Attachment 1 - SOW.pdf
PDF 2 MB Posted
- Attached to
- PKC - 22 AS Blinds Federal contract opportunity
- Solicitation number
- FA442722Q0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22 AS Blinds Combo V2.pdf | ||
| 22 AS Blinds Combo.pdf | ||
| ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL CONTRACTORS (OCT 2021).pdf | ||
| Contract Security Clause.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work For
22 AS Rolling Shades
The 22nd Airlift Squadron has a requirement for 35 custom rolling shades or 39 shades for dividing walls. The contractor must measure prior to installation and shall provide all tools, materials and labor needed to deliver and install shades as outlined in this SOW, as well as remove and dispose of existing blinds.
Delivery/Install: 45 Days ARO
Description:
1.1 General Services
Coordination and management of all equipment and people required to disassemble current blinds and install shades in squadron.
1.1.1 Services shall include measurement of window frames and that all structural and other anomalies are taken into account to ensure shades will fit.
1.1.2 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, assembly, transportation, incidentals and all other items and services necessary to remove existing blinds and install shades.
Specifications/Salient Characteristics
1.1.3 38 grey rolling shades with 1% openness. A total of four shades will have a logo. Mission Control will have Logo 1 on two shades and the Commanders office will have Logo 1 and Logo 2 on his two shades. Font is “Bookman Old Style” for Logo 2. Following approximate dimensions:
Total Shades Width (inches) Length (inches) Room
Inside left office Rm 223.pdf
8 3/8 inch at divider wall
84 inch outside left office at divider wall 95 inch entire shade
70 ½ RM 223 left office
46 1/4 70 ½ RM 223
94 7/8 70 ½ RM 223
94 70 ½ RM 223
19 inch shade.pdf
19 inch at divider wall 24 inch at divider wall 45 3/8 entire shade
70 ½ Conference Room:
Outside (left) conference room:
Divider wall 19 inch blinds if stopping at border/ 45 3/8 inch if doing entire shade
24 inch shade.pdf conference room.pdf
Left side interior conference room:
Divider wall 24 inch if stopping at border/ 45
3/8 if doing entire shade 83 3/8 70 1/2 Middle shade conference room inside right conference.pdf
9 inch shade (right) outside.pdf
84 7/8 if going to divider wall
9 inch going to divider wall outside right conference room 94 ¾ entire shade
70 ½ Right side interior conference room:
84 7/8 or 94 ¾ for entire shade 9 inch outside of conference room on right side
85 70 1/2 RM 223
94 1/2 70 ½ RM 223
right office.pdf
Right office
95 70 ½ RM 223 Right Office: Has a divider wall only an inch on outside of divider 94 3/8 70 ½ RM 223 Student
Classroom 93 7/8 70 ½ RM 223 Student
Classroom
Rm 225 left outside office.pdf
Rm 225 left office from outside.pdf
68 3/8 inside office to divider wall
22 ¾ outside office to divider wall
94 5/8 entire shade
70 ½ RM 225
Left side office
68 3/8 inside office to divider wall
22 ¾ outside office to divider wall
94 5/8 entire shade
94 5/8 70 ½ RM 225
46 ¼ 70 ½ RM 225
94 5/8 70 ½ RM 225
94 ¼ 70 ½ RM 225
94 1/2 70 ½ Mission Control 94 7/8 70 ½ 94 7/8 70 ½ (Logo 1) 46 70 ½ 94 3/4 70 ½ (Logo 1)
69 7/8 70 ½ RM 234
94 3/8 70 ½ RM 234
94 ¼ 70 ½ RM 236
46 ½ 70 ½ RM 241
105 5/8 70 ½ CSS 243
82 7/8 70 ½ CSS 243
95 3/4 70 ½ CSS 243
95 70 ½ CSS 243
inside.pdf
Looking into office.pdf outside.pdf
94 ½ entire shade 70 ½ CSS 243 Has divider wall
94 3/8 70 ½ RM 238 (Logo 1) 94 3/8 70 ½ RM 238 (Logo 2) 94 ½ 70 ½ Conference Room 94 3/4 70 ½ Conference Room
Place of Delivery/Install:
Address 170 Ragsdale St, 2nd Floor
Bldg 836 Travis AFB, CA 94535
22 AS Squadron, 2nd Floor, in the following rooms:
Location Total Number of Shades 223 12 if doing whole shades. If dividing 15 shades
225 5 if doing whole shades. If dividing 6 shades Mission Control 5
Room 234 2 Room 236 1 Room 241 1 Room 243 5
Room 238 (CC Office) 2
Conference Room 2
Logo #1 Logo #2
Existing blinds:
DOUBLE DEUCE
(bold white letters, grey shadow as shown in picture on next page)
Shades we will go to:
Dividing walls in RM 223 conference room (left side):
Dividing walls in RM 223 conference room (Right side):
Rm 223 Left office:
Right office Rm 223:
CSS:
File details come from the government source that posted it. Updated .