This statement of work outlines the requirements for internet services to support Homeland Security Investigations operations in Puerto Rico. The contractor shall install dedicated fiber optic lines with speeds of 1000/100 Mbps, 1000/1000 Mbps, and 1000/1000 Mbps at three locations in San Juan, and provide additional static IP addresses under the same subnets. The contractor must also ensure maximum bandwidth and 24/7 customer support. The period of performance is a one year base period starting September 30, 2021, with four one-year option periods ending September 29, 2026. The total potential value is unavailable. Quotes were due by August 5, 2021 to Immigration and Customs Enforcement in response to solicitation 192121VSA00000029.

View the file

Other files for this federal contract opportunity

Other files attached to Internet Services for HSI San Juan, newest first.
File Type Posted
Combined Synopsis_Solicitation Internet Services for HSI San Juan.pdf PDF
Attachment 2- Incorporated FAR Provisions and Clauses.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Internet Services (192121VSA00000029)

I. Purpose:

This Statement of Work (SOW) defines the requirements to provide for delivering commercial internet services to Homeland Security Investigations (HSI) San Juan.

II. Scope or Mission:

To support the mission of the Computer Forensics Laboratory (CFL) and the Technical Enforcement Group (TEG).

III. Period and Place of Performance:

Period of Performance will be from September 30, 2021 to September 29, 2026.

• September 30, 2021 to September 29, 2022 – Base Year

• September 30, 2022 to September 29, 2023 – Option Year 1

• September 30, 2023 to September 29, 2024 – Option Year 2

• September 30, 2024 to September 29, 2025 – Option Year 3

• September 30, 2025 to September 29, 2026 – Option Year 4

Place of Performance will be the following:

• 800 Ponce de Leon Avenue, 12th Fl, San Juan, PR 00907 (Miramar)

• 7 Tabonuco Street, Guaynabo, PR 00968 (SPOC)

• 400 Fernandez Juncos Avenue, San Juan, PR 00901 (Antilles)

IV. Background:

HSI San Juan has a requirement for internet service for the Technical Enforcement Group and for the Computer Forensics Laboratory (CFL). CFL supports not only HSI but also other law enforcement agencies in Puerto Rico and the U.S. Virgin Islands. Requirements are established based on current and future needs of circuits.

V. Deliverables

1. Contractor shall install a dedicated fiber optic line of 1000/100

(download/upload) speeds at the Miramar 12th Fl.

2. Contractor shall provide 20 additional static IP’s under the same subnet for the fiber optic line installed at the Miramar 12th Fl.

3. Contractor shall install a dedicated fiber optic line of 1000/1000

(download/upload) speeds at the SPOC 2nd Fl.

4. Contractor shall provide 2 additional static IP’s under the same subnet for the fiber optic line installed at the SPOC 2nd Fl.

5. Contractor shall install a dedicated fiber optic line of 1000/1000 (download/upload) speeds at the Antilles 1st Fl and client access points to basement, 1st Fl, 2nd Fl and conference room outside the main building.

6. Contractor shall provide 2 additional static IP’s under the same subnet for the fiber optic line installed at Antilles 1st Fl.

7. Contractor shall install a dedicated fiber optic line of 1000/1000 (download/upload) speeds at the Antilles 3rd Fl.

8. Contractor shall provide 2 additional static IP’s under the same subnet for the fiber optic line installed at Antilles 3rd Fl.

9. Contractor shall provide accessibility to CFL personnel to configure port within the modem.

10. Contractor shall ensure the maximum bandwidth customer support availability to support HSI’s 24/7 operations demand.

File details come from the government source that posted it. Updated .