Attachment 1 - External-Cavity Diode Lasers Specifications.pdf
PDF 263 KB Posted
- Attached to
- Sources Sought - External-Cavity Diode Lasers Federal contract opportunity
- Solicitation number
- NB6720202302154
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirements / Specification Document
TITLE: External-Cavity Diode Lasers
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Division RF Fields Group (672.02)
General Statement of Need:
The RF Fields Group (672.02) is in need of a laser system that can allow us to excite and probe atoms in the Rydberg state in cesium vapor for electrometry. This system must be a diode system that is stable and has a linewidth at or better than 300 kHz. The 510 nm laser must have a coarse tuning from 509 nm to 515 nm and power >80 mW. The 850 nm laser must be able to tune to both hyperfine split states in Cs. This corresponds to 852.347 ±5 GHz. This laser must have at least 50 mW of power. Laser control units for each laser must include the ability to lock to atomic resonances or cavity resonance.
Item Specifications and Quantities:
Item 1: 510 nm External Cavity Diode Laser Quantity: 1 EACH Specifications: 1.1 510nm
1.2 Extra cavity laser power >50 mW
1.3 Laser diode tunable from 509 nm to 513 nm
1.4 Linewidth < 300 kHz.
1.5 DLC external cavity laser controller, >500 mA output
1.6 Faraday optical isolator, 500 nm to 600 nm, cemented PBS
polarizer. >25 dB suppression. Tuned for 510 nm
1.7 Fiber output port
1.9 Ultra-low noise diode current source, < 100pA/rtHz, DC to
1MHz
1.10 Temperature stabilized by TEC
1.11 Laser controller has option for peak locking and side of fringe locking
1.12 Includes power stabilization of laser power
1.13 Frequency stability < 100 MHz/K
1.14 Laser resonator machined from a solid block for
enhanced acoustic, temperature and alignment stability and narrow linewidth
Item 2: 850 nm External-Cavity Diode Laser Quantity: 1 EACH Specifications: 2.1 850nm
2.2 Extra cavity laser power >50 mW
2.3 Laser diode tunable from 845 nm to 855 nm
2.4 Linewidth < 300 kHz.
2.5 DLC external cavity laser controller, >200 mA output
2.6 Faraday optical isolator, 500 nm to 600 nm, cemented PBS
polarizer. >35 dB suppression. Tuned for 852 nm
2.7 Fiber output port
2.8 Ultra-low noise diode current source, < 100pA/rtHz, DC to
1MHz
2.9 Temperature stabilized by TEC
2.10 Laser controller has option for peak locking and side of fringe locking
2.11 Includes power stabilization of laser power
2.12 Frequency stability < 100 MHz/K
2.13 Laser resonator machined from a solid block for
enhanced acoustic, temperature and alignment stability and narrow linewidth
[List any additional item(s) or service requirements using the same format.]
Procurement Support Information and Ancillary Services:
[Provide input for each section Below or Mark Not Applicable (N/A)]
Section Requirements/Specifications
Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Shipping & Delivery ☐ N/A
Shipping Address:
☒ NIST-Boulder
ATTN: Nikunjkumar Prajapati Mail Stop: 672.02 325 Broadway Boulder, CO 80305
☐ NIST-Gaithersburg
ATTN:
Mail Stop:
100 Bureau Dr Gaithersburg MD 20899
☐ [Alternate Shipping Address] Shipping Criteria:
☒ Partial Delivery Acceptable
☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]
Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock
Containerization Preference: [Enter Container Type] Other Requirements:
[List Any Other Requirement] Delivery Date Criteria:
☐ Delivery Shall Be Competed No Later Than:
9/1/2023 ☐ Delivery Shall Be Made No Earlier Than:
Click or tap to enter a date.
☐ Scheduled Deliveries:
Item Number Due Date
☐ Other:
[List Other Shipping, Delivery or Special Requirements.]
Electronic Media ☐ N/A
[Enter Electronic Media Requirements by Item.]
☒ Software ☒ Electronic Manuals ☒ License Key ☐ Other:
[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:
[Enter Address]
Installation ☒ N/A
[Enter Installation Requirements by Item]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter Details] NOTE: TPOC shall be the coordination POC.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers
[List Work Order Numbers]
☐ Power Available
Voltage: 120 [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]
Frequency: 60Hz [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment:Lab [Choose Environment] Other Power Considerations:
[List Any Other Power Considerations.]
☐ Utility Connections:
[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]
☐ Other Considerations:
[List Other Considerations to Ensure an Accurate Quote.]
Inspection and Acceptance ☐ N/A
[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site
☒ Acceptance Not Expected to Exceed 7 Business Days
☐ Acceptance Expected to Exceed 7 Business Days:
[Duration]
☐ Inspection and Acceptance Plan:
[Explanation]
☐ Other:
[Enter Other Requirements]
Training ☒ N/A
Training Requirements (Who, When, What, Where)
☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site
☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting
☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:
[Describe Materials] ☐ Training Materials to be Provided by Vendor:
[Describe Materials] ☐ Other [Enter Other Training Requirements] NOTE: TPOC shall be coordination POC.
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable Warranty Length: 1 [i.e. 3 - Years] What is included?
☐ Labor ☐ Parts ☐ Travel ☐ Cost and Liability for Returns
☐ Other [Enter Other Requirements]
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)
Calibration
[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Maintenance
[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables
☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals
☐ Other [Enter Other Requirements] ☐ Requirements:
[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period
Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods
Government Furnished Material / Equipment ☒ N/A
List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing
☐ Equipment which will leave Government Site
Description:
Serial Number:
NIST Property Number:
[Enter Description] [Enter Serial Number] [Enter NIST Property Number]
☐ Other: [Enter Other Details]
Travel
[Describe any Travel Requirements Per Item] ☐ Explain:
[Enter Justification / Requirement] ☐ Other:
[Enter Other Requirements]
NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .