Attachment 1 - Schedule of Services - Blank Price Schedule.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Drydock (DD): USCGC CUTTYHUNK (WPB-110B) Availability Federal contract opportunity
- Solicitation number
- 70Z080QP4531300
About this file
This document contains a price schedule and statement of work for a scheduled drydock availability solicitation from the U.S. Coast Guard. The solicitation seeks maintenance and repair services for the USCGC CUTTYHUNK (WPB-110B) from June 1, 2021 to October 12, 2021. The price schedule lists over 50 items of work to be performed including hull plating inspection and preservation, tank cleaning and inspection, propulsion system overhaul, generator renewal, deck preservation, and cathodic protection system maintenance. A composite labor rate is also requested for additional growth work. Respondents should provide unit prices for each item as well as extended total pricing for definite and optional items. The solicitation is designated number 70Z080QP4531300 and is issued by the Department of Homeland Security on behalf of the U.S. Coast Guard.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 1 Cuttyhunk with Questions.pdf | ||
| Attachment 2 - Statement of Work (Specification Rev. 0).pdf | ||
| Combined Synopsis Solicitation - USCGC CUTTYHUNK FY21 DRYDOCK.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: CONTRACTOR NAME HERE |
| USCGC CUTTYHUNK (WPB-110B) DRY DOCK AVAILABILITY FY2021 |
| RFQ: 70Z08021QP4531300 |
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | FUNDING |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | $0.00 | 45 | |
| D-002 | Hull Plating (U/W Body), Inspect | JOB | 1 | $0.00 | 45 | |
| O-003 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $0.00 | 45 | |
| D-004 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | 30 | |
| D-005 | Appendages (U/W), Leak Test | JOB | 1 | $0.00 | 45 | |
| O-006 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $0.00 | 45 | |
| D-007 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | $0.00 | 45 | |
| D-008 | Voids (Non-Accessible), Leak Test | JOB | 1 | $0.00 | 45 | |
| O-009 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | $0.00 | 45 | |
| D-010 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | 45 | |
| D-011 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | 45 | |
| O-012 | Forward Void, Preserve | JOB | 1 | $0.00 | 45 | |
| O-013 | Tanks (Dirty Oil), Preserve “100%” | JOB | 1 | $0.00 | 45 | |
| O-014 | Tank (Oily Water), Preserve “100%” | JOB | 1 | $0.00 | 45 | |
| D-015 | Main Mast, Preserve, 100% (Without ESU-C4IT) | JOB | 1 | $0.00 | 30 | |
| D-016 | Propulsion Shafting, Remove, Inspect, And Reinstall | JOB | 1 | $0.00 | 45 | |
| D-017 | Alignment Survey, Conduct | JOB | 1 | $0.00 | 45 | |
| D-018 | Mechanical Shaft Seal Assemblies, Overhaul | JOB | 1 | $0.00 | 45 | |
| O-019 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | $0.00 | 45 | |
| O-020 | Propulsion Shaft, Stern Tube Forward Bearing, Renew | JOB | 1 | $0.00 | 45 | |
| O-021 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | 45 | |
| D-022 | Propellers; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | 45 | |
| D-023 | Exhaust Piping System, Inspect | JOB | 1 | $0.00 | 45 | |
| D-024 | Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | $0.00 | 45 | |
| D-025 | Ship Service Diesel Generator(s) (John Deere), Renew | JOB | 1 | $0.00 | 45 | |
| D-026 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | 45 | |
| D-027 | Speed Doppler, Remove, Inspect, and Reinstall - Doppler Valve, Overhaul | JOB | 1 | $0.00 | 45 | |
| D-028 | Sea Valves , Overhaul Or Renew | JOB | 1 | $0.00 | 45 | |
| D-029 | Sea Strainers - (All Sizes), Overhaul | JOB | 1 | $0.00 | 45 | |
| D-030 | Steering Gear (General), Overhaul | JOB | 1 | $0.00 | 45 | |
| D-031 | Rudder Assembly, Remove, Inspect and Reinstall | JOB | 1 | $0.00 | 45 | |
| D-032 | Fin Stabilizers (General), Overhaul | JOB | 1 | $0.00 | 45 | |
| D-033 | Grey Water Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | 45 | |
| D-034 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $0.00 | 45 | |
| D-035 | Grey Water Piping, Clean And Flush | JOB | 1 | $0.00 | 45 | |
| D-036 | Sewage Piping, Clean And Flush | JOB | 1 | $0.00 | 45 | |
| O-037 | Tanks (Sewage Holding), Preserve “100%” | JOB | 1 | $0.00 | 45 | |
| O-038 | Tanks (Grey Water Holding), Preserve “100%” | JOB | 1 | $0.00 | 45 | |
| D-039 | Tanks (Potable Water), Preserve “100%” | JOB | 1 | $0.00 | 45 | |
| D-040 | Battery Space, Preserve and Insulate | JOB | 1 | $0.00 | 45 | |
| D-041 | Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System) | JOB | 1 | $0.00 | 30 | |
| D-042 | U/W Body, Preserve (100%) Used with Side Scan) | JOB | 1 | $0.00 | 45 | |
| D-043 | Superstructure, Preserve “100%” | JOB | 1 | $0.00 | 30 | |
| D-044 | Cathodic Protection System (Bilge and Sea Chest), Renew | JOB | 1 | $0.00 | 45 | |
| D-045 | Impressed Current Cathodic Protection System, Inspect And Maintain | JOB | 1 | $0.00 | 45 | |
| D-046 | Floating Deck System, Aft Berthing, Renew | JOB | 1 | $0.00 | 45 | |
| D-047 | Drydock | JOB | 1 | $0.00 | 45 | |
| D-048 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | 45 | |
| D-049 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | 45 | |
| D-050 | Deck Covering System (Galley and Mess Deck), Modify | JOB | 1 | $0.00 | 45 | |
| D-051 | Bilge, Machinery Space, Preserve | JOB | 1 | $0.00 | 30 | |
| D-052 | Piping, Sewage Discharge, Renew | JOB | 1 | $0.00 | 45 | |
| D-053 | Hull, Structural Closures, Renew | JOB | 1 | $0.00 | 45 | |
| D-054 | Electro-Hydraulic Crane, Renew | JOB | 1 | $0.00 | 45 | |
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
| Composite Labor Rate for Growth Work | Hour |
| Laydays | Daily Rate |
| Temporary Services, Provide - Cutter | Daily Rate |