Attachment 1 - SOW.pdf

PDF 865 KB Posted

Attached to
Repair Hangar Doors Bldg. 10286 Hangar 7 Federal contract opportunity
Solicitation number
FA500021R0046
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Other files attached to Repair Hangar Doors Bldg. 10286 Hangar 7, newest first.
File Type Posted
Solicitation - FA500021R0046.pdf PDF
Attachment 3 - Open Market General Specifications.pdf PDF
Attachment 2 - AF Form 66.xlsx XLSX spreadsheet
Attachment 4 - Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Joint base elmendorf richardson

STATEMENT OF WORK (SOW)

Repair Hangar Doors Bldg. 10286

PROJECT NUMBER WT# 9271856

Date: 26 April, 2021

FA500021R0046

Repair Hangar Doors Bldg. 10286

Attachment 1 - SOW

TABLE OF CONTENTS

PARTS:……………………………………………………………………......………………..PAGE

PART I – PROJECT SPECIFIC GUIDANCE

1. SCOPE

1.1. PERIOD OF PERFORMANCE

1.2. OBJECTIVE…………………………………………………………………………………..1

1.3. LIMITATIONS

2. POINTS OF CONTACT

3. GOVERNMENT-FURNISHED INFORMATION

PART II – GENERIC REQUIREMENTS

1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS

2. DESIGN REQUIREMENTS

3. CONSTRUCTION REQUIREMENTS

4. CONTRACT ADMINISTRATION REQUIREMENTS

5. SECURITY/ FLIGHT LINE DRIVING…………….………………………...........................3-5

FA500021R0046

Repair Hangar Doors Bldg. 10286

PART I – PROJECT SPECIFIC GUIDANCE

1. SCOPE: Repair Hangar Door

1.1. PERIOD OF PERFORMANCE: The Contractor shall complete performance within

30 calendar days of the notice to proceed date.

1.2. OBJECTIVE: Return Hangar Door #3 to Operational Service

A BUILDING SITEWORK – Bldg.10286

1.3. LIMITATIONS: The contractor shall be escorted into any areas they do not have the appropriate clearance to be in as determined by the government.

2. POINTS OF CONTACT (POC): POC(s) will be provided at the time of contract award.

3. GOVERNMENT-FURNISHED INFORMATION, EQUIPMENT, MATERIAL,

AND PROPERTY

A. INFORMATION – The Government shall provide basic/minimal documents describing the work required in this SOW. The Government shall provide the Contractor access to the site to include all areas of work described in this SOW.

B. EQUIPMENT – None provided.

C. MATERIAL – The Government shall provide parts and material to be repaired and returned to service.

D. PROPERTY – None Provided.

PART II – GENERIC REQUIREMENTS

1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS

A. Department of Defense specifications and criteria are located at https://wbdg.org/ffc/dod.

B. Air Force specifications and criteria are located at https://wbdg.org/ffc/af-afcec.

C. JBER Installation Facilities Standards (IFS) is located at https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/jber-elmendorf-ifs

FA500021R0046

Attachment 1 - SOW https://wbdg.org/ffc/dod https://wbdg.org/ffc/af-afcec.

https://www.wbdg.org/ffc/af-afcec/installation-facilities-standards-ifs/jber-elmendorf-ifs

2. DESIGN REQUIREMENTS: TABLE OF DELIVERABLES

a. All work to be performed by certified/licensed technicians with experience repairing or installing aircraft hangar door systems. Welders must be certified.

3. DETAILED CONSTRUCTION REQUIREMENTS

a. Remove and replace main lifting cable on door #3.

b. Remove winch assembly from door #3 - replace it with winch assembly from door #2, this will allow door #3 to return to service.

c. Door #2 will remain tagged out.

d. All parts removed will be inspected before returning to service.

e. PERMITS – The Contractor is responsible for all applicable permits, licenses, and certificates required to perform and execute this contract.

4. CONTRACT ADMINISTRATION REQUIREMENTS

a. PROGRESS SCHEDULE, AF FORM 3064 – The Contractor shall prepare and submit, for approval, by the Contracting Officer (CO), a work breakdown structure. The work breakdown structure shall be used to report the cost and schedule status for this project. All tasks required under this type of contract shall be included in the work breakdown structure.

b. NOTIFICATION REQUIREMENT – The Contractor is required to notify the

Contracting Officer and the Project Manager of critical issues that may affect life, health, safety, contract performance, or the environment. Verbal notification should be made immediately followed by written notification as soon as practical.

5. SECURITY:

a. SECURITY INSTRUCTIONS: All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the Installation shall abide by all security instructions and directives of Joint Base Elmendorf Richardson (JBER).

b. At the close for each work period, Government facilities, equipment and materials shall be secured, lights, heat and water turned off and all doors and window secured.

c. The Contractor and, as applicable, Subcontractor shall not employ persons for work on this contract if such employee is identified as a potential threat to the health, safety, security, general wellbeing or operational mission of the Installation and its population, nor shall the contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified during the Criminal Background Check (CBI).

c. Contractors shall ensure their employees and those of their subcontracts have the

Repair Hangar Doors Bldg. 10286 proper credentials allowing them to work in the United States. Employees and Subcontractors later found to be undocumented workers will be remanded to the proper authorities.

d. All Contractors and Subcontractors when working in a Controlled, Restricted or other sensitive areas must be escorted at all times while. The military agency or unit responsible for the project is responsible for providing the escorts. The Contractor shall follow existing procedures and instructions for obtaining entrance to restricted or controlled areas.

6. CONTRACTOR BADGE POLICIES:

a. All requests for Contractor badges will be submitted to the 773 CES point of contact.

The 773 CES point of contact will then complete an Operational Risk Management Assessment Form (ORM) for the requesting agency and submit it to the 673 SFS Pass and Registrations section for approval in accordance with Operation Plan (OPlan) 31-

101. As a minimum the ORM will be submitted 10-days prior to the requested date of employment. At no time will a contractor contact 673 Security Forces Squadron (SFS) directly regarding badge denial.

b. All Contactor employees requesting unescorted access to the Installation are required to consent to a CBI prior to being granted entry to the Installation. Continued employment is contingent upon successful completion and favorable reporting of the

CBI.

c. JBER Contractor badges will be issued for a maximum period of one year. Prior to reissuing new badges, all old badges must be returned to 673 SFS, Pass and Registration for destruction. Prior to reissuing a badge an ORM must be resubmitted to the 673 SFS Pass and Registration section for approval. In the event a badge is lost or stolen, immediately contact the 673 SFS, Pass and Registration office. The badge holder must accomplish the Loss/Theft of Identification Worksheet and provide it to his/her supervisor. The Supervisor of the Contractor will investigate the loss and report in writing the circumstances in which the badge was lost to the 673 CONS, 773 CES and 673 SFS Pass and Registration office. A new request for a badge must be completed prior to a new badge being reissued.

d. The 673 CONS or 773 CES point of contact will immediately notify 673 SFS Pass and Registration when a Contractor’s employment has been terminated. The Site Supervisors are responsible for notifying and returning the Contractor’s badge to 673 SFS Pass and Registration when this occurs.

7. INSTALLATION ACCESS:

a. The Contractor shall obtain personal Contractor identification badges for all employees and vehicle passes for all Contractor and personal vehicles requiring entry onto JBER from 673 SFS Pass and Registration, for the duration of the contract.

b. Employees are only permitted to enter the Installation during the date and time periods

FA500021R0046

Repair Hangar Doors Bldg. 10286 indicted on their Contractor badge. Vehicle registration, proof of insurance and a valid driver’s license must be presented for all vehicles while operating on the Installation.

All vehicles entering JBER are subject to search. Any refusal or non-consent by an employee will result in termination of their base access and immediate confiscation of this access badge.

c. During Force Protection Condition (FPCON) Normal and Alpha, personnel without base issued badges must be sponsored onto the installation.

e. During FPCON Bravo, Charlie and Delta, personnel without base issued identification shall be physically escorted onto the installation.

f. During Higher FPCONs (Charlie and Delta) the base will normally curtail non-essential operations/functions; access by non-essential Contract operations will be suspended as the direction of the Installation Commander.

g. Department of Defense (DoD) Contractors or Subcontractors without a Common

Access Card (CAC) or who do not have access to a Government Non-classified Internet Protocol Router Network (NIPRNET) computer performing construction on the installation should consider completing Anti-Terrorism (AT) Awareness Level I training IAW AFI 10-245, Antiterrorism, Standard 25, by completing the― Force Protection computer based training (CBT) course through the Joint Knowledge Online (JKO) Learning Management System (LMS) at http://jko.jten.mil/courses/atl1/launch.html IMPORTANT: The standalone course MUST be completed on the computer in which it is started. Course progress is not transferable between computers. The standalone course does provide a completion certificate but will not be tracked on JKO and no record will be maintained. AT Awareness Level I Training should be provided by the requiring unit after contract award or the sponsoring organization.

8. FLIGHTLINE DRIVING: Not applicable for this project.

PART I – PROJECT SPECIFIC GUIDANCE
1. SCOPE: Repair Hangar Door
1.1. PERIOD OF PERFORMANCE: The Contractor shall complete performance within 30 calendar days of the notice to proceed date.
1.2. OBJECTIVE: Return Hangar Door #3 to Operational Service
A BUILDING SITEWORK – Bldg.10286
1.3. LIMITATIONS: The contractor shall be escorted into any areas they do not have the appropriate clearance to be in as determined by the government.
2. POINTS OF CONTACT (POC): POC(s) will be provided at the time of contract award.
3. GOVERNMENT-FURNISHED INFORMATION, EQUIPMENT, MATERIAL, AND PROPERTY
A. INFORMATION – The Government shall provide basic/minimal documents describing the work required in this SOW. The Government shall provide the Contractor access to the site to include all areas of work described in this SOW.
B. EQUIPMENT – None provided.
C. MATERIAL – The Government shall provide parts and material to be repaired and returned to service.
D. PROPERTY – None Provided.
PART II – GENERIC REQUIREMENTS
1. GOVERNING DESIGN AND CONSTRUCTION DOCUMENTS
A. Department of Defense specifications and criteria are located at https://wbdg.org/ffc/dod.
B. Air Force specifications and criteria are located at https://wbdg.org/ffc/af-afcec.
C. JBER Installation Facilities Standards (IFS) is located at