Attachment 1 - DRAFT Statement of Work.pdf

PDF 819 KB Posted

Attached to
PWT Intercom Replacement Federal contract opportunity
Solicitation number
FA9101-23-Q-INTERCOM
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This draft statement of work outlines requirements for a replacement intercom system at Arnold Air Force Base. The contractor shall provide delivery, installation, training and checkout of a red/black intercom system comprising 25 red/black user consoles, 16 industrial user consoles, and 112 total user headsets, including 32 noise-canceling headsets. The system must utilize AES 256 encryption and meet TEMPEST, DCID 6/3 and ICD 503 security standards. The contractor must submit documentation for review 30 days prior to installation, provide certifications and software 30 days in advance, and conduct training. Upon successful demonstration, the Air Force will accept the system. The contractor shall also provide a one-year warranty and two preventative maintenance visits.

View the file

Other files for this federal contract opportunity

Other files attached to PWT Intercom Replacement, newest first.
File Type Posted
Sources Sought Notice - PWT Intercom.pdf PDF
Attachment 2 - Estimated Quantities.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

16129-23-001

SOW NO. 16129-23-001

30 November 2022

STATEMENT OF WORK FOR PWT 16S, 16T, and PES

FLIGHT INTERCOM SYSTEM

ARNOLD ENGINEERING DEVELOPMENT COMPLEX

ARNOLD AIR FORCE BASE, TN 37389-9998

DISTRIBUTION STATEMENT A

Approved for Public Release

Distribution Unlimited

IRA-6546

DRAFT

DISTRIBUTION STATEMENT A

Approved for Public Release: Distribution Unlimited

IRA-6546 Table of Contents-1

Table of Contents

1. SCOPE

2. APPLICABLE DOCUMENTS

2.1 Government Documents

2.2 Non-Government Documents

3. REQUIREMENTS

3.1 Security

3.2 Existing Conditions

3.3 System Requirments

3.4 Installation

3.5 System Checkout

3.6 Training

3.7 Submittals

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-1

1 SCOPE

1.1 The Contractor shall provide for the delivery, installation, and checkout of an intercom system for the 16S and 16T Test Cells and Plenum Evacuation System (PES) at the Arnold Engineering Development Complex (AEDC) to replace the existing intercom system. The system shall be located within various areas associated with the 16S and 16T Test Cells and PES including the Control Rooms, Computer room, and other equipment spaces.

1.2 Background: The existing 16S and 16T Test Cells and PES intercom system is a non-secure system, and is incapable of encrypted voice transmission. The existing system is therefore not suitable for use on all projected test projects, and a red/black capable system is required.

(Note: the initial implementation shall be black only).

1.3 Objective: The Contractor shall provide all hardware and software required for the delivery, installation, commissioning, and checkout of a replacement intercom system for the 16S and16T Test Cells and PES at the Arnold Engineering Development Complex (AEDC).

1.4 Site Visit: A visit to AEDC to inspect the existing 16S and 16T Test Cells and PES intercom system and to verify/validate physical requirements prior to beginning design is highly encouraged.

2 APPLICABLE DOCUMENTS (The Contractor is responsible for adhering to the following documents as required)

2.1 Government Documents:

2.1.1 Arnold AFB Environmental Policy:

AAFB_ENVIRONMENTAL_COMMITMENT_STATEMENT.PDF

(defense.gov)

2.1.2 AEDC Safety, Health, and Environmental (SHE) Standards latest version, available upon request from the Contractor.

A. A10 Job Safety Analysis.

B. B1 Master Work Permit.

C. B2 Lockout Tag Out (LOTO). DRAFT https://media.defense.gov/2019/Sep/05/2002179050/-1/-1/1/AAFB_ENVIRONMENTAL_COMMITMENT_STATEMENT.PDF https://media.defense.gov/2019/Sep/05/2002179050/-1/-1/1/AAFB_ENVIRONMENTAL_COMMITMENT_STATEMENT.PDF

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-2

D. B3 Control of Hazardous Areas Using Safety Sign, Tags, and Barricades.

E. B6 Low Voltage Electrical Safety Related Work Practices.

F. D8 Portable Power Tools.

G. D10 Scaffolds.

H. E18 Managing Wastes Containing Chemical or Petroleum Products.

I. F2 Personal Protection Equipment

(PPE).

J. F5 Hazardous Noise and Hearing Conservation.

K. F6 Fall Protection.

2.1.3 Security-Related Documents:

A. Committee on National Security Systems Advisory Memorandum (CNSSAM) TEMPEST/1-13 – RED/BLACK Installation Guidance.

B. Director of Central Intelligence, Directive 6/3 (DCID 6/3) – Protecting Sensitive Compartmented Information within Information Systems.

C. Office of the Director of National Intelligence, Intelligence Community Directive 503 (ICD 503) – Intelligence Community Information Technology Systems Security Risk Management.

D. Federal Information Processing Standards Publication 197 (FIPS PUB 197) – Advanced Encryption Standard.

2.1.4 Code of Federal Regulations, latest version:

A. 7 CFR 2902 Subpart B Guidelines for Designating Biobased Products for Federal Procurement, Designated Items.

B. 29 CFR 1926.1101 Asbestos. DRAFT

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-3

C. 40 CFR 261 Identification and Listing of Hazardous Waste.

D. 40 CFR 370 EPA Hazardous Chemical Reporting and Community Right to Know Requirement.

2.2 Non-Government Documents:

2.2.1 National Fire Protection Association (NFPA) Standard:

A. NFPA 70-20 National Electrical Code (NEC).

B. NFPA 70E-18 Standard for Electrical Safety in the Workplace.

3 REQUIREMENTS

3.1 Security:

3.1.1 The 16S and 16T Control Rooms are secure areas. Contractor personnel shall require Government escort at all times when performing work inside the 16S and 16T Control Rooms, as well as other work and equipment areas associated with the 16S, 16T, and PES.

3.1.2 Supplied systems/hardware shall not contain any wireless components. If equipment contains an internal wireless component, the component shall be removed rather than disabled.

3.1.3 Intercom system computer equipment and computer operating systems, if used, must be pre-approved by the Government prior to use in the intercom system.

3.1.4 AEDC personnel will configure all operating systems, if used, IAW applicable DoD Security Technical Implemenation Guides (STIGs) prior to the installation of any 3rd Party software.

3.1.5 All Contractor supplied 3rd Party software shall be submitted to AEDC for security testing prior to installation.

3.1.6 AEDC will perform an Assured Compliance Assessment Solution (ACAS) security vulnerability scan of all IP-based system components. The Contractor will work with AEDC personnel to remediate and/or mitigate any identified security vulnerabilities. DRAFT

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-4

3.1.7 Contractor shall provide proof of software licensing ownership by AEDC for all software components.

3.1.8 All software must be capable of operating in a stand-alone network with no Internet access.

3.1.9 Contractor personnel shall not be permitted to interface with or operate Government computer equipment/networks.

3.1.10 The use of USB removable flash memory is not allowed under Air Force Security Policy. Configuration and operation of supplied hardware and/or software shall preclude the use of USB removable flash memory.

3.1.11 All Contractor personnel working at AEDC shall be US citizens. Contractor personnel must also pass a security background check for base entry.

3.1.12 AEDC will not provide the Contractor Internet access.

3.2 Existing Conditions: The Contractor shall not remove any existing equipment or wiring associated with the existing 16S, 16T, and PES intercom system. Existing equipment and wiring shall be removed by Government personnel.

3.3 System Requirements:

3.3.1 General Requirements: Contractor shall provide a red/black intercom system, as defined and specified by security-related documents listed in Section 2.1.3 of this document. The intercom system shall provide both red and black functionality from a singular input module. Intercom user console stations (“user consoles”) shall be capable of being configured into individual communications groups. Groups shall be selectable from each individual user console.

3.3.2 Input and Output Requirements: The intercom system shall meet the following design requirements for input and output:

A. Each user console shall accommodate four (4) user headsets.

B. Each user headset shall have listen and push-to-talk (PTT) capability (it is acceptable that all headsets on a single user console have listen/talk capability restricted to the same group).

C. The intercom system shall be able to utilize the existing AEDC Overhead Paging System as a voice input to the intercom system. DRAFT

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-5

D. The underlying communications architecture shall use Voice over Internet Protocol (VoIP) for signal transmission between system components. AEDC shall be responsible for providing network infrastructure to support VoIP communications between intercom consoles and the central server, and AEDC shall furnish equipment racks to house required equipment.

3.3.3 Security Requirements and Certifications: The intercom system shall meet the following security certifications and requirements:

A. The intercom system shall not utilize any permanent storage, and shall have a documented and approved Statement of Volatility.

B. The intercom system shall meet the requirements specified in the Committee on National Security Systems Advisory Memorandum (CNSSAM) TEMPEST/1-13 RED/BLACK Installation Guidance.

C. The intercom system shall meet Protection Level 4 (PL4) requirements as specified in the Director of Central Intelligence Directive 6/3 (DCID 6/3 – Protecting Sensitive Compartmented Information within Information Systems).

D. The intercom system shall meet the requirements of Office of the Director of National Intelligence Intelligence Community Directive 503 (ICD 503 – Intelligence Community Information Technology Systems Security Risk Management).

E. The intercom system shall utilize 256-bit audio encryption meeting the AES 256 standard (FIPS PUB 197: Advanced Encryption Standard).

3.3.4 Equipment Quantities: The Contractor shall provide (25) red/black intercom user consoles and (16) industrial intercom user consoles. The Contractor shall provide (112) user headsets, of which (32) user headsets must be of a noise canceling design suitable for use in high-ambient noise environments.

3.4 Installation:

3.4.1 The Contractor shall install all intercom system components, including required hardware and software, in the 16S, 16T, and PES equipment spaces as required. Comply with Appendix C, Job Conditions.

3.4.2 Safety: The Contractor shall perform all work in accordance with AEDC Safety, Health and Environmental (SHE) standards A10, B1, B2, B3, B6, D8, D10, E18, F2, F5 and F6.

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-6

3.4.3 The Contractor shall install wiring per NFPA 70.

3.4.4 The Contractor shall provide equipment with industry-standard cabling per NFPA 70 which will plug into Government-supplied industry-standard power outlets located up to six feet away from the Contractor equipment.

3.5 System Checkout:

3.5.1 The Contractor shall provide for all system checkouts required to provide for a fully functioning system and shall also demonstrate successful system operation to the Government.

3.5.2 The Contractor shall furnish all tools required to install and checkout the system.

3.5.3 Government Acceptance: The Government will accept the intercom system based on successful demonstration of operation.

3.6 Training: The Contractor shall provide on-site training on the operation and maintenance of the system for AEDC personnel including engineers, technicians, and intercom end users during the installation and training phases.

3.7 Submittals:

3.7.1 The Contractor shall submit the following documentation to the Government Representative. All measurements and data shall use US Customary Units.

A. Review Submittals: The Contractor shall submit final (100% complete) schematic drawings of the intercom installation, equipment documentation with equipment specifications, and equipment voltage and current load requirements to the Government 30 days prior to delivery of equipment. The drawings shall show all materials, dimensions, and fabrication details.

B. Certifications. Contractor shall submit required security certifications 30 days prior to installation.

C. Installation, Operation and Maintenance Manuals. Contractor shall submit equipment manuals prior to delivery of any equipment. Manuals shall include instruction books and drawings for maintenance and operation of all equipment and shall provide complete information for ordering of spare parts. Each instruction/operating book shall be logically divided into sections

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-7 or chapters separated by numbered or lettered tabs, for all system components and shall have an index listing of all components in the same order as they appear in the book.

D. Software. Contractor shall submit copies of all system software 30 days prior to installation.

E. Training Materials. Ten (10) hard copies of all training materials shall be provided when training is conducted.

F. Warranty. The Contractor shall guarantee system installations to be free of defects in materials and workmanship for a period of 1 year from the date of system commissioning. Defective materials or equipment will, at Contractor's option, be repaired or replaced at no cost to the Government during this warranty period. This coverage will include the repair or replacement of all system components as well as a minimum of two (2) preventative maintenance visits during the warranty period.

Approved for Public Release: Distribution Unlimited

IRA-6546

Appendix B-8

3.7.2 Submittal Table:

Table I. Required Submittal List

No. Section Reference Submittal Description Due 1 3.7.1.A Review Submittals 30 days prior to installation 2 3.7.1.B Certifications 30 days prior to installation 3 3.7.1.C Installation, operation and maintenance manuals Prior to Delivery to

AEDC

4 3.7.1.D Software 30 days prior to installation

5 3.7.1.E Training Materials When training is conducted

6 3.7.1.F Warranty Begins at system commissioning