About this file
This document includes a statement of work and sources sought notice for an automated robotic paint application system. The Marine Corps Logistics Base in Albany, Georgia is seeking to purchase and install a fully functional robotic paint system including two ABB IRB 5500 7-axis robots, rails, spray guns, controllers and associated equipment. Responses to the sources sought will be used to identify potential vendors for this turnkey project and obtain feedback on technical specifications, subcontracting plans, and pre-existing contracts that could meet this requirement. Responses are due by the date specified on betaSAM. The statement of work provides further details on the scope of work, execution plan, general requirements and specifications for engineering, installation, training and acceptance of the robotic paint system.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Production Plant Albany
MARINE CORPS LOGISTIC BASE
ALBANY, GEORGIA
Purchase & Install an Automated Robotic Paint Application System
STATEMENT OF WORK
General Description: Furnish and install a fully functional automated robotic paint application system for the production facility at MCLB Albany, GA.
1.1 Item Description: Automated paint application system
Manufacture: ABB, 2 ea IRB 5500 7 axis robots, elevated rails, spray guns, controllers, and associated equipment or equivalent manufacturer/model Part / Model #:
| Color: | USMC Approved | |
| Unit of Issue: | Each | |
| Quantity: | 1 |
1.2 The exact location will be shown by the designated Government representative. Contractor shall verify all measurements prior to ordering materials. All work shall be accomplished in strict accordance with prevailing industry standards, manufacturer’s written instructions and all applicable codes.
1.3 All work requiring energy shall be done in compliance with OSHA 29 CFR 1910.147 and 1910.333 lock out tag out procedure. All electrical work shall comply with current NEC as well as local codes.
2.0 Scope of Work: The contractor shall provide all labor, tools, materials, equipment, safety measures, supervision and all associated permits and services to complete the work to furnish, install, and start-up of fully functional automated robotic paint application system at MCLB Albany, GA. Contractor is responsible for the purchase of the system and all miscellaneous materials needed to install a fully functional automated robotic paint application system.
2.1 Provide engineering and Facility Maintenance and Safety Specifications Package.
2.2 Connect system to base power.
2.3 System start-up and functions check.
2.4 In-plant training for government operators and safety personnel.
2.5 Final inspection per government end user acceptance.
3.0 Execution
3.1 Start date to be coordinated with the customer.
3.2 Place of Performance: The production facility at MCLB Albany, GA.
3.3 Security Requirements: Contractor shall adhere to current installation security policies.
3.4 Government Furnished Property (GFP) and Services: The US Government will not provide any equipment, fuel, personnel, utilities or facilities to the contractor for the execution of this contract. Should an emergency arise, only the necessary basic lifesaving and life support measures will be provided during an emergency.
3.5 Government Point of Contact (POC): Will be disclosed if/once and RFQ is issued
4.0 General Requirements
4.1 Contractor shall cleanup work sites daily and properly dispose of debris off of Government property.
4.2 The work shall be performed in such a manner as to cause the least interference with the normal functions of the Government activity. Work areas will be cleared/vacated for the period of time necessary for the Contractor to perform work; however, the Building will be occupied during the course of work.
4.3 Prior to beginning any work, the Contractor shall meet with the designated Government representative to discuss and develop mutual understandings relative to scheduling and administering work. All work shall be accomplished within 150 calendar days after date of award. This completion time includes 14-day period for checking background of the contractor’s personnel prior to arrival to start work on Base. All asbestos abatement and removal shall be accomplished on weekends and holidays. All other work shall be accomplished between the hours of 8:00 a.m. and 5:00 p.m., Monday thru Friday (excluding federal holidays) unless otherwise specified in the requirements section and specifically pre-arranged with the Contracting Officer. This requires a written request two (2) days prior to proposed work.
4.4 Work shall be accomplished by personnel experienced in their respective trades. The Contractor shall perform all work in accordance with acceptable industry standards and all federal, state, and local codes.
4.5 All work requiring energy (electrical, mechanical, hydraulic, pneumatic, chemical, thermal or other) removal shall be done in compliance with OSHA 29 CFR 1910.147 and 1910.333 lock-out/tag-out procedures for worker protection. No work will be performed on energized electrical circuits unless proof is provided that no other means exist. NFPA 70E (current edition), Standard for Electrical Safety in the Workplace, shall also be utilized for worker safety compliance.
4.6 Except where specifically specified otherwise herein, all salvable materials and equipment disconnected or removed during the course of the work and not indicated or specified for reuse on the new work shall remain the property of the Government. All recyclable materials such as metals, pipes, pumps, engines, motors, and certain electrical components, to include switch gear, MCCs, conduit, copper wire, distribution and control panels, nuts, bolts, washers, old motor starters, obsolete breakers, cable lugs, conduit, conduit fittings, connection boxes, etc. will be recycled in accordance with MCO 5090.2A through the base Qualified Recycling Program (QRP). Remaining material shall be removed from the Government property. Contractor will disassemble or cut recyclable material to fit into roll-off containers or on flat bed trailers. With no part of the items hanging off the trailers or protruding out of the top of the containers.
4.7 Prior to performing "Hot Work" (welding, cutting, etc.) or operating other flame-producing/spark producing devices, a written permit shall be requested from the Fire Division. CONTRACTORS ARE REQUIRED TO MEET ALL CRITERIA BEFORE A PERMIT IS ISSUED. The Contractor will provide at least two (2) ten (10) pound 4A:80 BC rated extinguishers for normal "Hot Work". All extinguishers shall be current inspection tagged, approved safety pin and tamper resistant seal. It is also mandatory to have a designated FIRE WATCH for any "Hot Work" done at this activity. The Fire Watch shall be trained in accordance with NFPA 51B and remain on-site for a minimum of 1 Hour after completion of the task or as specified on the hot work permit. When starting work in the facility, Contractors shall require their personnel to familiarize themselves with the location of the nearest fire alarm boxes and place in memory the EMERGENCY FIRE phone number 229-639-5911. ANY FIRE, NO MATTER HOW SMALL, SHALL BE REPORTED TO 229-639-5911 IMMEDIATELY.
END OF SOW
File details come from the government source that posted it. Updated .