Attachment 1 - Supply Specification.pdf

PDF 567 KB Posted

Attached to
Munitions Storage Magazines Federal contract opportunity
Solicitation number
W50S9A21Q0002
Issued by
Department of the Army Utah Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Munitions Storage Magazines, newest first.
File Type Posted
Munitions Image 4.jpeg JPEG file
Munitions Image 3.jpeg JPEG file
Munitions Image 9.jpeg JPEG file
Munitions Image 7.jpeg JPEG file
Munitions Image 11.jpeg JPEG file
Munitions Image 10.jpeg JPEG file
Munitions Image 1.jpeg JPEG file
Munitions Image 5.jpeg JPEG file
Questions and Answers W50S9A21Q0002.pdf PDF
Munitions Image 2.jpeg JPEG file
Munitions Image 6.jpeg JPEG file
Munitions Image 8.jpeg JPEG file
Combined Synopsis_Solicitation.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ver. 5 Apr 2021

SUPPLY SPECIFICATIONS

FOR

USEB212307 Construct Munitions Magazines

1.0. Introduction:

1.1. Identification: Utah Air National Guard, 151st Civil Engineer Squadron, 765 North 2200 West, Salt Lake City, Utah 84116-2999

2.0. Technical Requirements - Provide a complete and usable ammunition storage magazines complying with the following:

2.1. Quantity: 2

2.2. Size: 40 feet long, 8 feet wide, 8 feet tall (each)

2.3. Type: Type 2 ammunition/explosives storage magazine. Meet or exceed US Government specification NSWC 3046-93-1

2.4. Includes: Full lightning protection system, grounding rods, anchor brackets and bolts, steel divider walls, electrical panel and distribution system, door systems with cam closers, explosion resistant interior and exterior lighting, entrance ramps, flooring, and shelving.

2.5. Electrical Connection Locations: As shown in the drawing below, the panel for the East magazine shall be located 21.5 feet plus or minus 1 foot from the magazine edge, and the panel for the West magazine shall be 7 feet plus or minus 1 foot from the edge. The West panel shall have a 20 amp breaker and a bottom knockout for an existing lighting circuit.

2.5.1. Provide and install conduit and wire for connection between East and West magazine electrical panels. The East magazine shall be connected to base power.

2.6. Warranty: Provide a 12 month material and workmanship warranty.

3.0. Install Services – The following services shall be provided with the purchase:

3.1. Crane service:

3.1.1. Relocate the existing (2) 40’x8’x8’ magazines to flat ground 125 feet away from current location.

3.1.2. Place new magazines in location of current magazines.

3.2. Provide setup and install of the full magazine, including interior and exterior build out.

Magazines shall be ready for munitions storage immediately after setup is complete.

4.0. Delivery:

4.1. POC: Maj Travis Johnson 801-245-2141

4.2. Address:

151 CES Bldg 301 765 N 2200 W Salt Lake City, UT 84116

5.0. Drawings:

5.1. East Magazine

5.2. West Magazine

File details come from the government source that posted it. Updated .