Attachment_1_-_Statement_of_Work_.pdf
PDF 171 KB Posted
- Attached to
- WATERLINE IMPROVEMENTS AT SPRAGUE Federal contract opportunity
- Solicitation number
- 140L0621Q0082
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0621Q0082.pdf | ||
| Attachment_4_-_Bid_Worksheet.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Drawing_and_Specifications.pdf | ||
| Attachment_3_-_DOL_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Special Contract Requirements Medford, Oregon
Water Line Improvements at Sprague Seed Orchard Bureau of Land Management
SPECIAL CONTRACT REQUIREMENTS
FOR THE CONSTRUCTION OF
WATER LINE IMPROVEMENTS
AT SPRAGUE SEED ORCHARD
Description of Work
Work consists of Cutting and Removal of Trenching, Bedding, Water Line Pipe laying, Backfilling, and
Testing of Water Line at Sprague Seed Orchard. Minor work consists of cutting and replacing reinforced concrete slabs that are in the path of the new waterline work. Sprague Seed Orchard is at
1980 Russell Road, Merlin, Oregon.
Applicable Standard Specifications
The General Requirements (Division 100) and the applicable sections of Divisions 150 through 700 of the Federal Highway Administration’s "Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S. Customary Units" of the U.S. Department of Transportation, Federal Highway Administration apply to this project as modified by these Special Contract
Requirements and Contract Clauses contained in the contract. Unless otherwise noted, all reference headings in these Special Contract Requirements refer to divisions, sections, subsections, articles or paragraphs of the Standard Specifications, FP-14. The Contractor shall keep a copy of FP-14 on site during all construction for this project.
The FP-14 is a separately published book by the Federal Lands Highway. To download FP-14 or to obtain a hard copy, visit:
http://flh.fhwa.dot.gov/resources/pse/specs/fp-14.htm http://flh.fhwa.dot.gov/resources/pse/specs/fp-14.htm
PREFACE
Delete the Preface and substitute the following:
These Standard Specifications for the Construction of Roads and Bridges on Federal Highway Projects are issued primarily for constructing roads and bridges on Federal Highway projects under the direct administration of the Bureau of Land Management. These specifications are cited as "FP-14" indicating
"Federal Project" Standard Specifications issued in 2014 and contain both United States Customary and
Metric units of measure.
When designated in a contract, the FP-14 becomes part of the contract and binding upon all parties to the contract. Construction contracts of the Bureau of Land Management are also governed by the following regulations:
● Federal Acquisition Regulation (FAR), Title 48, Code of Federal Regulations, Chapter 1
The FAR regulations are not included in the FP-14. A complete copy of the FAR is available from the
Superintendent of Documents, Congressional Sales Office, U.S. Government Printing Office, Washington, DC 20402.
U.S. Customary units of measure are used in the FP-14 as provided in the November 25, 2008 Memorandum from Jeffrey F. Paniati entitled Update on Metric Use Requirements for FHWA Documents. Metric units are noted in parentheses following the U.S. Customary Units. The references to Metric or Metric units apply only when the project or portion of the project expressly calls for Metric units of measure.
Section 101. – TERMS, FORMAT AND DEFINITIONS
101.01 Meaning of Terms. Add the following:
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03 Abbreviations. Add the following to (a) Acronyms:
AA
AAN
AAR
ABA
ACPA
ADA
AFPA
AI
AIA
ARA
AREA
ASCE
ASCII
ASLA
BLM
FTMS
GSA
IEEE
MIL
MSHA
NESC
NFPA
PCA
SAE
USFS
USGS
USPS
WCLIB
WWPI
Aluminum Association
American Association of Nurserymen
Association of American Railroad
Architectural Barriers Act
American Concrete Pavement Association
Americans with Disabilities Act
American Forest and Paper Association
Asphalt Institute
American Institute of Architects
American Railway Association
American Railway Engineering Association
American Society of Civil Engineers
American Standard Code for Information Interchange
American Society of Landscape Architects
Bureau of Land Management
Federal Test Method Standard
General Services Administration
Institute of Electrical and Electronic Engineers
Military Specifications
Mine Safety and Health Administration
National Electrical Safety Code
National Forest Products Association
Portland Cement Association
Society of Automotive Engineers
United States Forest Service
United States Geological Survey
United States Postal Service
West Coast Lumber Inspection Bureau
Western Wood Preservers Institute
Add the following to (b) U.S. Customary unit abbreviations and symbols:
hr mp ppm
Hour
Milepost
Part Per Million
101.04 Definitions. Delete the definitions for the following terms:
Bid
Bidder
Modify the following definitions as follows:
Contract Time – Delete this definition and substitute the following:
Period of Performance (POP) – The specified time allowed for completion of contract work.
Notice to Proceed – Delete this definition and substitute the following:
Notice to Proceed – Written notice from the Contracting Officer to the Contractor to begin the contract work.
Section 102. – BID, AWARD, AND EXECUTION OF CONTRACT
Delete this section in its entirety.
Section 103. – SCOPE OF WORK
103.02 Disputes. Delete in its entirety.
103.03 Value Engineering. Delete in its entirety.
103.04 Contractor Records. Delete in its entirety.
Section 104. – CONTROL OF WORK
104.01 Authority of the Contracting Officer (CO). Delete in its entirety.
104.02 Authority of Inspectors. Delete in its entirety.
104.03 Specifications and Drawings.
(c) As-built drawings. Modify the first sentence to read as follows: Use one set of Contractor-provided plans exclusively for as-built drawings. Also provide photographs of all underground system components.
(d) Submittals. Add this section:
• Section 203 Receipt of Disposal at metal Recycling for steel tank.
• Section 301 Product Data for Backfill Material with classification and gradation
• Section 301 Moisture Density prior and Density In-Place at each layer for Backfill under slab or pavement.
• Section 601 Composition of Concrete Mix
• Section 611 Product Data for pipe and fittings and conformance: NSF Schedule 40 and 80 water pipe
104.04 Coordination of Contract Documents. Delete in its entirety.
Section 106. – ACCEPTANCE OF WORK
106.05 Statistical Evaluation of Work and Determination of Pay Factor. Delete in its entirety, including all references to Statistical Evaluation. All references to Section 106.05 shall be replaced with references to Section 106.04 Measured or Tested Conformance.
Section 107. – LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC
107.01 Laws to be Observed. Delete in its entirety.
107.02 Protection and Restoration of Property and Landscape. Delete in its entirety.
107.03 Bulletin Board. Delete in its entirety.
107.05 Responsibility for Damage Claims. Delete in its entirety.
107.06 Contractor’s Responsibility for Work. Delete in its entirety.
107.09 Legal Relationship of the Parties. Delete in its entirety.
Section 108. – PROSECUTION AND PROGRESS
Delete this section in its entirety.
Section 109. – MEASUREMENT AND PAYMENT
109.03 Weighing Procedures and Devices.
(c) Project weighing system. Add the following:
Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements. For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.
109.06 Pricing of Adjustments. Delete in its entirety.
109.07 Eliminated Work. Delete in its entirety.
109.08 Progress Payments. Delete in its entirety.
109.09 Final Payment. Delete in its entirety.
Section 151. – MOBILIZATION
Payment
151.03 Add the following
Pay Item Description Unit Price
1-151 Mobilization Lump Sum
Section 203. – REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Description
203.01 Add the following: work also consists of removal and disposal of 1000 gallon steel tank and piping removed for waterline work.
203.05 Disposing of Material
(a)Remove from Project. Delete in its entirety and replace with the following: Clean and dispose of tank and all metal at metal recycler such as Cascade Metal Recycling, Grants Pass; Schnitzer
Steel, White City or S&D recycling, Medford Oregon. Cut hole in tank for inspection prior to disposal.
Submit a statement documenting the nature and quantity of material processed or sold for recycling or submit a signed copy of the disposal agreement before disposal begins.
(b) Burn. Delete in its entirety
(c)Bury. Delete in its entirety
203.08 Add the following:
2-203 Removal and Disposal Lump Sum
Section 601. – MINOR CONCRETE STRUCTURES
Measurement
601.08 Add the following:
Work includes removal and disposal, replacement of backfill, base material under slab, reinforcement, and concrete work
602.09 Add the following:
3-601 Replace Reinforced Conc. Slabs Square Yard
Section 611. – WATER SYSTEMS
Material
611.02 Add the following:
Flowmeter - capable of measuring to 1 gpm accuracy
Air vent on wellhead - meets OAR requirements and plumbing code
Depth Gauge – (Airline or Sounder) capable of measuring static waterline depth
Construction Requirements
611.03 General Add the following: Potable-water piping and components shall comply with NSF 14, NSF 61, and NSF 372 with marking “NSF-pw” on piping. PVC pipe shall be ASTM D1785 Schedule
40. PVC Socket fittings ASTM D 2466 shall be used, and threaded fittings shall be Schedule 80, ASTM D 2464.
Flowmeter, air vent with return bend, and static water level measuring device to be installed per manufactures instructions. Note that many flowmeters require minimal straight lengths both before and after flowmeter.
Tap Waterline- indicates either cold or hot tap with material and method proposal by Contractor to COR prior to Construction.
611.04 Backfilling Add the following: Do not enclose, cover or put piping into operation until it has been inspected and approved by authorities having jurisdiction. Arrange for COR to observe tests.
1. Piping Tests:
a. Fill domestic water piping. Check components to determine that they are not air bound and that piping is full of water.
b. Test for leaks and defects in new piping and parts of existing piping that have been altered, extended, or repaired. If testing is performed in segments, submit a separate report for each test, complete with diagram of portion of piping tested.
c. Leave new, altered, extended, or replaced domestic water piping uncovered and unconcealed until it has been tested and approved. Expose work that was covered or concealed before it was tested.
d. Cap and subject piping to static water pressure of 50 psig (345 kPa) above operating pressure, without exceeding pressure rating of piping system materials. Isolate test source and allow it to stand for four hours. Leaks and loss in test pressure constitute defects that must be repaired.
e. Repair leaks and defects with new materials, and retest piping or portion thereof until satisfactory results are obtained.
Add the following:
611.04a Cleaning
Clean and disinfect potable domestic water piping as follows:
a. Purge new piping and parts of existing piping that have been altered, extended, or repaired before using.
b. Use purging and disinfecting procedures prescribed by authorities having jurisdiction; if methods are not prescribed, use procedures described in either
AWWA C651 or AWWA C652 or follow procedures described below:
1) Flush piping system with clean, potable water until dirty water does not appear at outlets.
2) Fill and isolate system according to either of the following:
a) Fill system or part thereof with water/chlorine solution with at least 50 ppm (50 mg/L) of chlorine. Isolate with valves and allow to stand for 24 hours.
b) Fill system or part thereof with water/chlorine solution with at least 200 ppm (200 mg/L) of chlorine. Isolate and allow to stand for three hours.
3) Flush system with clean, potable water until no chlorine is in water coming from system after the standing time.
4) Repeat procedures if biological examination shows contamination.
5) Submit water samples in sterile bottles to authorities having jurisdiction.
Measurement
611.06 Add the following: Include all work including but not limited to fittings, removal and disposal, backfill material, foundation fill as necessary, detectable wire, testing, disinfecting, and miscellaneous work shown on plans for inside building.
611.07 Add the following
4-611 1” PE Pipe Lineal Feet
5-611 2” Pipe Lineal Feet
Section 708. – PLASTIC PIPE
708.01 Delete in its entirety and replace with the following:
PE PIPE AND FITTINGS
A. PE, ASTM Pipe: ASTM D2239, SIDR No. 5.3, 7, or 9; with PE compound number required to give pressure rating not less than 200 psig (1380 kPa).
1. Insert Fittings for PE Pipe: ASTM D2609, made of PA, PP, or PVC with serrated male insert ends matching inside of pipe. Include bands or crimp rings.
2. Molded PE Fittings: ASTM D3350, PE resin, socket- or butt-fusion type, made to match PE pipe dimensions and class.
B. PE, AWWA Pipe: AWWA C906, DR No. 7.3, 9, or 9.3; with PE compound number required to give pressure rating not less than 200 psig (1380 kPa).
1. PE, AWWA Fittings: AWWA C906, socket- or butt-fusion type, with DR number matching pipe and PE compound number required to give pressure rating not less than 200 psig (1380 kPa).
Add the Following:
708.09 Gate Valves
1.2 BRONZE GATE VALVES
A. Bronze Gate Valves, NRS, Class 125:
1. Description:
a. Standard: MSS SP-80, Type 1.
b. CWP Rating: 200 psig (1380 kPa).
c. Body Material: Bronze with integral seat and screw-in bonnet.
d. Ends: Threaded or solder joint.
e. Stem: Bronze.
f. Disc: Solid wedge; bronze.
g. Packing: Asbestos free.
h. Handwheel: Malleable iron, bronze, or aluminum.
B. Bronze Gate Valves, RS, Class 125:
1. Description:
a. Standard: MSS SP-80, Type 2.
b. CWP Rating: 200 psig (1380 kPa).
c. Body Material: Bronze with integral seat and screw-in bonnet.
d. Ends: Threaded or solder joint.
e. Stem: Bronze.
f. Disc: Solid wedge; bronze.
g. Packing: Asbestos free.
h. Handwheel: Malleable iron, bronze, or aluminum.
C. Bronze Gate Valves, Press Ends:
1. Description:
a. Standard: MSS SP-80 and MSS SP-139.
b. CWP Rating: Minimum 200 psig (1380 kPa).
c. Body Material: Bronze with integral seat and union-ring bonnet.
d. Ends: Press.
e. Press Ends Connection Rating: Minimum 200 psig (1380 kPa).
f. Stem: Brass or bronze [rising] or [non-rising].
g. Disc: Solid wedge; bronze.
h. Packing: Graphite.
i. Port: Full.
j. Handwheel: Malleable iron, bronze, or aluminum.