Attachment 1 - SOW.pdf
PDF 585 KB Posted
- Attached to
- Freedom Chapel Doors Federal contract opportunity
- Solicitation number
- FA301621U0197
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ - FA301621U01970001.pdf | ||
| RFQ - FA301621U0197-0001.pdf | ||
| Attachment 2 - Wage Determination - 2015-5253.pdf | ||
| RFQ - FA301621U0197.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
Exterior Wood and Iron Door Removal
Pyramid Chapel Bldg 1528 Joint Base San
Antonio - Lackland Air Force Base
PREPARED BY: Gabriel Talamantes
NAME OF INSTALLATION: Joint Base San Antonio
Lackland Air Force Base
PROJECT MANAGER: Gabriel Talamantes
PART 1 – SCOPE OF WORK:
1.1 GENERAL: The work to be performed under this contract and in accordance with this Statement of Work shall consist of furnishing all necessary parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work shown in the statement of work, and all applicable codes, regulations, standards, and criteria in effect at the date of solicitation. All commercial installation/repairs must be performed by qualified skilled/licensed technicians.
1.2 PROJECT DESCRIPTION: Provide all labor, materials, to perform removal/replacement of exterior wooden doors and iron gates at the Pyramid Chapel building 1528.
The following components must be accomplished (See Appendix A for currently installed doors):
o Contractor shall remove and replace the following:
9 Single Solid Wood Doors – Doors have 3’-0 x 7’-0 opening, 4 ea. Right Hand Swing, 4
ea. Left Hand Swing, 1 ea. Door that Swing out, and all single doors have a 7"x 45" to the existing door.
5 sets of Wooden Double Door (Double doors = 2 doors per set) Total of 10 doors for all sets combined.
There are 2 sets of ea. 59 3/4”x 83 ¾” Double Door Openings. Each door measuring approximately 29 -3/4”x 83- 5/8” and 1 ¾” thickness with (12) 5”x 6” lites arranged in a rectangular array, with three across and four down (see existing door).
There are 3 ea. 72”x 82 1/8” Double Door Openings with each door measuring approximately 35 3/4”x 83” and 1 ¾” thickness with (21) 5”x 5” lites arranged in a rectangular array, with three across and four down (see existing door).
Color stain shall be a rustic cedar finish or similar with sealer.
All hardware shall be Satin chrome or Satin Stainless steel and shall have removable cores and rekeyed to one master key Contractor shall remove and replace 2 double iron gates leading into the Chapel
Courtyard from outside the Chapel.
Single doors hardware shall be commercial grade medium door closers (medium-duty, Hydraulic Dual Adjustable for commercial applications) silver finish. Door knob shall be a Cylindrical Knob Lock - Classroom Function with dead locking latch; should accept high security core cylinders.
Double door hardware shall be commercial grade heavy duty Hydraulic Dual Adjustable door closers.
Doors shall have commercial heavy rim exit dive with lever trim Panic hardware meeting Heavy Duty – ANSI/BHMA Grade-1– and ANSI Function 09 (Night Latch – Key Retracts Latchbolt) characteristics.
Front door hardware shall be commercial grade key pad on right door with lever and left door lever similar to other double doors with key Commercial Combination Lock that meets or exceeds Z-Wave Alliance requirements with LED screens .
Opening measure approximately 8’x 8’1/2”. Metal Frame Doors is approximately 6-0 x 7-0, 2” thick.
2 sets of Iron Gates (Iron Gates= 2 doors per set) Total 4 Iron gates. Gates and frame to replace shall seal the entire door way not to allow any animals to come in the court yard. There shall be a metal sheet of mesh on the back side of door with small holes. Color shall match current metal doors is color and style (see Appendix A).
o 1 set of wooden doors are on the Northwest side main entrance of the chapel. All other wooden doors are located in the chapel courtyard. Iron gates are also located in the courtyard area.
o Contractor shall replace all wooden exterior doors with solid Cedar or Oak exterior wood door or better to weather the outside elements. All doors must match the existing doors taken off, i.e. exterior wood type or better, same lite pattern, size, and color stain. All doors must be able to weather the outside elements.
o Contractor shall take measurements/pictures of the doors/gates prior to making the doors/gates to ensure proper measurements and design.
o Color of all doors must be approved by CE prior to application or order.
o Coordinate with Lackland AFB Civil Engineer Operation Planning office ahead of time.
o Contractor shall utilize all proper Personal Protective Equipment (PPE) for this project at all times.
o Contractor shall haul all project waste off government property.
o Upon completion of project, contractor shall call Civil Engineering POC and Facility Manager for inspection.
o Practice good housekeeping before, during, and after work in progress to ensure safe work area o Upon final inspection, contractor is responsible for removing all tools, trash, equipment, and personnel off government installation.
1.3 LOCATION: Building 1528 on 2700 Truemper St, Joint Base San Antonio, Lackland TX.
1.4 WORK AND MECHANICS: The work for this project shall be executed in the best and most craftsman-like manner, by qualified and efficient mechanics/tradesmen, skilled in their respective trades. Only certified journeymen in each respective trade, or apprentices under the direct supervision of certified journeymen, shall be permitted to install and/or supervise installation for this project. Individual trade work for this project shall be performed and quality maintained by the applicable trade only. The Contractor shall assure that all trades coordinate their work with that of other trades. The Contractor shall coordinate and perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with prevailing industry standards and manufacturer’s instructions. Work and materials shall comply with this Statement of Work and the editions in effect at the time of this solicitation for all applicable criteria, regulations, guidelines, and codes, all of which are made a part thereof.
US ARMY CORPS OF ENGINEERS HEALTH AND SAFETY MANUAL
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70
NFPA 101
National Electrical
Code Life Safety
OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION (OSHA)
OSHA STD 29 C.F.R. 1910 and 1926
CODE OF FEDERAL REGULATIONS
Code of Federal Regulations, Title 40 (40 CFR), Protection of Environment, parts 260-270
1.5 WARRANTY: The Contractor shall identify all items being installed that are guaranteed or under warranty for more than a one-year period, and provide validated copies of the manufacturer’s warranty. All warranty information shall be filed by the Contractor in the Government’s name. All warranties shall be identified by product with a listing of the name and address of the company and the expiration date of the guarantee or warranty.
1.6 DELIVERY, STORAGE, AND PARKING: All equipment delivered and stored shall be protected from the weather, humidity and temperature variation, dirt and dust, and any other contaminants.
1.11.1 CONTRACTOR STORAGE: The Planning Section Lead and/or designated Planning Technician shall designate Contractor storage and parking area.
1.11.2 STORAGE AREAS: All project storage areas shall be kept free of debris, leaks, stains, or splashes and kept in a neat, clean, and safe condition. Any contamination of the storage area by a hazardous substance shall be immediately remediated by the Contractor, in accordance with PART 2.0 below at no additional expense to the
Government. All paints, thinners, and other hazardous materials shall be secured when not in use.
1.7 UTILITY OUTAGES AND SPECIAL CONDITIONS:
1.12.1 PERMITS:
1.12.2 UTILITY OUTAGES:
1.7 UTILITY OUTAGES AND SPECIAL CONDITIONS:
1.12.1 PERMITS:
1.12.2 UTILITY OUTAGES:
1.12.3 UTILITIES CONSERVATION: The Contractor shall instruct employees in utilities conservation practices. The
Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which shall include: Lights shall be used only in areas where and when work is actually being performed. The Contractor shall not adjust mechanical equipment controls for heating, ventilation, and air conditioning systems. Water faucets or valves shall be turned off after the required usage has been accomplished. The Contractor shall not use base telephones and provide their own means of communication. The
Contractor shall use good judgment in the conservation of Government utilities. Prevailing energy conservation practices shall be adhered to and enforced by the Contractor.
1.12.4 BASE FIRE REGULATIONS: The Contractor shall comply with Base Fire Regulations as set forth in the latest edition of
GAFB Instruction 32-2001, titled “Base Fire Protection Program”. The Contractor shall use no explosives in performing the work.
All work shall be in strict compliance with NFPA-101.
1.8 REMOVAL: Items to be included in the removal shall include but not be limited to the careful removal and disposition of materials. The Contractor shall, before commencement of any work, carefully survey the existing site to determine the extent of the work. The Contractor shall take all necessary precautions to ensure against damage to existing work to remain in place, or to remain the property of the Government. Any damage to the aforementioned shall be repaired or replaced by the Contractor at no additional cost to the Government. The Contractor shall be responsible for the proper disposal of all materials, meeting all rules pertaining to the disposal of such products.
PART 2 – ENVIRONMENTAL REQUIREMENTS:
2.1 COMPLIANCE WITH LAWS: Work site activities are NOT exempt from air emission, storm water, hazardous waste, and other environmental compliance rules and regulations. The Contractor shall comply and ensure that all Sub-Contractors comply with all applicable federal, state, and local laws, regulations, ordinances and standards related to environmental matters. The
Contractor shall also comply and ensure that all Sub- Contractors comply with all specific instructions or directions given to the Contractor by JBSA Lackland regarding environmental matters.
2.2 PROTECTION OF HISTORICAL AND ARCHAEOLOGICAL RESOURCES: All known Historical, Archaeological, and Cultural Resources, if any, within the Contractors work area will be designated on the contract Technical Exhibits. The
Contractor shall take precautions during the contract to preserve all resources, as they existed at the time of contract award and comply with the Archaeological and Historic Preservation Act (AHPA) and the Archaeological Resources Protection Act (ARPA).
The Contractor shall provide all protective devices such as off limit markings, fencing, barricades or other devices as designated on the contract Technical Exhibits and shall be responsible for preservation of the sites during this contract.
All items having any apparent historical or archaeological interest outside of designated areas that are discovered in the course of any work site activities shall be carefully preserved. The Contractor shall protect the find in-place by leaving the archaeological find undisturbed and by using flags to mark a 50-foot radius area around the find. The find shall be immediately reported to the
Planning Section Lead so that the proper authorities may be notified. All work shall be stopped in the immediate area of the discovery until directed by the Planning Section Supervisor, Mr. Irwin Stuart, to resume work. Any work required to preserve or protect these finds shall be accomplished before work resumes.
2.3 HAZARDOUS AND SPECIAL WASTES GENERATED BY THE CONTRACTOR: The Contractor shall identify, characterize, containerize, store and dispose of hazardous wastes in strict accordance with federal guidelines found in the Code of
Federal Regulations, Title 40 (40 CFR) parts 260-270, state regulation 30 TAC 335, all local guidelines, and as specified. A
Uniform Hazardous Waste Manifest shall be used by the Contractor to document all parties and locations involved in the transportation, storage and disposal of all hazardous and special wastes. This form shall be provided to the government by the
Contractor and signed by the Base Environmental Coordinator (CEA) before the waste is transported from the limits of government property. A copy of the manifest shall be signed by the receiver of the waste and submitted to the Planning Section
Lead not later than forty-five days after disposal has taken place. Hazardous waste treatment, storage and disposal facility shall be located within in the state of Texas, permitted by the U.S. EPA, and approved by CEA.
2.4 CONTRACTOR ENCOUNTERED HAZARDOUS WASTE: The Contractor shall notify the Planning Section Lead and/or designated Planner as well as CEAN (i.e. Toxic Programs) upon encountering any material not identified in this Statement of
Work thought to be hazardous that could jeopardize the safety of workers or personnel in the area. The Government will be responsible for characterization, transportation, storage and disposal of the waste if necessary.
2.5 ASBESTOS: To the best of the Government's knowledge, no asbestos-containing material (ACM) will be encountered during this project. Should the Contractor encounter previously unidentified or suspected ACM which must be disturbed to comply with the contract documents, the Contractor shall cease that work which would disturb the suspect material and shall immediately notify the Planning Section Lead. The Government will take steps, as appropriate, to ascertain the material's composition and determine any remedial actions necessary.
2.6 NUISANCE AND POLLUTING ACTIVITY PROHIBITED: Polluting, dumping, or discharging of any harmful, nuisance, or regulated materials (such as but not limited to concrete truck washout, vehicle maintenance fluids, residue from saw cutting operations, solid waste and hazardous substances) into building drains, site drains, streams, waterways, holding ponds or to the ground surface shall not be permitted and the Contractor shall be held responsible for any and all damages which may result. Further, the Contractor shall conduct work activities in such a fashion as to avoid creating any legal nuisance, including but not limited to, suppression of noise and dust, control of erosion, and implementation of other measures as necessary to minimize offsite impacts of work activities.
PART 3 – PRODUCTS:
3.1 REFERENCES TO MATERIALS, MANUFACTURERS, AND PRODUCTS: Materials and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture of the products and shall essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Equipment shall be supported by a service organization that is, in the opinion of the Planning Section Lead, reasonably convenient to the site.
3.1.1 VERIFICATION OF DIMENSIONS AND CONDITIONS: The Contractor shall visit the premises to become thoroughly familiar with details of the work and working conditions, field verify all dimensions and advise the Planning Section Lead of any discrepancies before starting the work.
3.2 GOVERNMENT FURNISHED EQUIPMENT (GFE): None
PART 4 – ADDITIONAL INFORMATION:
4.1 GENERAL: All work shall be installed as shown and in accordance with commercial door operator installation procedures, unless otherwise specified. All dimensions are shown for information only. Contractor shall field verify all dimensions and site conditions. The Contractor shall provide all labor, materials, tools and equipment required to perform all dismantling, repairs, and re-installation as listed in this statement of work.
4.2 REMOVAL The Contractor shall be responsible for providing a dumpster if needed and shall clean up and cover the dumpster each night. Dumpster location shall be designated by the designated Planning Technician.
4.3 INSTALLATION: The Contractor will provide the labor and materials to fully complete the removal and replacement of all wooden doors/iron gates for Joint Base San Antonio - Lackland.
4.4 RESTORATION OF THE WORK SITE AREA: Contractor shall provide and/or restore the following to its original state: paint/stain as required.
4.5 COMPLETION OF WORK:
4.5.1 OPERATIONAL SYSTEMS: The Contractor shall insure that all work is performed in accordance with the criteria herein and demonstrate to the requester/agent a successful function check.
4.5.3 MANUALS: The Contractor shall provide all applicable manufacturers recommendations and operating instructions to the designated Planning Technician or Planning Section Lead.
END OF STATEMENT OF WORK