Attachment 1 -PWS- Laser Techniques.pdf
PDF 133 KB Posted
- Attached to
- Eddy Test Stand Federal contract opportunity
- Solicitation number
- W911KF-22-Q-0023
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - ACC-ANAD COVID Letter.pdf | ||
| 22-Q-0023 Solicitation.pdf | ||
| Attachment 2 -Evidence of Authority To Sign Offers.pdf | ||
| Attachment 3 -SioanForm380-2 Personal Data Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
FOR
Eddy Current (EC) Inspection System Upgrade – 60mm Mortar
June 9, 2021
General Information
1.0 Introduction The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to upgrade the existing
LP-4000™ Instrument and external motor control unit (MCU) to the new LP-5000™ Data
Acquisition instrument.
The Government will ship the existing LP-4000™ Instrument and external motor control unit
(MUC) to Laser Techniques CO. (LTC) located at 11431 Willows Road NE, Suite 100.
Redmond, WA 98052.
The Government will be responsible for shipping the existing LP-4000™ Instrument and external motor control unit (MCU) to 11431 Willows Road NE, Suite 100. Redmond, WA 98052.
LTC shall be responsible for all shipping costs returning the new LP-5000™ Data Acquisition instrument to Anniston Army Depot, Building 31, 7 Frankford Ave. Anniston, Al 36201.
2.0 Scope LTC shall confirm the functionality of the LP-4000™ Instrument and external motor control unit upon receipt and identify any issues with performance or usability. LTC shall notify the Government if any components are damaged or non-functional. LTC will upgrade the
Government owned EC inspection station by performing the following tasks:
2.1 A gearhead shall be added to the vertical delivery stand in place of the brake. This allows for compatibility with the LP-5000™ and improves the maximum linear scan resolution. Sensor
ID shall be added to the Linear Motor Cable. This allows for automatic identification of components and configuration of the inspection software.
2.2 Sensor ID will be added to the EC Sensor. This allows for automatic identification of components and configuration of the inspection software.
2.3 A buffer board (signal amplifier) shall be added to the EC sensor. This will improve the signal-to- noise ratio by a factor of 3-4 and decrease the crosstalk between signals.
2.4 All cable connectors will be potted to increase durability.
2.5 The USB LaserViewer™ key will be converted to a “soft license” and will be installed on the LP-5000™ instrument.
2.6 LTC shall have the US-454A or EddyView Premium instrument calibrated by Uniwest.
3.0 SPECIFIC TASKS
3.1 LTC will confirm the functionality of all returned components upon receipt and identify any issues with performance or usability. LTC will notify the client if any components are damaged or non-functional.
3.2 LTC shall upgrade the Government owned EC inspection station by performing the following tasks: A gearhead will be added to the vertical delivery stand in place of the brake.
This allows for compatibility with the LP-5000™ and improves the maximum linear scan resolution.
3.3 Sensor ID will be added to the Linear Motor Cable. This allows for automatic identification of components and configuration of the inspection software.
3.4 Sensor ID will be added to the EC Sensor. This allows for automatic identification of components and configuration of the inspection software.
3.5 A buffer board (signal amplifier) will be added to the EC sensor. This will improve the signal-to- noise ratio by a factor of 3-4 and decrease the crosstalk between signals.
3.6 All cable connectors will be potted to increase durability.
3.7 The USB Laser Viewer™ key will be converted to a “soft license” and will be installed on the LP-5000™ instrument.
3.8 LTC shall have the US-454A or Eddy View Premium instrument calibrated by Uniwest.
4.0 Period of Performance
The period of performance shall commence on the date of award. The contractor shall complete the installation of equipment and acceptance made within 90 calendar days after award of the contract.
5.0 Delivery and Installation
Contractor shall deliver and install the new LP-5000™ Data Acquisition instrument. An LTC engineer shall travel to Anniston Army Depot to perform on-site installation, set up, and integration.
Contractor shall test the newly installed software to validate the system performance.
6.0 Manuals
Two (2) hard copies and two (2) electronic copies of operation and maintenance manuals shall be provided. Electronic copies shall be provided in Adobe Acrobat PDF format.
7.0 Training
An LTC engineer shall travel to Anniston Army Depot to perform on-site training for the upgraded LP-
5000™ Data Acquisition instrument. The engineer shall be on-site for 5 days for additional training.
8.0 Acceptance and Testing
The Government will accept the upgraded LP-5000™ Data Acquisition instrument only after the contractor successfully completes the requirements of this PWS. Final acceptance will be at
Anniston Army Depot. Failure to meet the requirements with in the PWS shall be cause for rejection.
The following are minimum testing requirements for the upgraded LP-5000™ Data Acquisition instrument:
Contractor shall complete a factory test at 11431 Willows Road NE, Suite 100. Redmond, WA
98052 and an onsite test at Anniston Army Depot, building 31. Both tests shall consist of a successful Standard Test of a 60mm Mortar Cannon. A Certified Test Report shall be provided to the Government upon completion of each test.
For the factory test, the Government will ship one (1) 60mm Mortar Cannon to the factory. Upon completion of the test, LTC will be responsible for shipping costs to return the Cannon back to Anniston Army Depot.
9.0 Quality Control
The contractor shall ensure that work complies with the requirement of the contract and PWS.
Surveillance and inspection will be conducted by the Government. Any deficiencies found shall be corrected in a timely manner.
10.0 Warranty
Contractor shall provide a standard one-year warranty for the new equipment installed.
Warranty will commence upon successful startup, test, and checkout of installed equipment.
11.0 PROJECT SCHEDULE
The Contractor will develop a project schedule detailing Milestones that will be submitted with their response to this PWS.
12.0 Security Requirements All contractor and service personnel visiting Small Arms
Divisions at Anniston Army Depot must have US citizenship and provide one form of valid photo
ID for entrance onto ANAD. All personnel will require an escort at all times.
13.0 Scope Changes. The Contractor shall not proceed with any verbal or written change(s) to the scope of work from sources other than the Contracting Officer, who will provide changes in writing.