Attachment_1_-_SOW_1.pdf

PDF 83 KB Posted

Attached to
BLM-CO Communications Tower Reinforcement Federal contract opportunity
Solicitation number
140L1722Q0009
Issued by
Department of the Interior Bureau of Land Management Colorado Region

View the file

Other files for this federal contract opportunity

Other files attached to BLM-CO Communications Tower Reinforcement, newest first.
File Type Posted
Attachment_2_-_Drawings_and_Specs_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL INFORMATION AND REQUIREMENTS

GAOA HILL 71 TOWER REINFORCEMENT Rev. 03-22

01009 - 1

SECTION 01009

PART 1: GENERAL

1.01 SUMMARY:

A. Description of Work: Furnish labor, equipment, supplies and materials to strengthen the footing for the radio tower at Hill 71. All work shall be in accordance with these specifications.

B. Location: Work under this Contract is near Lake City in Hinsdale County, Colorado.

1.02 SUBMITTALS:

A. Scope: Submittals include design computations, manufacturers' literature, and samples.

B. Requirements: Refer to each specification sections and drawings for a complete list of submittals required. Allow at least 10 working days for review. The preconstruction conference will not be scheduled until all submittals have been submitted, accepted, and approved. Submittals shall be emailed to Dave Dickman DDICKMAN@BLM.GOV

1.03 QUALITY ASSURANCE:

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.

1.04 DELIVERY, STORAGE, AND HANDLING:

A. Delivery: The Contractor shall protect products, incorporated into the work, from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name and brand designation and contents legibly indicated.

B. Storage: The Contractor shall provide temporary storage facilities for products complying with manufacturer's recommendations which will protect them from damage until installation on the project and final acceptance. The storage area shall permit access for inspection and handling.

1.05 PROJECT/SITE CONDITIONS:

A. Access to the Work: Access to the work shall be provided by and at the

Contractor's expense. The Contractors work hours shall be limited to the mailto:DDICKMAN@BLM.GOV

01009 - 2 hours between 07:00 A.M. and 05:00 P.M.

B. English Speaking: Each shift shall have a supervisor, on site, who is fully capable of fluently speaking, writing, and reading the English language.

This person must be able to effectively communicate with the rest of the crew and the Project Inspector. The job will be shut down immediately when this requirement is not being met.

1.06 SEQUENCING AND SCHEDULING:

A. Requirements: The Contractor shall be responsible for operations necessary to complete the work, including coordination with other crafts relative to the Contractor's requirements. Work shall be scheduled in such a manner as to avoid delays in overall construction and permit proper installation of work.

B. Work Schedule: This schedule shall be submitted at the pre-work conference.

When requested, the Contractor shall submit an updated schedule within 2 calendar days. the size and types of crews that will be working at each site and the days they will work, the work hours (i.e., 8:00 a.m. to 4:00 p.m.), The work schedule must be signed by the Contractor. No work will be allowed on Saturdays, Sundays, or Holidays, unless approved in writing by the Project

Inspector.

PART 2: PRODUCTS

A. Name Brand Products: See contract specifications and drawings for products required in this contract.

PART 3: EXECUTION

3.01 PROJECT MEETINGS:

A. Pre-Work Conference:

1. Notification: A pre-work conference will be held prior to the start of work. The Project Inspector will set the meeting time and date. The meeting will be at the work site. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.

2. Attendance: The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

3. Presentation: The Contractor shall be prepared to summarize and explain procedures planned for the project

4. Submittals: No prework meeting will be scheduled until all requirements of 1.02 Submittals have been fulfilled. However, purposely withholding submittals will not be allowed in an attempt on the Contractors part to delay the start of Contract work.

01009 - 3

5. Work schedule: Work schedule shall be submitted at the pre-work conference.

B. Progress Meetings:

1. Location: Meetings shall be held at the project site.

2. Notification: Meetings may be called by either the Project Inspector or the Contractor. Request shall state who should attend.

C. Final Inspection:

1. Location: Meeting shall be held at the project site.

2. Notification: The Contractor shall notify the Project Inspector/COR in writing at least 5 working days before the completion date so the

Government can schedule final inspection.

3. Attendance: The Contractor shall require the site superintendent for this job to be present during this inspection.

3.02 WORK LAYOUT:

A. Requirements: Contractor shall layout the work as shown in the contract drawings.

B. Work Limits: Shall be confined to the area immediately adjacent to the existing tower site.

PART 4: MEASUREMENT AND PAYMENT

4.01 METHOD OF MEASUREMENT:

A. Units: All work in these specification sections and drawings will be measured for payment on a complete lump sum basis for all work described and accepted for a complete strengthening of the tower footings.

4.02 BASIS OF PAYMENT:

A. Payment: Prices and payment will be full compensation for the work described in this Contract. Payment will be made under:

Pay Item Pay Unit

10990(10) Strengthen Tower Footings. . . . . . . . . . . . . . . . . . . . LS

END OF SECTION