Attachment 1 - Performance Work Statement.pdf

PDF 342 KB Posted

Attached to
36 CES/LRS Portable Office Space (POS) Rental Federal contract opportunity
Solicitation number
FA524023Q3015
Issued by
Department of the Air Force Pacific Air Forces

About this file

This performance work statement outlines requirements for portable office space rentals at Andersen Air Force Base in Guam to support recovery efforts from Typhoon Mawar. The Air Force seeks to rent two double-wide portable office spaces measuring 16 feet by 45 feet each on a period of performance not to exceed eight months. The spaces must include furnishings such as desks, chairs, appliances, and for some options, generators. Delivery is required within two weeks of award. The contractor must submit mobilization, demobilization, and base access plans. This opportunity relates to solicitation number FA524023Q3015 issued by the Department of the Air Force Pacific Air Forces for portable office space rentals at Andersen Air Force Base to support recovery from Typhoon Mawar. Requirements include delivery, installation, generator provisions if specified, furnishings, site visits, safety plans, and demobilization services over an eight-month period.

View the file

Other files for this federal contract opportunity

Other files attached to 36 CES/LRS Portable Office Space (POS) Rental, newest first.
File Type Posted
Amendment_0001_MFR___FA524023Q3015.pdf PDF
Questions and Answers_10AUG23.pdf PDF
Attachment 2 - Clauses and Provisions.pdf PDF
Attachment 3 - Offer Details (Quote Sheet).xlsx XLSX spreadsheet
FA524023Q3015 Combined Synopsis-Solicitation-final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

PORTABLE OFFICE SPACE

Requirements: Portable Office Space rentals to include Mobilization/De-Mobilization, Installation/De- Installation, footings/tie downs, Removal, generator/fuel (if needed), furnishings, and step or deck for use as office and maintenance workspace at Andersen AFB, Guam.

Period of Performance: NTE 8 Months after Contract Award Date.

Portable Office Spaces (POS) are needed as soon as possible as Building 18002 is no longer in proper working condition due to asbestos. Asbestos removal is expected to take 3-4 months. Additionally, repair work from Typhoon Mawar is expected to start in the next 1-2 weeks inside Building 18002 which might take 4-6 months.

Purpose: Vendor will provide 2 POS’s in support of Typhoon MAWAR Recovery Efforts. POS’s must be fully operational and turned over for government occupancy to include all anchoring blocks, cabling, interior furnishings, and safe ingress/egress as further detailed in this document, within a reasonable time from order placement.

Delivery Location: West side of Building 18002 but subject to change based on installation/hookup feasibility.

Quantities and Description: Quantities of the following types of POSs will be requested on the solicitation and will be added to the resultant contract:

Double-Wide POS:

16’x45’ Container meeting the following requirements:

Each structure shall include overhead lighting, power receptacles, adequate air conditioning and electrical systems, properly labeled central power breaker panel and three (3) inch weather protected cable access pass-through. Structures shall include a minimum of two (2) exterior exits with electronic keypad locks with one master key on each exit and exterior outdoor lighting and interior battery powered emergency exit signs. Structures shall have level flooring, a proper drainage system and shall be elevated to ensure no flooding.

Every interior section shall include locking interior access doors with electronic keypad locks, one (1) ABC fire extinguisher, a minimum of six (6) electrical power receptacles with two (2) grounded outlets each, and six (6) CAT5/CAT6 terminals with four (4) keystones per receptacles, per 645 square feet of space.

Furnishings: Each POS labeled as furnished with or without generator, or generator only in the contract, shall include the following furnishings:

Double-Wide, 16’x45’ Container with generator:

10 desks, 30 chairs, 1 microwave, 1 refrigerator, 1 generator, and 1 generator fuel tank.

Double-Wide, 16’x45’ Container without generator:

10 desks, 30 chairs, 1 microwave, and 1 refrigerator.

Double-Wide, 16’x45’ Container with generator only:

1 generator and 1 generator fuel tank.

Those line items that do not contain the label “furnished” or “generator only” in any resultant contract/award shall not contain any items listed under this section labeled as “Furnishings”

Delivery Timeframe: Deliveries will be made by vendor on multiple dates and times that will be confirmed at award. Delivery POCs will be given after contract award for coordination purposes. It is anticipated for an approximate 2 week mobilization/delivery period, however, considerations will be given for Guam Police Department (GPD) coordination, fuel issues, manpower, and equipment issues based on Typhoon MAWAR damages and recovery efforts. Dates, locations, and specifications are subject to change.

Generator Support: Vendor will provide generator(s) capable of supporting the above requested square footage of office space. It is requested that enough fuel be provided for initial turn-on/testing purposes only. Contractor shall coordinate with 36 CES for generator grounding.

Base Power Hookup: It is requested that each container be hooked up to base power since these are for long term use. It is ideal to not be reliant on generator power as to minimize fuel costs and fuel consumption. Vendor will do a quick site visit with the requesting unit and 36 CES to ensure that container can properly be hooked up to base power. 36 CES has already planned a laydown area for the containers, and this just needs to be confirmed by the vendor. Additionally, containers need to be hooked up to the temporary transformer inside Building 18002. It is requested that the vendor be able to hookup the containers and if not, do so through a subcontract.

Safety: Vendor will provide a securing mechanism that prevents damage to surrounding areas and keeps the structures in place during inclement weather or high wind conditions of 45 to 57 miles per hour.

Vendor must follow all safety and traffic procedures while operating on base.

Setup/Teardown: Customer will only support airfield gate entry during mobilization and demobilization.

Contractor must obtain EAL and airfield driver training from 36 OSS for unescorted access to container location. EAL information or copy of Base Pass information must be submitted to the Contracting Office NLT 3 days after task order award.

Inclement Weather: IAW safety standards, containers shall be secured for inclement weather.

Frequency: Vendor may make multiple pre-coordinated deliveries with designated POCs.

Additional Rental Equipment: Contractor equipment shall be clearly marked with vendor company name and contact information. Equipment must be clean upon delivery, made of quality material, and durable to withstand heavy use. Government shall return equipment in clean, fair wear and tear, and operable condition. Excessive damages and any lost or missing equipment shall be reported to Contracting Officer in writing within 10 days of demobilization. Damages, beyond fair wear and tear, must be photo documented (before and after).

Andersen AFB Emergency Evacuation of Contractor Equipment: At any time during the period of performance, the contractor may be directed by order of the 36 Wing Commander for 36 WG/CAT to demobilize/remove all equipment from the airfield and/or base. Reasons for evacuation may be typhoon, natural disaster or military/national security related. Contractor shall be required to remove all equipment in 48-hrs or less. Once emergency is resolved contractor will be notified to remobilize or if services are no longer required. Contractor will be entitled to submit and Request for Equitable Adjustment (REA) for emergency demobilization and remobilization cost.

Base Security: Base security is of the utmost importance. Contractor shall abide by all base security rules and regulations. Current 36 SFS policy directs all contractors must enter and exit through the North Gate between 0600 hours and 1800 hours, Monday through Friday. Exiting after 1800 hours is authorized through Main Gate however Contractor shall utilize the North Gate for all Mobilization/De-Mobilization of Portable Office Space. All access through North Gate outside normal operating hours must be coordinated NLT 3 duty days prior, unless it is an emergency, through the Contracting Officer, and is subject to approval by 36 SFS. If required, the Contractor must submit any Base Access Request revisions and/or renewals NLT 3 calendar days after task order award, base pass request shall be valid through the task order’s ultimate completion date to include option periods. Special exceptions for times and entry may be made during emergency response and/or recovery efforts.

Airfield Access and Driver Training: Contractor shall submit initial EAL as stated in the “Submittals” section below. Contractor shall update EAL as required and must notify the Government within 24 hours of employee termination. Personnel accessing the airfield must obtain airfield driver training from 36 OSS prior to performance, all restricted area badges must be returned to 36 SFS upon contract completion. Badges from any terminated employee shall be turned in within 5 calendar days.

Contractor Submittals

Base Access Request: Updates must be submitted to the Contracting Office NLT 3 calendar days after award (as required). If contractor does not need to make any changes an email submittal stating, “no changes required” must be submitted NLT 3 calendar days after award. The Government will not be responsible for contractor delays if contractor fails to provide information on time.

Entry Access List: Contractor shall submit the full name and Social Security number for all employees requiring airfield access to the Contracting Office, NLT 3 calendar days after task order award or notice to proceed. Government will not be responsible for contractor delays if contractor fails to provide information on time.

Mobilization Schedule: Contractor shall submit mobilization schedule NLT 3 calendar days after award to Contracting Office. Government will not be responsible for contractor delays if contractor fails to provide information on time.

Demobilization Schedule: Contractor shall submit demobilization schedule to the Contracting Office NLT 5 calendar days prior to the expiration of the period of performance. Government will not be responsible for contractor delays if contractor fails to provide information on time.

Points of Contacts:

36 LRS: SMSgt Joan Moniz - (671) 689-7602 36 CES: 2d Lt Alan Haugen – (671) 366-2542

Contract Specialist: nathaniel.entilla@us.af.mil.

Contracting Officer: donald.suver@us.af.mil

STATEMENT OF WORK FOR