Attachment 1 - Schedule of Services Bernard Webber DS.xls

XLS spreadsheet 60 KB Posted

Attached to
Dockside (DS): USCGC Bernard Webber Federal contract opportunity
Solicitation number
70Z08023QPBPL0001
Issued by
Department of Homeland Security US Coast Guard

About this file

This document contains a schedule of services and pricing for the dockside availability of the USCGC Bernard Webber scheduled from April 18, 2023 to June 22, 2023. The Coast Guard requires services including assessment of watertight closures, cleaning and inspection of tanks, bilge surfaces and piping, electrical power distribution system thermographic inspection, machinery ventilation system cleaning, HVAC duct system cleaning, sewage and grey water system cleaning and inspection, interior wet deck covering resealing, renewal of port and starboard ship service diesel generators, 8000 hour maintenance of the MDE, and preservation of the grey water tank. Pricing is provided for labor rates and individual line items, with a total projected price of all definite and optional items. The availability will be conducted at the vessel's homeport of Miami Beach, Florida.

View the file

Other files for this federal contract opportunity

Other files attached to Dockside (DS): USCGC Bernard Webber, newest first.
File Type Posted
Combined SS USCGC Bernard Webber_Final.pdf PDF
Attachment 2 Statement of Work - Specification Rev-1 15 February 2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BERNARD WEBBER DS

PRICING SCHEDULE FOR:
USCGC BERNARD C. WEBBER (WPC-1101) DOCKSIDE AVAILABILITY FY2023
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Watertight Closures, AssessJOB1$0.00
D-002Tanks, Clean and InspectJOB1$0.00
D-003Electrical Power Distribution System, Thermographic Inspection (450 VAC And Below)JOB1$0.00
D-004Bilge Surface and Piping, Clean and InspectJOB1$0.00
D-005Machinery Ventilation System, CleanJOB1$0.00
D-006HVAC Duct System, CleanJOB1$0.00
D-007Sewage and Grey Water System, Clean and InspectJOB1$0.00
D-008Interior Wet Deck Coverings, ResealJOB1$0.00
D-009Port and Starboard Ship Service Diesel Generators, RenewJOB1$0.00
D-010MDE, 8000 Hour Maintenance (QL3), PerformJOB1$0.00
D-011Grey Water Tank, Preserve (Opt)JOB1$0.00
O-00AComposite Labor RateHour0
O-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB1$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(10/3/2022) Draft-1 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .