Attachment 1 - SOW 90624 Vindicator upgrade 29 Apr 22.pdf
PDF 249 KB Posted
- Attached to
- ALARMED CONDUIT VINDICATOR INTRUSION DETECTION SYSTEM (IDS) INSTALLED Federal contract opportunity
- Solicitation number
- FA441722QC179
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| (Updated) RFQ - FA441722QC179 Bldg 90624 Vindicator.pdf | ||
| Attachment 2 - 1 SOCS Brand Name Justification_R.pdf | ||
| Attachment 4 - 90624 rm 220 - MDT Secure Room - Layout 26 April 22 v2.pptx | PPTX presentation | |
| RFQ - FA441722QC179 Bldg 90624 Vindicator.pdf | ||
| Attachment 3 - DWG Convert Room to Secured Area 1 SOCS B90624.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Vindicator Intrusion Detection System (IDS) Upgrade Installation 1st Special Operations Communications Squadron (1 SOCS), Building 90624 room 220
Hurlburt Field, FL 29 Apr 2022
1.0. DESCRIPTION OF SERVICES
1.1 CERTIFIED CONTRACTOR
A Honeywell-Vindicator certified contractor shall provide all necessary supervision, labor, travel, materials, tools, equipment, accessories and other items necessary to safely complete the installation of all components to Air Force standards set forth in certification standards and related safety publications:
• AFI 31-101
• Security Procedures for Head Quarters 25th Air Force
• TIA/EIA-570
• Residential Telecommunications Cabling Standards
• TIA/EIA-607, Commercial Building Grounding and bonding requirements for
Telecommunications
• NFPA 70 National Electric Code (NEC)
• NFPA 101, Life Safety Code
• NFPA 780, Standard for the installation of Lightning Protection Systems and the Security
Forces Non-Nuclear CMD list, date 13 May 2021.
The contractor will also follow any applicable UFC guidance for the project described below. The contractor shall provide all the necessary tools and equipment to complete the upgrade. This includes any ladders, lifts, hoists, power tools, safety gear or other equipment, tools, supplies necessary to complete installation and provide necessary testing of all installed components.
1.2 SYSTEM REQUIREMENTS
The contractor shall install the Vindicator Intrusion detection system (IDS) and the Vindicator door access system in building 90624, room 220. The contractor shall provide any support equipment required to integrate new intrusion detection equipment (IDE). The contractor shall install Vindicator platform. The Vindicator platform shall meet USAF Authority to Operate (ATO). The contractor shall install the IDE from the current Air Force Non-Nuclear IDS Equipment. The contractor shall install Vindicator graphical keypads that are compatible with Vindicator platform. Keypads must provide the capability to assess alarms and initiate responses in a manner that shall aid in preventing damage, destruction, or unauthorized access to the controlled resources (SCIF). The contractor shall ensure integration with the existing facility alarm system and central alarm monitoring system.
1.3 EQUIPMENT PLACEMENT
The contractor shall install and program the alarm panel, key pad, and the components to all panel locations within the alarmed facility listed in attachment 1.
Room 220 is located in an area cleared for open storage with existing access control systems and alarm systems. Room 220 is being renovated to meet security requirements for processing top secret information.
1.3.1 The diagram in Attachment 1, shows the facility office perimeter that shall be covered with sensors. The contractor shall provide and install one (1) BMS Sensor (1 door) and two (2) PIR Sensors. Evaluate existing PIR sensors and provide optimal placement recommendations to 1 SOCS by the contractor prior to installation. If existing sensors meet standards, reuse, if not, install sensors that do meet standards. The contractor shall install one (1) Vindicator door access system (door identification reader). The contractor shall coordinate any changes to panel locations through Security Forces and 1 SOCS.
1.3.2 The power and the network connectivity are located within 10 to 20 feet of the alarm panel location.
1.3.3 The contractor shall contact 1 SOSFS/S5E for coordination before any install to begin to validate all completed work.
2.0 INSTALLATION
2.1 Al l IDE components such as sensors, junction boxes, communication wiring, battery power, and line supervision shall be individually identifiable to include separate alarm points. No alarm points shall be grouped to show one name and one main area without the ability to identify which individual sensor is activated.
2.2 All alarm points shall be wired to the alarm panel counterclockwise (right) when entering the room from the main door.
2.3 All junction boxes housing IDE shall have 3 tamper protection switches located inside the box.
2.4 The IDE shall have a backup power source, such as a battery, that will provide an uninterrupted eight (8) hours of power.
2.5 Certification Test Requirements. 1 SOSFS/S5E and 1SOW/ SSO or alternate authority shall conduct functional and operational certification tests for the IDS to ensure the system meets effectiveness standards/compliance requirements.
Note: This test and certification process shall be accomplished before the IDS is deemed operational. The testing and certification shall occur in three (3) phases.
2.5.1 Phase I:
The contractor shall perform a Contractor Verification Test (CVT) upon the IDE Installation. The contractor, the 1 SOCS representative, and 1 SOSFS/S5E shall witness test Phase I. The test shall be performed in accordance with the written testing procedures provided in the Installation Design Package (IDP). Any component found to be inoperative during the test or at any time during the installation period shall be brought to the attention of the Security Forces POC, SSgt Freeman, 1 SOSFS, 850-884-7961, and Terry Porter, 1 OSCS/BOS-P
(850)884-1453/6446. Acceptance testing shall consist of the following: intrusion tests, tamper tests, annunciation test, assessment test, AC power loss test, line supervision test, sensor system self-tests, and access control.
2.5.2 Phase II:
Phase II testing is a 72-hour continuous test that ensures all equipment is installed properly and works according to specifications. It shall establish initial expectations regarding false and nuisance alarm. The AFTO 747, Communications and Information Systems Acceptance Certificate, transferring the system shall be signed after successful completion of Phase II.
AFTO 747 signifies the completion of the project and provides acceptance of the installed system. The completion of this form certifies the system has been tested and accepted as installed, and all noted exceptions shall be corrected by the responsible party to the satisfaction of the government POC / 1 SOSFS/S5E.
2.5.3 Phase III:
Phase III testing is a 30-day continuous operational test to assess how well the system performs in its normal operating mode on a permanent basis. This test is to detect any premature or latent defects in the equipment or components and to allow the operators and maintainers an opportunity to assess the adequacy of logistics support and assess the false and nuisance alarm rates of the system. After successful completion of Phase III, 1 SOCS shall request MAJCOM certification.
2.5.4 Phase II and III testing shall be completed by the Government.
2.6 NAR/FAR Rates:
2.6.1 Interior IDS:
Interior false and nuisance alarms should be extremely limited.
No more than one false alarm per individual sensor point within the previous 30 days is acceptable.
No more than three nuisance alarms per individual sensor point within the previous 30 days is acceptable.
2.6.2 Exterior IDS:
No more than one false alarm per individual sensor point within the previous 24-hour period is acceptable.
No more than three nuisance alarms per individual sensor point within the previous 24-hour period is acceptable.
2.6.3 Individual Resource IDS:
IDS configured to protect an individually exposed resource, such as an aircraft, must not have more than three false alarms or three nuisance alarms per individual sensor point within the previous 24-hour period.
2.7 The maintainer shall respond and correct issues after the 1-year warranty expires, if a negative performance trend is detected from sensors exceeding authorized nuisance and false alarm rate. The maintainer shall replace IDE, if problem continues on IDE and no cause can be determined. If problems occur before 1 year warranty expires, it is the job of the installing contractor to correct all issues prior to the 1 year warranty expiration.
2.8 The installer shall provide basic training for any altered IDE, newly installed IDE or IDS. The training shall include information on how to secure facility, how to place facility in "access" status, how to change user pin codes, how to test all alarm point/sensors and components, and the initiation of work orders through the respective installer.
The contractor shall provide the user with a user manual or any other written verbiage stating how to utilize and install the device to activate and deactivate the system.
3.0 COLLATERAL SUPPORT
3.1 The Government shall provide the following products in support of this effort;
3.1.1 Aid in acquiring related permits that may be necessary for work performed.
3.1.2 Arrange access into the installation.
3.1.3 Provide storage space/staging area for materials and an operating space with telephone capabil i ty for the installation team. Building 90220, 1 SOCS Warehouse shall act as the main staging area for large items during the installation process. Building 90624, Room 220 work site can store equipment if space is available. To request additional space contact 1 SOCS/BOSP, (850)884-6446. The government is not responsible for materials left unattended or unsecured.
3.1.4 The 1 SOCS shall provide a host escort for the contractors during the installation. The 1 SOCS shall coordinate with facility/users to ensure rooms and work areas are available when access is required.
4.0 SYSTEM MAINTENANCE
4.1 The contractor shall provide a 1 year of warranty maintenance and part replacement on all new IDE installed by contractor. The warranty shall start on the day the Government accepts the entire project.
4.2 Software Updates. The contractor shall provide any software updates required to support new IDE for a 1 year period from the date the Government accepts the entire project.
5.0 SPECIAL REQUIREMENTS
5.1 The contractor shall provide documentation for the certified Honeywell-Vindicator Installers, and the Vindicator Certification ID Numbers for Vindicator Technicians prior working on this project.
5.2 All wiring connections shall be secured using standard security connectors that meet standard fire codes for security systems. All wiring shall be clearly labeled and wiring diagram provided to Communication, Civilian Engineers and 1 SOSFS/S5E.
5.3 Infrastructure and IDE malfunctions. The contractor and Government representatives shall coordinate to troubleshoot problems during the installation and during the one-year warranty/maintenance period.
5.4 A joint quality assurance inspection shall be conducted prior to Government acceptance and system operability testing conducted.
5.5 The contractor shall assign employees who possess adequate certification to handle all required product installation tasks in order to meet OSHA, base safety requirements and annunciator certification standards. The contractor shall ensure that the product meets required safety standards at the time the project is completed and accepted by the Government. The contractor shall provide the standard commercial product warranty certificate specifying warranty period for the system on a PDF file.
5.6 All exposed IDS wires/cables shall be routed through conduit. Cabling ran through the ceiling shall be air plenum rated conduit. Additionally, the walls are not true floor to ceiling and personnel can climb from outside of secured area into the alarmed area, so all wiring MUST be in conduit.
5.7 The IDE must be tamper protected, there are junction boxes housing wiring for connectivity or power above the ceiling and are able to be tampered with (as mentioned above in paragraph 5.6). For SCIF’s there must be three-(3) tamper buttons on the Panel enclosure.
5.8 The contractor shall develop an installation schedule and coordinate it with the 1 SOSFS/SSE POC and the 1 SOCS POC prior to work being accomplished. Installation scheduling coordination may take up to 48 hours to coordinate with subordinate units. If schedule requires changing, the contractor should make every attempt to adhere to the 48 hours prior to notification change request.
6.0 SECURITY REQUIREMENTS
6.1 The contractor shall always comply with base security requirements to include base pass requirements and personnel security clearance.
6.2 (a)The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor will be required to complete a Contractor Employee Listing (to be provided by the government) in order for employees to gain access to the installation:
(i) The Contractor Employee List. This form must list every employee requiring access.
Every time employees change; it must be updated to reflect additions and/or deletions.
Identify those individuals you wish to have escort authority by including the word “Escort” or “E” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e. one or two). For work locations please use building numbers or areas (i.e. Bldg 90624/Data Center). Once completed, send the list to the Contracting Office representative in EXCEL format using secure means such as hand carry, mail, or electronic mail. The Contracting Officer will then prepare and attach a cover letter and forward the Employee List to the Visitor Control Center.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel Security Program Management, citing the appropriate paragraphs as applicable.
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
6.3 Retrieving Identification Media. The contractor shall be responsible for retrieving all identification media including visitor passes from employees who depart for any reason before the contract expires. For example, termination for cause, retirement, etc… Visitor passes shall be retrieved and turned into 1SOSFS Pass and Registration/Visitor Center once the contractor and its employees leave the base for the last time.
6.4 Traffic Laws. The contractor and employees shall comply with base traffic regulations.
6.5 Weapons, Firearms, Ammunition. The contractor employees are prohibited from possessing weapons, firearms, or ammunition or within the contractor vehicle or privately owned vehicles while on the Government installation.
6.6 Contractor employees performing work in the controlled areas described as Open Secret Storage Area (OSSA) must meet prescribed requirements IAW DoDM 5200.0 l , Volume 3, Enclosure 3, Para 2.a.( l). "IDS Installation and Maintenance Personnel. Alarm installation and maintenance shall be accomplished by U.S. citizens who have been subjected to a trustworthiness determination (NACI) according to Reference (l)." The contractor shall provide information of individuals to government for clearance verification prior to commencing work.
7.0 FAILURE RESPONSE AND REPAIR TIMES
7.1 The Contractor shall respond to and restore failures at fielded locations in a reasonable amount of time.
7.2 Response Time is defined as a measurement of the total elapsed time between the issuance of a customer work order and telephonic IDS problem resolution or contractor maintenance personnel arrival at the requesting base. When the contractor is unable to resolve work order issues telephonically or when directed by ESS NCO, the installing contractor must respond in person to fix issues in a reasonable amount of time. Response times should not exceed 48 hours for a partial failure and 24 hours for a major failure.
7.2.1 Response time shall begin at the time a technician is called to respond to a work order that cannot be rectified telephonically by base SF personnel.
7.3 MEAN TIME TO REPAIR (MTTR)
7.3.1 The contractor shall have the IDE repaired within a reasonable amount of time. Barring extreme circumstances the IDE should be repaired to full capability within 72 hours of the contractor arriving.
End of SOW
Attachments:
1. DWG _ Convert Room to Secured Area, 1 SOCS, B90624
2. 90624, rm 220 – MDT Secure Room - Layout