Attachment 1 Statement Of Work.pdf
PDF 295 KB Posted
- Attached to
- MX45 Calibration Federal contract opportunity
- Solicitation number
- N66604-21-Q-0473
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Sole Source Justification.pdf | ||
| N66604-21-Q-0473 RFQ details.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V1.2 – FEBRUARY2021
PR #1300922586
PID NO: 25-0274
STATEMENT OF WORK
(SOW)
MX45 Power Supplies Upgrade and Calibration
PR No. 1300922586
1.0 Background
The Power lab does power interface testing for 450, 397, and many PARMs for NPES subsystem to make sure the ships power and systems are compatible. The Naval Undersea Warfare Center
Division Newport (NUWCDIVNPT) Power Laboratory (Code 2521) utilizes these California
Instruments /AMETEK programmable power sources to support the Power Systems Engineering
Group (PSEG) in Power Environmental Qualification testing (EQT) in accordance with the MIL-
STD 1399-300X. The models identified as MX45 are units in need of repair, upgrade and calibration. The two MX45 units are 10 and 20 years old.
1.1 Places of Performance – Calibration and Upgrade to be completed at Ametek’s facility in California
1.2 Authorized Users – Code 2521 PSEG
1.3 Sponsors – Naval Sea Systems Command
1.4 Types of Funding – RDT&EN
2.0 Scope
The contractor shall upgrade units from series I to series II, and fully calibrate and verify the two
MX45 units run in parallel application as a MX90 would operate.
3.0 Applicable Documents
N/A
4.0 MX45 Power Supplies Upgrade and Calibration
4.1 The Power supplies shall be sent out to the contractor to evaluate, upgrade, calibrate and verify proper functionality of the units.
4.2 The contractor will inspect and test each MX45 unit before and after upgrade to determine the status of the units. The contractor shall communicate systems evaluations both verbally and in writing to the Government PSEG team. The contractor shall provide calibration documents to the Government for each MX45 system. The systems evaluations will be verbally and written to the power team. There should be calibration documents provided for each MX45 system.
5.0 Government Furnished Information
V1.2 – FEBRUARY2021
PR #1300922586
PID NO: 25-0274
6.0 Exception From Information and Communication Technology Accessibility
Requirements
7.0 Compliance With Information and Communication Technology Accessibility
Requirements
File details come from the government source that posted it. Updated .