Attachment 1 Energy Audit Master.XLSX

XLSX spreadsheet 23 KB Posted

Attached to
LED Lighting Conversion State and local contract opportunity
Solicitation number
RFB-25-BM14-0-2025/MV
Issued by
Dane County, Wisconsin

About this file

This document is an energy audit master spreadsheet for a municipal energy efficiency project across multiple facilities in Wisconsin, including Station 1, Fleet Maintenance, City Hall, Westside, Public Works, and Museum locations. The comprehensive energy audit details multiple potential improvement projects focused on lighting, HVAC equipment, water fixtures, and solar installations, with specific recommendations for LED lighting replacements, heat pump installations, water fixture upgrades, and solar panel implementations. The audit evaluates each project's annual building savings, total costs, incentives, net costs, and simple payback periods, with most projects targeting CIP (Capital Improvement Program) or BM (Building Maintenance) fund allocations for implementation between 2025-2035.

The financial analysis reveals significant potential energy savings and cost reductions, with solar installations planned for Fleet Maintenance, Public Works, and Station 1 totaling approximately $993,082.50. Each solar project demonstrates conservative annual energy savings ranging from $13,520 to $25,716, with return on investment periods between 15.4 and 16.2 years. The projects are supported by tax credits and Focus rebates, helping offset initial installation costs. Funding sources include CIP funds, tax credits, and potential grants, with specific budget allocations noted for various improvements across different municipal facilities. The audit recommends strategic upgrades that balance energy efficiency, operational improvements, and long-term cost savings.

View the file

Other files for this state and local contract opportunity

Other files attached to LED Lighting Conversion, newest first.
File Type Posted
25-BM14 Draft Contract.PDF PDF
25-BM14 LED Lighting Conversion.PDF PDF
Firestation 1 Lighting Floor Plan.PDF PDF
WCSB 1st Floor Power Area B.PDF PDF
WCSB 1st Floor Lighting Area B.PDF PDF
Firestation 1 Lighting Floor Plan 2.PDF PDF
Fleet Lighting Plan.PDF PDF
WCSB 1st Floor Light & Power Area A.PDF PDF
WCSB 2nd Floor Light & Power Area B.PDF PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENERGY EFFICIENCY

Added to 2026-2035 CIPFund via BM fund (Focus rebates)
STATION 1
ECR no.Area of WorkECR TitleReason for EvaluationAnnual Building SavingsTotal CostIncentivesNet CostsSimple Payback YearsCIP / BM FundNotes
Remove from request to Ben1LightingReplace Fluorescent Lighting with LED AlternativeInefficient Lighting$1,519$6,015$1,260$4,7553.1CIP282 lights need replacing; 50% reduction in power draw; unsure if pricing includes fixture upgrade/replacement. Already included in 2025 CIPlump sum for lighting in station 1, Fleet, Westside lighting replacements
2HVAC EquipmentReplace Furnaces with Heat Pump AlternativeInefficient Equipment$418$50,000$630$49,370118.1CIP (28/29)ECM blower motor (x4) + 3 ton HP (x2) + 6 ton HP (x2). Confirm if this unit is on the roof (Jon).
Energy efficient generator - MSA grant in 2025?Jon is requesting this for CIP 2026
3HVAC ControlImplement Demand Control Ventilation to Reduce Heating and Cooling NeedsLack of HVAC control$628$7,500$860$6,64010.6CIP (28/29)$239,803
4HVAC ControlInstall Programmable Thermostats to Reduce Heating and Cooling NeedsLack of HVAC control$95$1,100$360$7407.8BM Fund (2025)
5Water FixturesReplace Water Fixtures with Low Flow AlternativeInefficient Equipment$849$2,5703.0
Low Cost ECM Total$2,659$64,615$3,110$61,50523
FLEET MAINTENANCE
ECR no.Area of WorkECR TitleReason for EvaluationAnnual Building SavingsTotal CostIncentivesNet CostsSimple Payback YearsCIP / BM FundNotes
1LightingReplace Fluorescent Lamps with LED AlternativeInefficient Lighting$1,250$6,627$430$6,1985.0CIP80 lights need replacing; 50% reduction in power draw; unsure if pricing includes fixture upgrade/replacement. Already included in 2025 CIP
2LightingReplace Exterior CFL with LED AlternativeInefficient Lighting$103$184$48$1361.3CIP24 lights need replacing; 50% reduction in power draw; unsure if pricing includes fixture upgrade/replacement. Already included in 2025 CIP
3Lighting ControlInstall Dual Technology Occupancy Sensors in BathroomsInefficient Lighting Control$56$320$19$3015.4BM FundCan install internally w/BM staff
4HVAC equipmentReplace Hot Water Heater with Heat Pump AlternativeInefficient Equipment$81$5,700$100$5,60069.0CIP (27)The DHW heater is overdue for replacement (installed 2006). Natural gas powered DHW would cost $4500, so really there is only an increased cost of $1200 to upgrade to heat pump. Look into this - need to have regular usage of heat pump to prevent issues. Check with PD/FD on how often we use hot water heater.*did not include hot water heater upgrades in CIP
5HVAC ControlUse Demand Control Ventilation for RTUsLack of HVAC control$720$5,000$860$4,1405.8CIP (27)RTU DCV automatically adjusts the ventilation rate based on the needs of the space, optimizing energy efficiency and indoor air quality. Is this for the garage area? We believe we already have venitallation controls for offices & breakroom. ROSE TO CHECK WITH KEVIN. Lump w/city Hall
6Water FixturesReplace Water Fixtures with Low Flow AlternativeInefficient Equipment$167$6604.0
Low Cost ECM Total$2,211$17,831$1,456$16,3757.4*hot water heater heat pump upgrade for multiple facilities + HVAC controls
CITY HALL
ECR no.Area of WorkECR TitleReason for EvaluationAnnual Building SavingsTotal CostIncentivesNet CostsSimple Payback YearsCIP / BM FundNotes
1LightingInstall controls for lighting, vending and exhaust fansInefficient Lighting$482$885$155$7311.5BM FundMen & women's basement locker rooms, PD conference room, stairwell, 1st floor breakroom. Jon will look into this. Locker rooms were recently remodeled - may have lighting sensors installed. May need to contract out exhaust fans on sensors.
2HVAC EquipmentInstall a Heat Pump Type Domestic Hot Water HeaterInefficient Equipment$191$6,900$100$6,80035.6CIP2 existing water heaters. Do a bit more research. Already in CIP for 2026; $65,000 budgeted)
3HVAC EquipmentInstall a Condensing Boiler for Building Heating Hot WaterInefficient Equipment$1,918$62,000$10,000$52,00027.1CIPModulate between 90 - 180 deg F, between OAT of -20 - 60 deg F (compared to always 160F with existing unit). Scheduled for spring 2025. $236000. Highly efficient natural gas boiler.
4HVAC ControlInstall Variable Frequency Drives for HHW DistributionLack of HVAC control$311$3,092$240$2,8529.2CIP (27)Lump w/fleet
5HVAC ControlInstall Variable Frequency Drives for Cooling Tower FanLack of HVAC control$764$4,200$800$3,4004.5CIP (27)Lump w/fleet
6HVAC ControlInstall Variable Frequency Drives for AHU-1 FansLack of HVAC control$709$6,300$360$5,9408.4CIP (27)Lump w/fleet
7HVAC ControlCorrect Simulataneous Heating and Cooling with Controls ImprovementsLack of HVAC control$2,264$8,000$1,875$6,1252.7CIPHeat Pumps provide heating and cooling to office spaces through ventilation system; Perimeter radiation provides heating from boiler --> Two systems do not interact through BAS. *ALREADY CORRECTED BY HELM IN 2024*
8Water FixturesReplace Water Fixtures with Low Flow AlternativeInefficient Equipment$1,086$3,9883.7
Low Cost ECM Total$6,639$91,377$13,529$77,84811.7
WESTSIDE
ECR no.Area of WorkECR TitleReason for EvaluationAnnual Building SavingsTotal CostIncentivesNet CostsSimple Payback YearsCIP / BM FundNotes
1LightingReplace Fluorescent Lighting with LED alternative and Add Controls in Select SpacesInefficient Lighting$7,746$16,635$4,707$11,9281.5CIP555 lights need replacing; 55% reduction in power draw; unsure if pricing includes fixture upgrade/replacement. Already included in 2025 CIP
2HVAC ControlCorrect Building Heating Plant Controls to Improve OperationLack of HVAC control$6,664$9,750$0$9,7501.5CIPBoilers are capable of condensing, but are not operating that way. Johnson Controls was out recently - confirm if they fixed this (Jon).
3HVAC ControlReduce Ventilation to Community Spaces during Unoccupied PeriodsLack of HVAC control$781$3,000$430$2,5703.3CIPUse occupancy sensors to control lighting and HVAC operation - occupied / unoccupied heating and cooling setpoints; Also use to control for ventilation and compare indoor CO2 to outdoor. Lump with city hall & fleet
4HVAC ControlCorrect Chilled Water Distribution Pump OperationLack of HVAC control$191$1,500$0$1,5007.9CIPCurrent estimated wasted run-time of motor (25% loaded) - Occupied Hours below 60 deg F: 1805 hours. Johnson Controls was out recently - confirm if they fixed this (Jon).
Hot water heater replacement lumped into City hall HWH replacement. Consider heat pumps?
5Water FixturesReplace Water Fixtures with Low Flow AlternativeInefficient Equipment$2,337$4,7252.0
Low Cost ECM Total$15,381$30,885$5,137$25,7481.7
PUBLIC WORKS
ECR no.Area of WorkECR TitleReason for EvaluationAnnual Building SavingsTotal CostIncentivesNet CostsSimple Payback YearsCIP / BM FundNotes
1LightingReplace Fluorescent and Metal Halide Lamps with LED AlternativeInefficient Lighting$1,573$20,000$2,220$17,78011.3CIP 27/2893 lights need replacing; 50% reduction in power draw; unsure if pricing includes fixture upgrade/replacement.
2HVAC EquipmentReplace Gas Hot Water Heater with Heat Pump AlternativeInefficient Equipment$56$5,400$100$5,30094.0CIPAlready in CIP for 2026. lumped in with City Hall & Westside.
3HVAC ControlEnable Demand Control Ventilation for FurnacesLack of HVAC control$923$5,000$860$4,1404.5CIP (27)Lump in
4HVAC ControlInstall Dual Technology Occupancy Sensors in BathroomsLack of HVAC control$82$240$48$1922.3BM Fund1st floor men & women's bathrooms
Energy efficient windows / better insulated garage doors for 2027 already in CIP
5Water FixturesReplace Water Fixtures with Low Flow AlternativeInefficient Equipment$181$1,0906.0
Low Cost ECM Total$2,634$30,640$3,228$27,41210.4
Controls savings & cost:$4,836$34,092
MUSEUM
ECR no.Area of WorkECR TitleReason for EvaluationAnnual Building SavingsTotal CostIncentivesNet CostsSimple Payback YearsCIP / BM FundNotes
1LightingReplace Basement Lights with LED alternativeInefficient Lighting$28$1,500$33$1,46751.7BM Fund (26/27)13 lights need replacing; 50% reduction in power draw; unsure if pricing includes fixture upgrade/replacementWere these upgraded earlier this year? Our staff replaced lighting/fixtures in basement. ~6 bulbs replaced in basement; can likely do the rest in house.
2LightingInstall Dual Technology Occupancy Sensor to Control Bath Lighting and FanInefficient Lighting Control$74$470$245$2263.0BM Fund1st floor men & women's bathrooms; can install internally
3HVAC EquipmentReplace Dehumidifier with an ENERGY STAR AlternativeInefficient Equipment$67$250$0$2503.8CIP (28)Permanent system connected to furnace. Existing unit doesn't reach all basement areas where collections are stored.What type of dehumidifier is in the museum? Permanent or moveable?
4HVAC EquipmentReplace Electric Water Heater with a Heat Pump AlternativeInefficient Equipment$140$4,750$100$4,65033.2CIP (28)Items 3-5 --> $25,000
5HVAC EquipmentReplace Furnace and AC with an Air-Source Heat PumpInefficient Equipment$287$10,000$240$9,76034.0CIP (28)6 ton HP (x1)
6HVAC ControlInstall Programmable Thermostat to Operate HVAC SystemLack of HVAC control$46$200$60$1403.0BM Fundone thermostat
7Water FixturesReplace Water Fixtures with Low Flow AlternativeInefficient Equipment$147$6604.5
Low Cost ECM Total$642$17,170$678$16,49225.7

SOLAR

FLEET MAINTENANCEPUBLIC WORKSSTATION 1
Size182.5kWSize172kWSize100kW
Production239,226kWh/yrProduction227,445kWh/yrProduction125,774kWh/yr
Annual Energy Savings$ 25,716.80(conservative)Annual Energy Savings$ 24,450.34(conservative)Annual Energy Savings$ 13,520.71(conservative)
Cost$ 547,500.00(conservative)Cost$ 516,000.00(conservative)Cost$ 300,000.00(conservative)
Tax Credit$ (139,612.50)(conservative)Tax Credit$ (131,580.00)(conservative)Tax Credit$ (76,500.00)(conservative)
Focus Rebate$ (9,125.00)Focus Rebate$ (8,600.00)Focus Rebate$ (5,000.00)
TOTAL$ 398,762.50TOTAL$ 375,820.00TOTAL$ 218,500.00
ROI15.5yearsROI15.4yearsROI16.2years
Roof installed in 2007, replace in 2027Metal roof in good condition. Very long lifespan.CIP 2032 (move roof replacement to 2032 and add solar to this item.)
Fleet roof & solar replacement in 2030 CIP - $775,000Solar in CIP 2032 - $450,000 (planning/design/install)$500,000 for roof & solar (includes planning/design & installation)
*add to 2032 CIP due to uncertainty with future use case of existing PW facility
*remove duplications of roof replacements and lump in with solar installations.
$ 993,082.50
239802.75
$ 1,232,885.25