Attachment 2 - Final Drawing Set.pdf
PDF 11 MB Posted
- Attached to
- Install Steam Boilers, B106 Federal contract opportunity
- Solicitation number
- FA875122B0004
About this file
This document outlines a federal contract opportunity for the installation of steam boilers at an Air Force research laboratory. The contractor will be required to provide all labor, equipment, and materials to install steam boilers in Building 106 at the Air Force Research Laboratory Rome Research Site in Rome, New York. The work must be performed in accordance with the specifications in Attachment 1 and drawings in Attachment 2. The contract will be awarded as a firm fixed price contract through a competitive invitation for bid process. Bids are due approximately 30 days after the solicitation is posted on May 27, 2022 at SAM.gov under reference number FA875122B0004. Interested vendors must register at SAM.gov by the response date. The estimated value of the construction is between $1 million and $5 million. The winning bidder must be registered in SAM.gov and WAWF and will be required to provide payment and performance bonds equal to the bid amount. The Department of the Air Force Materiel Command Research Laboratory is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Final Spec.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABCDEFGHJKLMNOPQRST
CORRIDOR "F"
E A
S T
C
O R
R I D
O R
2a
2b
C1
Y X
8WF31
W
F
W F
8WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF318WF31
W
F
W F
W
F
W
F
10WF4910WF4910WF4910WF4910WF49
W
F
W F
W
F
W
F
W F
W
F
A1F1H1
S1T1UU1U2V
H2
W
6W20
6W206W20
6W20
6W20
6W20
W
W
W
W
W
W
S t a i r
S t a i r
C C
C C
C C
C
C C
C
C
F137
F152
F152A
F133
F131
F129
F132
F134
F136
F102
F109
F103
F122
F122A F136A
A' B' C' D' E' F' G'
8'
7'
6'
3'
1'
LIFT
F152D
STEAM
PIT
F152B
F152C
E
ABE
C C
C
EC
EC
EC
EC
EC EC
1 .2
E
F153
F153A
F153C
F153B
F152F
855 SF
1771 SF
2077 SF
4384 SF
1A
3A
1A
1A
4A
1A
4A
10A
1A
9A
106-5
E F109A
1 1846
F122B
F142
F-CORRIDOR
F143
F141
BEA
F137A
F144
MAIN CONF.
ROOM
SERVER
ROOM
OFFICE
W
F
W F
W
F
W
F
W F
8WF318WF31
W
F
W
F
36x72 x
36x72 x
36x72 x
A3-T
AT-O
DFC/OPS
1.1
1.2
1.3
1.4
J
8WF31
H
8WF31
G F
8WF31 8WF31
E
8WF31
D
8WF31
C
8WF31
B A
8WF31
W
F
H2
H1
C1
F242
F
A B C D E F G
EC
E
RIOS
4 PC TECHS/PRE-PROD
2 PROGRAM MGRS
MECH
240 SF
RIO DIVISION
SUITE
DEPUTY
DIVISION
CHIEF
275SF
WAITING
AREA
Gail
ADMIN
120SF
STORAGE/PRINTER-COPIER
AREA
OFFICE
FOR 4
OFFICE
FOR 2
13'20'
21'-6"
27'-4"
21'-6"
14'-4"
19'
10'
12'
10'-4"15'
29'-6"
ASBESTOS MATERIAL REMOVAL SCHEDULE
LEGEND MATERIAL DESCRIPTION APPROXIMATE QUANTITY
ASBESTOS CONTAINING PIPE AND PIPE FITTINGS ON
FIBERGLASS INSULATED LINES 17 FITTINGS
ASBESTOS CONTAINING BLACK ROOF FLASHING MATERIAL 3 SF
ASBESTOS REMOVAL AREAS
GENERAL NOTES - ASBESTOS REMOVAL:
THE CONTRACTOR SHALL PERFORM ALL CONTRACT WORK IN ACCORDANCE WITH THE CONTRACT
SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO SPECIFICATION NUMBER 028200, NEW YORK STATE DEPARTMENT OF LABOR (N.Y.S.D.O.L.) INDUSTRIAL CODE RULE 56, OSHA, NESHAPS, AHERA AND ALL OTHER
APPLICABLE CODES.
THE CONTRACTOR SHALL HOLD A CURRENT LICENSE IN THE STATE OF NEW YORK FOR HAZARDOUS MATERIAL
REMOVAL (ACM OR OTHERWISE), AND SHALL EMPLOY NYSDOL CERTIFIED EMPLOYEES.
THE CONTRACTOR SHALL COORDINATE ALL WORK INCLUDING ASBESTOS REMOVAL WITH OTHER
CONTRACTORS, IF APPLICABLE, AND CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE.
ABATEMENT CONTRACTOR SHALL RECEIVE PROJECT MONITOR/CONTRACTING OFFICER OR
DESIGNATED GOVERNMENT REPRESENTATIVE APPROVAL BEFORE ANY ABATEMENT IS UNDERTAKEN.
THE CONTRACTOR SHALL MAINTAIN SECURITY IN THE BUILDING AND WORK AREAS AT ALL TIMES.
ASBESTOS WASTE DUMPSTER LOCATION IS TO BE COORDINATED WITH THE CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE. ALL WASTE SHALL BE TRANSPORTED IN A POLYETHYLENE
SHEETING LINED AND COVERED CART.
INTERRUPTION OF HEAT AND ELECTRICAL SERVICES MAY EXIST IN ABATEMENT AREAS.
COORDINATE SHUT DOWN AND LOCK OUT OF ELECTRIC POWER WITH THE ELECTRICAL CONTRACTOR AND CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE. THE ABATEMENT CONTRACTOR SHALL PROVIDE TEMPORARY POWER AND LIGHTING TO CONDUCT THEIR WORK. ALL TEMPORARY POWER TO THE WORK AREA SHALL BE BROUGHT IN FROM OUTSIDE THE WORK AREA THROUGH A GROUND-FAULT CIRCUIT
INTERRUPTER AT THE SOURCE.
COORDINATE HOOK-UP OF WATER SERVICE FOR DECONTAMINATION PURPOSES WITH THE
CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE. WATER FOR THE
DECONTAMINATED UNITS IS AVAILABLE ON-SITE FROM THE CONTRACTING OFFICER OR DESIGNATED
GOVERNMENT REPRESENTATIVE.
ALL FURNITURE, OTHER READILY MOVABLE ITEMS INCLUDING DOORS AND NON-AC ITEMS, IF
PRESENT SHALL BE REMOVED BY THE CONTRACTOR PRIOR TO ABATEMENT WORK FOR NON ACM
DISPOSAL.
HEPA VACUUM EXISTING NON-MOVABLE EQUIPMENT PRIOR TO COVERING WITH PROTECTIVE
SHEETING.
UNDER NO CIRCUMSTANCES SHALL CONTAMINATED LIQUIDS OR DEBRIS ENTER THE EXISTING
SEWER/SEPTIC SYSTEM. ALL WASTEWATER SHALL BE FILTERED THROUGH A SYSTEM WITH AT LEAST 5.0
MICRON PARTICLE SIZE COLLECTION CAPABILITY.
NYSDOL AIR MONITORING IS THE RESPONSIBILITY OF THE GOVERNMENT (1 WEEKS ALLOTTED). OSHA AIR
MONITORING IS THE RESPONSIBILITY OF THE CONTRACTOR.
REPRESENTATIVE. FOR REQUIRED WATER SHUT-OFF AND DISCONNECTS PRIOR TO PLUMBING FIXTURE
REMOVALS.
CONTRACTOR SHALL PROVIDE POWERED AIR SUPPLY RESPIRATORS TO THE OWNER, IF REQUESTED, TO ACCESS
ANY WORK AREAS AS NEEDED.
ITEMS TO BE ABATED/REMOVED INCLUDE, BUT ARE NOT LIMITED TO: MUD PIPE FITTING INSULATION ON
FIBERGLASS PIPE INSULATION RUNS AND ROOF TAR.
BUILDING DEMOLITION/ABATEMENT ACTIVITIES WILL OCCUR ONLY AFTER OCCUPANTS HAVE BEEN RELOCATED
TO ANOTHER FACILITY.
FRIABLE ASBESTOS CONTAINING MATERIALS MUST BE REMOVED FIRST, DURING THE ABATEMENT.
INCIDENTAL DISTURBANCES, DUE TO CONTRACTOR NEGLIGENCE, WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR TO REMEDIATE IN FULL, IN ACCORDANCE WITH ALL APPLICABLE CODES.
CONTRACTING OFFICER/GOVERNMENT REPRESENTATIVE WILL BE IMMEDIATELY NOTIFIED FOR ANY SAFETY, OCCUPATIONAL HEALTH OR ENVIRONMENTAL ISSUES DURING SCOPE OF THIS WORK.
ALL WASTE MUST BE TRANSPORTED OFFSITE AND DISPOSED OF AT THE PROPER LANDFILL, APPROVED BY
CONTRACTING OFFICER OR DESIGNATED GOVERNMENT REPRESENTATIVE.
CONTRACTOR MUST SPECIFY ANY VARIANCES ANTICIPATED TO BE USED FOR APPROVAL. CONTRACTOR REQUIRED TO SHOW PROOF OF AN APPROVED VARIENCE BY NYSDOL, SIMILAR IN SCOPE TO PROJECT, WITHIN
THE LAST THREE YEARS.
AIR MONITORING IS BASED ON AN ANTICIPATED ONE-WEEK ABATEMENT TIMEFRAME, ANYTHING
ADDITIONAL WILL BE AT THE CONTRACTOR'S EXPENSE. BIDDING SHALL REFLECT APPROPRIATE CONTRACTOR
TEAM TO COMPLETE IN ALLOTTED TIMEFRAME.
EXISTING DRAWINGS ARE AVAILABLE FOR REVIEW. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS
(STRUCTURAL, HAZ MATERIALS OR OTHERWISE) PRIOR TO BIDDING.
VARIATIONS (±20%) IN QUANTITIES AND LOCATIONS OF HAZ MATERIALS (ACM or OTHERWISE INDICATED) ARE CONSIDERED AS HAVING NO IMPACT ON CONTRACT PRICE AND TIME OF THIS CONTRACT. QUANTITIES SHOWN ARE FOR INFORMATION ONLY AND SHALL BE USED AS A GUIDELINE. AT MINIMUM, MATERIALS IDENTIFIED ON DRAWINGS ARE TO BE REMOVED AND PROPERLY DISPOSED. REFER TO THE ASBESTOS, LEAD AND PCB
SAMPLING REPORT FOR FURTHER/SUPPORTING INFORMATION.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACEMENT OR REPAIR OF ANY DAMAGES TO THE BUILDING, BUILDING STRUCTURE/COMPONENTS, SYSTEMS/EQUIPMENT, THAT ARE CONSEQUENTLY DAMAGED AS A
RESULT OF THE CONTRACTOR'S WORK.
PIPE INSULATION.ROOF TAR.
9 SF
ALD DAM
JAN. 15, 2022
8WF31
8W F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
C
480-208 Trans 112.4kva
CAB 1 CAB 2
Unit #1
TRANSUPS
MBP
SWITCH ELVDP
PANEL
BATTERIES
ELVDP
PANEL
CUMMINS
TRANSFER
SWITCH
Liebert
DATA
AIRE
Richard Childres
Jay Marchesani 3A
Tabith Haggart
Jerry Kalka
Cody Owens Andrey Selyuzhitskiy
Ashley Wielzerzak
F142
F-CORRIDOR
F143F141
BREAK
ROOM
F137A
F144
MAIN CONF.
ROOM
SERVER
ROOM
OFFICE
REFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
8WF31 8WF31 8WF31 8WF31 8WF31
8WF31
8W F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
C
480-208 Trans 112.4kva
CAB 1 CAB 2
TRANSUPS
MBP
SWITCH ELVDP
PANEL
BATTERIES
ELVDP
PANEL
CUMMINS
TRANSFER
SWITCH
855 SF
Richard Childres
Jay Marchesani 3A
Tabith Haggart
Jerry Kalka
Cody Owens Andrey Selyuzhitskiy
Ashley Wielzerzak
F142
F-CORRIDOR
F143F141
BREAK
ROOM
F137A
F144
MAIN CONF.
ROOM
SERVER
ROOM
OFFICE
REFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
8WF318WF318WF318WF318WF31
REFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
A B
8WF31 8WF31 8WF31 8WF31
G
1.1
1.2
1.3
1.4 7'
6'
3'
1'
8WF31
8W F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
480-208 Trans 112.4kva
CAB 1 CAB 2
TRANSUPS
MBP
SWITCH ELVDP
PANEL
BATTERIES
ELVDP
PANEL
CUMMINS
TRANSFER
SWITCH
EFG
8W
F3
8W F3
8W
F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
A
B
CONFINED SPACE
106O
A' B' C' D' E' F' G'
C B A
1.1
1.2
1.3
1.4 7'
6'
3'
1'
8WF31
8W F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
480-208 Trans 112.4kva
CAB 1 CAB 2
TRANSUPS
MBP
SWITCH ELVDP
PANEL
BATTERIES
ELVDP
PANEL
CUMMINS
TRANSFER
SWITCH
EFG
8W
F3
8W F3
8W
F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
A
B
A' B' C' D' E' F' G'
C B A
NN
8WF31 8WF31 8WF31 8WF31
10WF49
10WF49
10WF49
10WF49
10WF49 10WF49
8WF31 8WF31 8WF31
8W F3
8W F3
8W F3
8W F3
8W F3
8W F3
8WF31
8W F3
8W F3
8W F3
8WF31
5W16 5W16
5W16
5W
5W
5W
5W
5W
Drawing tablePlotterA
LI
G N
White board
Projection screen
Drawing table
Drawing storage
Visiting
CSI-B
Plotter
White board White board
8WF31 8WF31
8W F3
T S R Q P O N M L K J H GW V U
1.1
1.2
8WF31
8W F3
8WF31 8WF31
8W F3
8W F3
8W F3
8WF31 8WF31 8WF31 8WF31 8WF31 8WF31
10WF49 10WF49
8WF31 8WF31 8WF31 8WF31 8WF31
10WF49 10WF49
6W25 6W25 6W25 6W25 6W25
6W
6W
6W
6W
6W
6W
6W25 6W25 6W25
5W16
6W25
5W16
Li eb er t
DN
T S R QW V U
8WF318WF318WF318WF31
8W F3
8W F3
8W F3
8W F3
8W F3
8W F3
8W F3
8W F3
10WF49
10WF49
10WF49
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
6W20
6W20
6W20
6W20
8WF31
8WF31
8WF31
8WF31 8WF31
T S R QW V U
8WF318WF318WF318WF31
8W F3
8W F3
8W F3
8W F3
8W F3
8W F3
8W F3
8W F3
10WF49
10WF49
10WF49
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
8W F1
6W20
6W20
6W20
6W20
8WF31
8WF31
8WF31 8WF31
8WF318WF318WF318WF318WF318WF31
CHILLER PAD
CHILLER PAD
CH-1
CH-2
8W F3
8W F3
8W F3
8W F3
8W F3
8WF318WF31
8W F3
8W F3
8WF318WF318WF318WF318WF318WF31
CHILLER PAD
CHILLER PAD
CH-1
CH-2
8W F3
8W F3
8W F3
8W F3
8W F3
8WF318WF31
8W F3
8W F3
A C D E
F3
8W
F3
8WF318WF318WF318WF318WF31
8W F3
10WF49
5W
5W
5W
5W
5W
5W
480-208 Trans 112.4kva
CAB 1 CAB 2
TRANSUPS
MBP
SWITCH ELVDP
PANEL
BATTERIES
ELVDP
PANEL
CUMMINS
TRANSFER
SWITCH
REFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
E F G
F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
480-208 Trans 112.4kva
CAB 1 CAB 2
TRANSUPS
MBP
SWITCH ELVDP
PANEL
BATTERIES
ELVDP
PANEL
CUMMINS
TRANSFER
SWITCH
REFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
G
E F G
1.1
1.2
1.3
1.4
A' B' C' D' E' F' G'
8'
7'
6'
3'
1'
8WF31
8W F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
C
855 SF
3A
A
A
EFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
G
1.1
1.2
1.3
1.4
A' B' C' D' E' F' G'
8'
7'
6'
3'
1'
8WF31
8W F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
C
A
EFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W
1.1
1.2
1.3
1.4
A' B' C' D' E' F' G'
8'
7'
6'
3'
1'
8WF31
8W F3
8W
F3
8WF318WF318WF318WF318WF318WF31
8W F3
10WF4910WF49
5W
5W
5W
5W
5W
5W
C
A
EFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W F3
G
1.1
1.2
1.3
1.4
A' B' C' D' E' F' G'
8'
7'
6'
3'
1'
8WF31
8W F3
8W
F3
8W F3
8W
F3
8W F3
8W
F3
8W F3
8WF318WF318WF318WF318WF318WF31
8WF31
8W F3
10WF49
10WF49
10WF49
10WF49
5W16
5W16
5W
5W
5W
5W
5W16
5W16
5W
5W
W 6x
W
6x
W 6x
W
6x
W 6x
W 6x
W
6x
W 6x
W
6x
W 6x
W 6x
W
6x
W 6x
W 6x
W 6x
W
6x
W 6x
W 6x
W 6x
W 6x
W 6x
W 6x
A
EFG
8W F3
8W
F3
8W F3
8W F3
8W
F3
8WF318WF31
8W F3
8W
| 3904-00 Cover |
| 3904-01 AR-1 |
| Sheets and Views |
| AR-1 |
| 3904-02 A-1 |
| 3904-03 A-2 |
| 3904-04 ME-1 |
| 3904-05 H-1 |
| 3904-06 H-2 |
| 3904-07 H-3 |
| 3904-08 H-4 |
| 3904-09 H-5 |
| 3904-10 H-6 |
| 3904-11 H-7 |
| 3904-12 H-8 |
| 3904-13 H-9 |
| 3904-14 H-10 |
| 3904-15 P-1 |
| 3904-16 P-2 |
| 3904-17 FP-1 |
| 3904-18 E-1 |
| 3904-19 E-2 |
File details come from the government source that posted it. Updated .