Attachment 1 - Network Analyzer Software Specifications.pdf

PDF 209 KB Posted

Attached to
Solicitation - Keysight Network Analyzer Software Federal contract opportunity
Solicitation number
NB6720202301189
Issued by
Department of Commerce National Institute of Standards and Technology

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation - Keysight Network Analyzer Software, newest first.
File Type Posted
Attachment 2 - NB6720202301189 Brand Name Justification.pdf PDF
NB6720202301189 - Network Analyzer Software RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: Network Analyzer Software

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Technology Division Radio Frequency Fields Group (672.02)

General Statement of Need:

Radio Frequency Fields Group is developing techniques to use vector signal analyzers to do traceable measurements of modulated signals. In order to use the vector network analyzer for this purpose, we need to be able to change the excitation frequency of the instrument so as not to distort the wideband modulated signal being measured. The licenses being purchased will provide this new capability.

Item Specifications and Quantities:

Item 1: S930705B Modulation Distortion up to 50 GHz

Quantity: 1

Specifications: 1.1 Perpetual Software License

1.2 12 Month software support

Item 2: S94610B Digital Wideband Transceiver Analysis

Quantity: 1 Specifications: 2.1 Perpetual Software License

2.2 12 Month software support

Item 3: S93073B Digital Wideband Transceiver Interface

Quantity: 1 Specifications: 3.1 Perpetual Software License

3.2 12 Month software support

Item 4: S930905B Spectrum Analysis up to 50 GHz Quantity 1

Specifications: 4.1 Perpetual Software License

4.2 12 Month software support

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN:

Mail Stop:

325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

14 WEEKS AFTER RECEIPT OF ORDER (ARO)

☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☐ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☒ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☒ US Government Email Address for Software Delivery:

horansky@nist.gov

Installation ☒ N/A

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details] NOTE: TPOC shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☒ On-Site

☒ Acceptance Expected to Not to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training ☒ N/A

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: TPOC shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: 1 year What is included?

☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Maintenance ☐ N/A

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: 1 year What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☒ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment ☒ N/A

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .