzak

F142

F-CORRIDOR

F143F141

BREAK

ROOM

F137A

F144

MAIN CONF.

ROOM

SERVER

ROOM

OFFICE

REFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

8WF318WF318WF318WF318WF31

REFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

A B

8WF31 8WF31 8WF31 8WF31

G

1.1

1.2

1.3

1.4 7'

6'

3'

1'

8WF31

8W F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

480-208 Trans 112.4kva

CAB 1 CAB 2

TRANSUPS

MBP

SWITCH ELVDP

PANEL

BATTERIES

ELVDP

PANEL

CUMMINS

TRANSFER

SWITCH

EFG

8W

F3

8W F3

8W

F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

A

B

CONFINED SPACE

106O

A' B' C' D' E' F' G'

C B A

1.1

1.2

1.3

1.4 7'

6'

3'

1'

8WF31

8W F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

480-208 Trans 112.4kva

CAB 1 CAB 2

TRANSUPS

MBP

SWITCH ELVDP

PANEL

BATTERIES

ELVDP

PANEL

CUMMINS

TRANSFER

SWITCH

EFG

8W

F3

8W F3

8W

F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

A

B

A' B' C' D' E' F' G'

C B A

NN

8WF31 8WF31 8WF31 8WF31

10WF49

10WF49

10WF49

10WF49

10WF49 10WF49

8WF31 8WF31 8WF31

8W F3

8W F3

8W F3

8W F3

8W F3

8W F3

8WF31

8W F3

8W F3

8W F3

8WF31

5W16 5W16

5W16

5W

5W

5W

5W

5W

Drawing tablePlotterA

LI

G N

White board

Projection screen

Drawing table

Drawing storage

Visiting

CSI-B

Plotter

White board White board

8WF31 8WF31

8W F3

T S R Q P O N M L K J H GW V U

1.1

1.2

8WF31

8W F3

8WF31 8WF31

8W F3

8W F3

8W F3

8WF31 8WF31 8WF31 8WF31 8WF31 8WF31

10WF49 10WF49

8WF31 8WF31 8WF31 8WF31 8WF31

10WF49 10WF49

6W25 6W25 6W25 6W25 6W25

6W

6W

6W

6W

6W

6W

6W25 6W25 6W25

5W16

6W25

5W16

Li eb er t

DN

T S R QW V U

8WF318WF318WF318WF31

8W F3

8W F3

8W F3

8W F3

8W F3

8W F3

8W F3

8W F3

10WF49

10WF49

10WF49

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

6W20

6W20

6W20

6W20

8WF31

8WF31

8WF31

8WF31 8WF31

T S R QW V U

8WF318WF318WF318WF31

8W F3

8W F3

8W F3

8W F3

8W F3

8W F3

8W F3

8W F3

10WF49

10WF49

10WF49

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

8W F1

6W20

6W20

6W20

6W20

8WF31

8WF31

8WF31 8WF31

8WF318WF318WF318WF318WF318WF31

CHILLER PAD

CHILLER PAD

CH-1

CH-2

8W F3

8W F3

8W F3

8W F3

8W F3

8WF318WF31

8W F3

8W F3

8WF318WF318WF318WF318WF318WF31

CHILLER PAD

CHILLER PAD

CH-1

CH-2

8W F3

8W F3

8W F3

8W F3

8W F3

8WF318WF31

8W F3

8W F3

A C D E

F3

8W

F3

8WF318WF318WF318WF318WF31

8W F3

10WF49

5W

5W

5W

5W

5W

5W

480-208 Trans 112.4kva

CAB 1 CAB 2

TRANSUPS

MBP

SWITCH ELVDP

PANEL

BATTERIES

ELVDP

PANEL

CUMMINS

TRANSFER

SWITCH

REFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

E F G

F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

480-208 Trans 112.4kva

CAB 1 CAB 2

TRANSUPS

MBP

SWITCH ELVDP

PANEL

BATTERIES

ELVDP

PANEL

CUMMINS

TRANSFER

SWITCH

REFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

G

E F G

1.1

1.2

1.3

1.4

A' B' C' D' E' F' G'

8'

7'

6'

3'

1'

8WF31

8W F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

C

855 SF

3A

A

A

EFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

G

1.1

1.2

1.3

1.4

A' B' C' D' E' F' G'

8'

7'

6'

3'

1'

8WF31

8W F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

C

A

EFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W

1.1

1.2

1.3

1.4

A' B' C' D' E' F' G'

8'

7'

6'

3'

1'

8WF31

8W F3

8W

F3

8WF318WF318WF318WF318WF318WF31

8W F3

10WF4910WF49

5W

5W

5W

5W

5W

5W

C

A

EFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W F3

G

1.1

1.2

1.3

1.4

A' B' C' D' E' F' G'

8'

7'

6'

3'

1'

8WF31

8W F3

8W

F3

8W F3

8W

F3

8W F3

8W

F3

8W F3

8WF318WF318WF318WF318WF318WF31

8WF31

8W F3

10WF49

10WF49

10WF49

10WF49

5W16

5W16

5W

5W

5W

5W

5W16

5W16

5W

5W

W 6x

W

6x

W 6x

W

6x

W 6x

W 6x

W

6x

W 6x

W

6x

W 6x

W 6x

W

6x

W 6x

W 6x

W 6x

W

6x

W 6x

W 6x

W 6x

W 6x

W 6x

W 6x

A

EFG

8W F3

8W

F3

8W F3

8W F3

8W

F3

8WF318WF31

8W F3

8W

3904-00 Cover
3904-01 AR-1
Sheets and Views
AR-1
3904-02 A-1
3904-03 A-2
3904-04 ME-1
3904-05 H-1
3904-06 H-2
3904-07 H-3
3904-08 H-4
3904-09 H-5
3904-10 H-6
3904-11 H-7
3904-12 H-8
3904-13 H-9
3904-14 H-10
3904-15 P-1
3904-16 P-2
3904-17 FP-1
3904-18 E-1
3904-19 E-2

File details come from the government source that posted it. Updated .