Attachment 1 Schedule of Services Blank Price Schedule.xls
XLS spreadsheet 33 KB Posted
- Attached to
- DRYDOCK (DD): USCGC STEADFAST (DDL) DD FY23 Federal contract opportunity
- Solicitation number
- 70Z080-22-Q-MECP0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Statement of Work Specification.pdf | ||
| RFQ SHIP REPAIR COMBINED SYNOPSIS STEADFAST DD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC STEADFAST (WMEC-210B) DRYDOCK AVAILABILITY FY2023 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating, Side Scan, Ultrasonic Testing | JOB | 1 | ||
| D-002 | Hull Plating, U/W Body, Ultrasonic Testing | JOB | 1 | ||
| D-003 | U/W Body, Preserve, 100 percent | JOB | 1 | ||
| D-004 | Hull Plating Freeboard, Preserve, Partial | JOB | 1 | ||
| D-005 | Appendages (U/W), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-006 | Propulsion Shaft Fairwaters And Rope Guards, Inspect | JOB | 1 | ||
| D-007 | Voids (Non-Accessible), Preserve (Internal) and Leak Test | JOB | 1 | ||
| D-008 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | ||
| D-009 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-010 | Propulsion Intermediate Shafts; Remove, Inspect, and Reinstall | JOB | 1 | ||
| O-011 | Propulsion Shaft Coating, Renew | JOB | 1 | ||
| O-012 | Propulsion Shafting, Straighten | JOB | 1 | ||
| O-013 | Propeller Shaft Sleeves, Renew | JOB | 1 | ||
| O-014 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | ||
| D-015 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | ||
| D-016 | Propulsion Shaft Bearings, External, Renew | JOB | 1 | ||
| D-017 | Propulsion Stern Tube Bearings, Renew | JOB | 1 | ||
| O-018 | Stern Tube Interior Surfaces, Preserve, 100 Percent | JOB | 1 | ||
| D-019 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | ||
| D-020 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | ||
| D-021 | Controllable Pitch Propeller (CPP) Hubs, Remove, Inspect and Reinstall | JOB | 1 | ||
| D-022 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-023 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | ||
| D-024 | Sea Strainers, Duplex, All Sizes, Overhaul | JOB | 1 | ||
| D-025 | Rudder Assembly, Remove, Inspect And Reinstall | JOB | 1 | ||
| D-026 | Superstructure, Preserve, Partial | JOB | 1 | ||
| D-027 | Cathodic Protection, Zinc Anodes, Renew, | JOB | 1 | ||
| D-028 | Drydock | JOB | 1 | ||
| D-029 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| D-030 | Fire Pumps, Replace | JOB | 1 | ||
| D-031 | Ships Service and Shore Tie Circuit Breakers, Upgrade | JOB | 1 | ||
| D-032 | Doppler Speed Log, Replace | JOB | 1 | ||
| D-033 | Deep Water Sounder, Remove | JOB | 1 | ||
| D-034 | Bilges, Preserve | JOB | 1 | ||
| D-035 | SSDG Cabling, Renew | JOB | 1 | ||
| D-036 | Deck Covering, Dielectric Matting, Renew | JOB | 1 | ||
| D-037 | Tanks, MP Fuel Storage and Overflow, Preserve 100 Percent | JOB | 1 | ||
| D-038 | Watertight Doors, Internal, Renew | JOB | 1 | ||
| D-039 | Watertight/Weathertight Doors, External, Renew | JOB | 1 | ||
| D-040 | Fuel Piping, Renew | JOB | 1 | ||
| D-041 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | ||
| D-042 | Tanks, Potable Water, Repair and Preserve | JOB | 1 | ||
| D-043 | Exhaust Piping, Clean and Inspect | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 1 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| O-00Z | Laydays | Day | |||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(5/12/2022) Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .