Attachment 1 Statement Of Work.pdf

PDF 295 KB Posted

Attached to
MX45 Calibration Federal contract opportunity
Solicitation number
N66604-21-Q-0473
Issued by
Department of the Navy Naval Sea Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to MX45 Calibration, newest first.
File Type Posted
Attachment 2 Sole Source Justification.pdf PDF
N66604-21-Q-0473 RFQ details.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V1.2 – FEBRUARY2021

PR #1300922586

PID NO: 25-0274

STATEMENT OF WORK

(SOW)

MX45 Power Supplies Upgrade and Calibration

PR No. 1300922586

1.0 Background

The Power lab does power interface testing for 450, 397, and many PARMs for NPES subsystem to make sure the ships power and systems are compatible. The Naval Undersea Warfare Center

Division Newport (NUWCDIVNPT) Power Laboratory (Code 2521) utilizes these California

Instruments /AMETEK programmable power sources to support the Power Systems Engineering

Group (PSEG) in Power Environmental Qualification testing (EQT) in accordance with the MIL-

STD 1399-300X. The models identified as MX45 are units in need of repair, upgrade and calibration. The two MX45 units are 10 and 20 years old.

1.1 Places of Performance – Calibration and Upgrade to be completed at Ametek’s facility in California

1.2 Authorized Users – Code 2521 PSEG

1.3 Sponsors – Naval Sea Systems Command

1.4 Types of Funding – RDT&EN

2.0 Scope

The contractor shall upgrade units from series I to series II, and fully calibrate and verify the two

MX45 units run in parallel application as a MX90 would operate.

3.0 Applicable Documents

N/A

4.0 MX45 Power Supplies Upgrade and Calibration

4.1 The Power supplies shall be sent out to the contractor to evaluate, upgrade, calibrate and verify proper functionality of the units.

4.2 The contractor will inspect and test each MX45 unit before and after upgrade to determine the status of the units. The contractor shall communicate systems evaluations both verbally and in writing to the Government PSEG team. The contractor shall provide calibration documents to the Government for each MX45 system. The systems evaluations will be verbally and written to the power team. There should be calibration documents provided for each MX45 system.

5.0 Government Furnished Information

V1.2 – FEBRUARY2021

PR #1300922586

PID NO: 25-0274

6.0 Exception From Information and Communication Technology Accessibility

Requirements

7.0 Compliance With Information and Communication Technology Accessibility

Requirements