ATTACHMENT 1 - SOLE SOURCE DOC_Redacted.pdf
PDF 1 MB Posted
- Attached to
- BOLT, 12-POINT Federal contract opportunity
- Solicitation number
- SPMYM4-24-Q-0560
About this file
This document is a Sole Source Determination Memo, which explains the justification for limiting competition to a single source for a federal contract opportunity. The requirement is for the procurement of specific aerospace fasteners from Vegas Fastener Manufacturing. The key details are:
The fasteners are only available from Vegas Fastener Manufacturing due to the company's proprietary rights, patents, and exclusive licensing agreements. Market research indicates other manufacturers' products cannot meet the government's technical requirements. The procurement is considered an urgent requirement necessary to prevent delays, cost increases, and impacts to the mission. The solicitation number is SPMYM4-24-Q-0560 for a Request for Quote (RFQ) issued by the Defense Logistics Agency Land and Maritime for the specified aerospace fasteners. The solicitation closes on June 26, 2024 at 12:00 PM Hawaii Standard Time.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 2 - DRAWINGS.pdf | ||
| S1. SPMYM4-24-Q-0560.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEMORANDUM TO THE FILE
SUBJECT: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION
UNDER THE SIMPLIFIED ACQUISITION THRESHOLD
I. BACKGROUND
1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name, or industrial mobilization).
2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.
II. DESCRIPTION OF ITEM OR SERVICE
Manufacturer or Service Provider: ___________________________________________________
Point of Contact: __________________________ Phone Number: ________________________
Street: _________________________________________________________________________
City: _______________________ State: ________________ Zip Code: ________________
Dealer Representative (if applicable): ________________________________________________
Point of Contact: __________________________ Phone Number: ________________________
Street: _________________________________________________________________________
City: _______________________ State: ________________ Zip Code: ________________
Estimated Cost: ______________________
Required Delivery Date or Period of Performance: _________________________
Provide a description of the item or service required, to include its intended use. If applicable, provide manufacturer part number.
VEGAS FASTENER MANUFACTURING
1) PN 243599: 1-12UNRF-2A X 3-3/4 12PT FLANGE BOLT, 13-8MO
2) PN 243600: 7/8-14UNJF-3A X 13, 12PT FLANGE BOLT 13-8MO
3) PN243601: 3/4-16UNJF-3A X 12, 12PT FLANGE BOLT 13-8MO
III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN
COMPETITION IS BASED ON THE FOLLOWING: (select all that apply):
A. ☐ ONLY ONE RESPONSIBLE SOURCE (select all that apply):
1. ☐ RESTRICTIVE RIGHTS
The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.
Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.
2. ☐ EXCLUSIVE LICENSING AGREEMENTS
The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.
Explain the circumstances surrounding why the item or service is only available from the manufacturer or service provider.
OR
Provide evidence of the exclusive licensing agreement as an attachment to this document.
NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank.
3. ☐ OTHER REASONS
Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.
B. ☐ BRAND NAME
Item required must be a brand name product, or feature of a product, particular to one manufacturer.
Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.
Vegas Manufacturing Inc is the only source able to provide the fasteners required for the work that is to be performed. If procuring from other vendors, the material required/received will not meet the projects requirements and cause significant delay in schedule and rise in cost and man days.
C. ☐ UNUSUAL AND COMPELLING URGENCY
The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:
1. Date on which the requirement was first identified: _______________________________
2. Explanation of why delivery/commencement of services by the date mentioned above is required:
Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.
3. If appropriate, include any additional pertinent information.
Fasteners are required urgently to prevent delay in scheduling and rise in cost and man days. Need date was established previously, however, local engineering concurrence and clarification was required prior to procurement.
File details come from the government source that posted it. Updated .