Attachment 1. Scope of Work (SOW).pdf

PDF 8 MB Posted

Attached to
Roof Inspection Federal contract opportunity
Solicitation number
W912D0-20-R-0333
Issued by
Department of the Army Materiel Command Army Contracting Command

View the file

Other files for this federal contract opportunity

Other files attached to Roof Inspection, newest first.
File Type Posted
Combined_Synopsis_Roof_Insp.pdf PDF
Attachment 3. BID SCHEDULES.pdf PDF
Attachment 2- Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SERVICES

SCOPE of WORK

SEMI-ANNUAL ROOF INSPECTION

Basset Army Community Hospital

Fort Wainwright, ALASKA

17 FEBRUARY 2020

1.1. Project Summary: Provide Semi-Annual Roof Inspection, Maintenance Services and Reporting on various buildings under the responsibility of MEDDAC-AK as required in accordance with this SOW, and the attachments.

1.2. Facility: Bassett Army Community Hospital (BACH) is a 313,202 square foot combined, Patient Care and VA Clinic facility. The “Essential Facility” designation requires the hospital to withstand a 1000 year event (10.5 earth quake) and be capable of operating without any commercial utility support for 96 hours. Bach Facility Management Headquartered at Ft Wainwright (Ft WW) is also responsible for (5) other Facilities on the Ft WW Post; (1) Facility at Ft Greely Post and (4) Facilities at the Joint Base Elmendorf / Ft Richardson (JBER)

1.3. Purpose: Reroof of the BACH Facility Bldg 4076 was Completed AUG 2019. The new Carlisle Syntec Roof System carries a 20 Year Full System Warranty. The Terms of the Warranty Require a Semi-Annual Roof Inspection and Maintenance (2 Inspections per year) including Documentation of the Inspection and any Maintenance.

In addition the following list of roofs under the MEDDAC-AK Facilities are in various stages of warranty with equally important Inspection and maintenance requirements to insure the integrity and longevity of the facility roof systems.

1.3.1. Ft. WW: Bldgs. 4076, 4077, 3406, 3567, 3597, 4066

Ft Greely: Bldg. 655

JBER Bldgs. 631, 786, (47815 & 47810)

2.0 Execution: The Contractor shall provide all supervision, labor, materials, transportation, equipment ( Ladder’s, Scaffold, Manlift’s, Fall Protection) and storage as required to perform the service in accordance with the attached specifications, sound commercial practices, industry and facility standards, and applicable Manufacturers’ requirements. All work shall be accomplished in accordance with applicable federal, state, and local regulations and safety requirements.

2.1. The Contractor shall Inspect each building roof and provide detailed separate reports for each building on the form provided. Digital photos of any defects, and a minimum of 1 photo per deck area shall be provided with the report.

2.2. Initial Inspections shall occur immediately after contract award then twice annually: One as early as practical in the spring, once roof surfaces are free of all ice and snow, and not later than May 15th; and a second at the end of summer not sooner than August 30th or later than September 30th.

2.3. Contractor shall use qualified, experienced personnel to perform the inspections and maintenance. Minimum 3 Years experience in each type of Roof Installation.

2.4. Contractor shall be certified by the manufacturer of any warranted roofs, and utilize only Manufacturers approved materials for repairs.

2.5. The Contractor shall perform all service activities so as to avoid interference with the operation of the facility and the work of others. Work shall take place during regular business hours during weekdays Monday – Friday 06:30-16:30. Hours outside those parameters may be granted on prior notification and approval. Under no circumstances shall the work interfere with or delay patient care. Any work affecting Life Safety Code requirements and NFPA will require ILSMs to be implemented to mitigate these deviations during any maintenance operations.

2.6. Upon award of the contract, Contractor shall meet with the Facility Management staff / COR for a Pre-Con meeting, before beginning work.

2.7. All trash will be removed from the site on a daily basis. Upon completion of the project, all equipment, materials and any other items associated with the project will be removed from the project site. The site will be left clean.

2.8. Anything mentioned in the Scope of Work and not shown on the drawings, or shown on the drawings and not mentioned in the Scope of Work, shall be of like effect as if shown or mentioned in both.

2.9. The Contractor shall be responsible to verify all measurements and dimensions.

Contractor shall clarify with the Project Manager any discrepancies in measurements shown on the drawings. Conflict and/or clarity issues in reference to items, descriptions or drawings within and of this scope of work will be resolved with the writer of this scope.

2.10. Contractor will be required to provide documentation of Inspection and maintenance to Facilities Management (example included in attachments)

3.0 Site Security: The Contractor’s employees are required by the Anti-Terrorism – Operational Security form to receive access and general protection policy and procedures which will be provided when obtaining a permit to access post through the front gate. The Contractor’s employees and subcontractor employees requiring access to Army installations, facilities, and controlled access areas shall complete Anti- Terrorism Level I awareness training which can be accessed online at the following address: http://jko.jten.mil/courses/atl1/launch.html. The Contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee as a submittal. The Contractor’s employees and subcontractor employees requiring access to Army installations, facilities, and controlled access areas shall complete initial Operations Security (OPSEC) training which can be accessed online at http://jko.jten.mil/courses/atl1/launch.html the following address: https://securityawareness.usalearning.gov/opsec/. The Contractor shall provide certificates of completion for each affected contractor employee and subcontractor employee as a submittal. The Contractor’s personnel are also required to complete the iWATCH training which can be accessed online at the following address:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.a spx. Have employees sign attendance roster for completing the iWATCH training and provide as a submittal. The Contractor’s employees are not to divulge anything they may see or hear with regards to the activities and operations of units within the workplace or anywhere else on and off the installation. Employees are not to discuss anything they are doing on the installation to anyone that does not need to know.

4.0 Payments: Contractor shall use WAWF and Input Invoices as a 2 in1 Invoice.

5.0 Contractor Manpower Reporting: The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address https://contractormanpower.army.pentagon.mil

6.0 The required information includes:

(1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative;

(2) Contract number, including task and delivery order number;

(3) Beginning and ending dates covered by reporting period;

(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;

(5) Estimated direct labor hours (including sub-contractor);

(6) Estimated direct labor dollars paid this reporting period (including sub-contractor);

(7) Total payments (including subcontractor);

(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);

(9) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);

(10) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest City, Country, when in an overseas location, using standardized nomenclature provided on website);

(11) Presence of deployment or contingency contract language, and,

(12) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide https://securityawareness.usalearning.gov/opsec/ http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx the estimated total cost (if any) incurred to comply with this reporting requirement.

Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year.

6.0 Points of Contact:

Facility Contact Clarence G. Baysinger, PE Facility Chief

USA MEDDAC-AK

Office: 907-361-5673 clarence.g.baysinger.civ@mail.mil.

Alternate Facility Contact Greggory Atkins, Project Manager

USA MEDDAC-AK

Office: 907-361-5571 Fax: 907-361-4858 greggory.d.atkins.civ@mail.mil

Contracting Officer Representative Dawn Davids

USA MEDDAC-AK

Office: 907-361-5566 Fax: 907-361-4858 dawn.m.davids.civ@mail.mil

JBER Maintenance Supervisor David Ewings

USA MEDDAC-AK

Office: 907-384-7160 david.m.ewings.civ@mail.mil

7.0 Attachments:

1. Roof Inspection Requirements 1 Page

2. Roof Inspection Report Form 3 Pages

3. Unit Price Description 1 Page

4. Building Roof List & Information 1 Page

5. Building 4076 Ft WW Roof Drawing 2 Pages

6. Building 4077 FT WW Roof Drawing 1 Page

7. Building 3597 FT WW Roof Drawing 2 Pages

8. Building 3406 Ft WW Roof Drawing 1 Page mailto:clarence.g.baysinger.civ@mail.mil mailto:greggory.d.atkins.civ@mail.mil mailto:dawn.m.davids.civ@mail.mil mailto:david.m.ewings.civ@mail.mil

9. Building 3567 Ft WW Roof Drawing 1 Page

10. Building 4066 Ft WW Roof Drawing 2 Page

11. Building 655 FT Greely Roof Drawing 1 Page

12. Building 634 JBER Roof Plan 2 Page

13. Building 786 JBER Roof Plan 2 Page

14. Building 47815 & 810 JBER Roof Plan 3 Pages

END SCOPE

ROOF INSPECTION ITEM REQUIREMENTS

Maintenance Item Action

Drainage Inspect the roof surface to ensure free drainage. Clean accumulated dirt and debris on the roof and particularly at drain sumps and scuppers.

Insure Drain Screens are properly seated to filter debris.

Petroleum Products

Other Chemicals

Inspect for any evidence of solvent, oil or other petroleum products or chemical spills or releases.

Kitchen Exhaust Inspect the roof surface to ensure there is no evidence of expelled kitchen wastes, animal fats or vegetable oils present on the membrane.

Curbs

Inspect Curb Flashings, Outside Corners, Membrane Seams, Metal Cap Flashings and Mounted Attachments and Penetrations.

Membrane, Seams and Flashings

Inspect membrane surface, membrane seams and membrane flashings for Deterioration, fish-mouths, and adhesion Integrity. Special attention paid to Inside / Outside corners.

Foot Traffic

Inspect adhesion and placement of walk pads.

Pipe and Conduit Penetration Flashings Inspect Pipe Boots, Pourable Sealer Pockets and Pipe Wraps for fishmouths, deterioration, sealants, and clamps.

Miscellaneous Installed Items on Roof

Inspect Installed Items: Antenna, Curbs, Stairs, Ladders or Other Equipment and associated flashings for watertightness and integrity of adjacent membrane.

Metal Work

Inspect for deterioration, rust and watertightness of Metal Copings, Counter Flashings, Termination Bars, Metal Curbs and associated fasteners and sealants.

Leaks

Inspect roof surface to locate any reported active leaks and determine source. Make Temporary Repairs

Temporary Repairs

Make Temporary repairs as necessary. Use Manufacturers White or Black Lap Sealant as appropriate.

Special Items

Inspect areas from previous inspections regarding adhesion of cover boards and insulation for any increase in size.

Report Inspection Results on the Form and locate issues on the associated Roof Plan.

Provide Electronic Photos Referenced on plan of any defects and subsequent repairs.

Roofing Inspection Report Check List

Project/Building Name: Owner: __________ Work Order # Date: Start time:

End time:

Labor: (Roofers X Hours ) Roof Type: (Circle the appropriate descriptors)

Contact:_____________________________ Address: ___________________________ City _________State___Zip ______ Phone: _____________________________________________________________ Email: _________________________________

Built Up Roof Metal Shingle EPDM PVC/TPO Other

Type of Roof Deck:

Metal Wood Concrete

Other Primary Drainage:

Gutter Roof Drains Over The Edge Scuppers Other

Evidence of Deterioration NO YES (if Yes, specify location) Membrane Deterioration:

Blistering (approximately number if yes) Exposed Felts Alligator, cracking crumbling Cuts/Punctures Leaking – (how many leaks)

Metal Deterioration:

Loose Screws Rusted Panels Bent or Damaged Panels Missing Panels Loose or Missing Accessories Shingle Deterioration:

Cracked/Damaged Missing Shingles or Accessories Loose/Displaced Shingles/ Accessories

Insulation Adhesion:

Blistered Area Spongy Area Wet Area

Evidence of Deterioration NO YES (if Yes, specify location) Flashing Deterioration:

Membrane deterioration

(i.e. reinf. mesh exposed, laps/seams open…) Metal- Rust and pitting Loose or failing

Maintenance:

Trees that have fallen/damaged roof Missing Equipment/ Vent covers Leaks in drains Clogged Roof Drains/gutters Roof Area(s) Ponding water Wires on Roof Noticeable Roof Damage Miscellaneous Installed Items on Roof:

Satellite Dishes and supports HVAC Metal frames supports HVAC Equipment on curbs HVAC Screens Skylights

Emergency Smoke Hatches Stairway access to roof Roof Hatch/Scuttles Mechanical Penthouse Room Walk Pads around equipment Expansion joints Area Dividers Ladders Materials Used:

Sealants:

Polyurethane tube /ea.

Mastic Tube/ea.

EPDM: Patch-LF Cover Strip-LF

PVC: Patch-LF Cover Strip-LF

BUR Patch-LF Shingles/ea.

Fasteners/ea.

Other

Has there been Leakage? Yes No Describe Conditions when Leakage is visible?

Were any repairs performed previously and by whom?

Scope of Analysis:

Recommendation of Roof:

Additional comments:

Survey Report Completed By:

Signature: Date

SEMI-ANNUAL ROOF INSPECTION

Basset Army Community Hospital

Fort Wainwright, ALASKA

UNIT PRICE DESCRIPTION

Repair Loose/Damaged Membrane

Include demolition, disposal, cleaning, adhesive, primers, new 60 mil membrane White or Black as appropriate, EPDM Flashing as appropriate, seams, sealants, perimeter fastening, clean-up.

Replace Loose/ Damaged/Wet Insulation

Include demolition, disposal, insulation, crickets, cover-boards, adhesive, fasteners, clean-up.

Seam Repair Strip-in

Include cleaning, tapes, primers, peel and stick flashings or cover strip as appropriate, sealants, clean-up.

Apply Lap Sealant/Caulking

Include cleaning, primers, lap sealant or caulking as appropriate, clean-up.

Repair Inside/Outside Corner

Include cleaning, primers, lap sealant, peel and stick Flashing clean-up.

Replace Pipe Boot

Include demolition, disposal, cleaning, adhesive, primers, EPDM pipe flashing as appropriate, seams, sealants, clamp, fastening, clean-up.

Replace Metal Flashing 24 GA

Include demolition, disposal, matching finish, for curb, counter flashing, or coping, Wind cleats, fasteners, caulking, clean-up.

Replace Missing /Broken Drain Screen

Include removal, disposal, matching manufacturer’s replacement screen.

BUILDING WARRANTY Serial # EXPIRE MANUFACT TYPE AREA

SF

HEIGHT

AGL

ACCESS

Ft WW BACH 4076 CEP CANOPY 15 yr 10081973 2027 CARLISLE E.P.D.M. 1,860 26ft BUILDING & LADDER

Ft WW BACH 4076 ER CANOPY 10 YR x 2016 CARLISLE E.P.D.M. 3,092 18ft LADDER

Ft WW BACH 4076 MAIN ENTRANCE CANOPY 10 YR x 2016 CARLISLE E.P.D.M. 2,695 18ft LADDER

Ft WW BACH 4076 MAIN BUILDING Various Levels 45 Distinct Drainage Areas

20yr 10182217 JUN 2039 CARLISLE E.P.D.M. 170521 12-96ft BUILDING & LADDER

Ft WW PREV HEALTH 4077 MAIN BLDG 10 YR x 2015 CARLISLE E.P.D.M. 6,875 16FT LADDER

Ft WW PREV HEALTH 4077 ADDITION 15 YR 10070452 SEP 2026 CARLISLE E.P.D.M. 1,248 16FT LADDER

Ft WW VETERINARY CLINIC 3597 Clinic Side 20 yr RO 071880 SEP 2034 FIRESTONE E.P.D.M. 8,058 20ft LADDER

Ft WW VETERINARY CLINIC 3597 Warehouse Side 15 yr RO 071880 JUL2022 FIRESTONE E.P.D.M. 8,400 20ft LADDER

Ft WW MED WAREHOUSE 3567 10 YR x 2013 CARLISLE E.P.D.M. 30,615 24ft LADDER

Ft WW KAMISH 3406 MAIN BLDG 20 YR 10015770 MAY 2027 CARLISLE E.P.D.M. 28,854 18ft LADDER

Ft WW KAMISH 3406 ADDITION 15 YR 10015769 MAY 2022 CARLISLE E.P.D.M. 3,840 18ft LADDER

Ft WW BEHAVIOR HEALTH 4066 MAIN BLDG X x X X METAL 6,875 20ft LADDER

Ft WW BEHAVIOR HEALTH 4066 ADDITION X x X X METAL 2,544 14ft LADDER

Ft GREELY 655 CLINIC 20YR 10047561 SEP 2029 CARLISLE E.P.D.M. 10,228 12-26 ft LADDER

Ft GREELY 655 ATTACHED GARAGE x x x MALARKY SHINGLES 1,650 10-16ft LADDER

JBER DENTAL CLINIC 634 20 YR 41067 JUL 2027 GENFLEX E.P.D.M. ~15,600 24ft LADDER

JBER MEDICAL CLINIC 786 15 yr 10034144 SEP 2023 CARLISLE E.P.D.M. ~38,800 26ft BUILDING & LADDER

JBER VETERINARY CLINIC 47815 X X X X SHINGLES ~6,240 10FT LADDER

JBER VETERINARY STORAGE 47810 X X X X METAL ~350 10FT LADDER

JBER MEDICAL SUPPLY WAREHOUSE 800 N.I.C.

NOTE: Ladder Access is Contractor Responsibility. BACH 4076 Penthouses, Crescent Areas, and Chapel roof require Ladders for access. Main Roofs are accessible through main building stairwells to penthouse doors. JBER Bldg 786 can be accessed thru penthouse and ladder to penthouse roof.

All other buildings are ladder access only. Listed heights are approximate to top of parapet from ground level.

AREAS are horizontal surfaces to exterior edges and or parapets and do NOT include vertical wall areas. AREAS are Approximate richard.l.bienvenue Text Box Chapel richard.l.bienvenue Text Box A North richard.l.bienvenue Text Box A Intermediate Inboard richard.l.bienvenue Text Box A Intermediate Outboard richard.l.bienvenue Text Box B South richard.l.bienvenue Text Box B North richard.l.bienvenue Text Box A Lower North richard.l.bienvenue Text Box A Lower South richard.l.bienvenue Text Box P 1 richard.l.bienvenue Text Box P 2 richard.l.bienvenue Text Box P 3 richard.l.bienvenue Text Box P 4 richard.l.bienvenue Text Box ER Entrance richard.l.bienvenue Text Box A South richard.l.bienvenue Text Box A Lower

Ronald.Stephens Rectangle

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line richard.l.bienvenue Text Box

PARAPET ELEV 45'

richard.l.bienvenue Text Box

PARAPET ELEV 57'

richard.l.bienvenue Text Box

PARAPET ELEV 57'

richard.l.bienvenue Text Box

PARAPET ELEV 57'

richard.l.bienvenue Text Box

PARAPET ELEV 73'

richard.l.bienvenue Text Box

PARAPET ELEV 61'

richard.l.bienvenue Text Box

PARAPET ELEV 61'

richard.l.bienvenue Text Box

PARAPET ELEV 45'

richard.l.bienvenue Text Box

PARAPET ELEV 45'

richard.l.bienvenue Text Box

ELEVATOR ELEV 54'

richard.l.bienvenue Text Box

PARAPET ELEV 24'

richard.l.bienvenue Text Box

PARAPET ELEV 47'

richard.l.bienvenue Text Box

PARAPET ELEV 47'

richard.l.bienvenue Text Box MAIN ROOF AREAS INCLUDING THE "GREEN" ARE ACCESSABLE FROM STAIRWAYS. PENTHOUSES, CHAPEL, CANOPIES, AND ENTRYWAY ROOFS REQUIRE A LADDER FROM MAIN ROOF LEVELS AND/OR GROUND LEVEL. PARAPET HEIGHTS ABOVE DECK LEVEL VARY 1-4 FEET APPROXIMATELY.

richard.l.bienvenue Text Box

ER CANOPY

richard.l.bienvenue Rectangle richard.l.bienvenue Text Box HIGHLIGHTED BOXES INDICATE SUSPECTED AREAS OF ACCEPTABLE BUT MARGINAL ADHESION OF SUBSTRATE INSULATIONS. ANY CHANGES IN DIMENSION TO BE DOCUMENTED.

Information Only

D South richard.l.bienvenue Text Box D North richard.l.bienvenue Text Box C North richard.l.bienvenue Text Box C South richard.l.bienvenue Text Box Outer Green North E&W Half richard.l.bienvenue Text Box Outer Green South E&W Half richard.l.bienvenue Text Box Outer Green West N&S Half richard.l.bienvenue Text Box Inner Green North richard.l.bienvenue Text Box Inner Green East richard.l.bienvenue Text Box Inner Green West richard.l.bienvenue Text Box Inner Green SE richard.l.bienvenue Text Box Inner Green SW richard.l.bienvenue Text Box P 5 richard.l.bienvenue Text Box P 6 richard.l.bienvenue Text Box P 7 richard.l.bienvenue Text Box P 8 richard.l.bienvenue Text Box P 9 richard.l.bienvenue Text Box P 10 richard.l.bienvenue Text Box P 11 richard.l.bienvenue Text Box C South Crescent richard.l.bienvenue Text Box C North Crescent richard.l.bienvenue Text Box VA Entrance E richard.l.bienvenue Text Box VA Entrance W richard.l.bienvenue Text Box Main Entrance richard.l.bienvenue Callout Antenna Elev 98'

Ronald.Stephens Line

Ronald.Stephens Polygonal Line

Ronald.Stephens Polygonal Line richard.l.bienvenue Text Box

PARAPET ELEV 47'

richard.l.bienvenue Text Box

PARAPET ELEV 45'

richard.l.bienvenue Text Box

PARAPET ELEV 57'

richard.l.bienvenue Text Box

PARAPET ELEV 27'

richard.l.bienvenue Text Box

PARAPET ELEV 26'

richard.l.bienvenue Text Box

PARAPET ELEV 36'

richard.l.bienvenue Text Box

PARAPET ELEV 36'

richard.l.bienvenue Text Box

PARAPET ELEV 35'

richard.l.bienvenue Text Box

PARAPET ELEV 26'

richard.l.bienvenue Text Box

PARAPET ELEV 24'

richard.l.bienvenue Text Box

PARAPET ELEV 35'

richard.l.bienvenue Text Box

PARAPET ELEV 17'

richard.l.bienvenue Text Box

PARAPET ELEV 17'

richard.l.bienvenue Text Box

PARAPET ELEV 24'

richard.l.bienvenue Text Box

PARAPET ELEV 26'

richard.l.bienvenue Text Box

PARAPET ELEV 45'

richard.l.bienvenue Text Box

PARAPET ELEV 33'

richard.l.bienvenue Text Box

PARAPET ELEV 33'

richard.l.bienvenue Text Box

PARAPET ELEV 45'

richard.l.bienvenue Text Box

PARAPET ELEV 24'

richard.l.bienvenue Text Box

ELEVATOR ELEV 53'

richard.l.bienvenue Text Box

PARAPET ELEV 24'

richard.l.bienvenue Text Box

PARAPET ELEV 53'

richard.l.bienvenue Text Box

PARAPET ELEV 66'

richard.l.bienvenue Text Box

PARAPET ELEV 81'

richard.l.bienvenue Text Box

PARAPET ELEV 53'

richard.l.bienvenue Text Box

PARAPET ELEV 17'

richard.l.bienvenue Text Box

ENTRANCE CANOPY

richard.l.bienvenue Text Box

CEP CANOPY

Rectangle richard.l.bienvenue Polygonal Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Text Box

ADDITION

richard.l.bienvenue Line richard.l.bienvenue Distance Measurement

101.00 ft� richard.l.bienvenue Distance Measurement

42.00 ft� richard.l.bienvenue Distance Measurement

8.98 ft� richard.l.bienvenue Distance Measurement

25.02 ft� richard.l.bienvenue Distance Measurement

50.01 ft� richard.l.bienvenue Distance Measurement

71.67 ft� richard.l.bienvenue Distance Measurement

23.36 ft� richard.l.bienvenue Distance Measurement

7.33 ft�

Clinic Side

3597 Warehouse Side richard.l.bienvenue Oval richard.l.bienvenue Oval

ADDITION

Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line

4.46 in� richard.l.bienvenue Text Box 40"-0" richard.l.bienvenue Distance Measurement

6.89 in� richard.l.bienvenue Text Box 60'- 0"

4/12 slope Trusses @ 24" OC richard.l.bienvenue Distance Measurement

2.14 in� richard.l.bienvenue Text Box 34Ft richard.l.bienvenue Distance Measurement

2.14 in richard.l.bienvenue Text Box 34Ft richard.l.bienvenue Distance Measurement

2.14 in richard.l.bienvenue Text Box 20Ft richard.l.bienvenue Text Box

APPROXIMATELY 8,900 SF

EXISTING 8" BATTS APPROX R-24

INSTALL BAFFLES AT EAVES APPROXIMATELY 248 EACH

ADD BLOW IN FIBERGLASS FOR A TOTAL R-55

richard.l.bienvenue Text Box richard.l.bienvenue Text Box richard.l.bienvenue Text Box richard.l.bienvenue Text Box 16-6 richard.l.bienvenue Text Box richard.l.bienvenue Text Box richard.l.bienvenue Text Box 23-8 richard.l.bienvenue Text Box richard.l.bienvenue Text Box 18'-8" richard.l.bienvenue Text Box richard.l.bienvenue Text Box 39-6 richard.l.bienvenue Text Box richard.l.bienvenue Text Box richard.l.bienvenue Text Box richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Polygon richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Line richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Text Box

RD TYPICAL

richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Text Box 12'-9" richard.l.bienvenue Text Box 49'-4" richard.l.bienvenue Text Box 25'-6" richard.l.bienvenue Text Box richard.l.bienvenue Text Box richard.l.bienvenue Text Box 16' richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Text Box 4/12 slope richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line

Area Measurement

14518.07 sq ft richard.l.bienvenue Text Box

APPROX

15,600SF

Area Measurement

38721.94 sq ft richard.l.bienvenue Text Box

APPROX

38,800 SF

richard.l.bienvenue Text Box

JBER BLDG 47815 VETERINARY CLINIC

richard.l.bienvenue Distance Measurement

72.73 ft� richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Rectangle richard.l.bienvenue Polygon richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Text Box 60'-0" richard.l.bienvenue Text Box 25'-6" richard.l.bienvenue Text Box 72'-8" richard.l.bienvenue Text Box 26'-0" richard.l.bienvenue Text Box richard.l.bienvenue Text Box 56'-0"" richard.l.bienvenue Text Box 26'-0" richard.l.bienvenue Text Box

ROOF HAS 2 FOOT OVERHANGS AND

6/12 SLOPE

ASPHALT SHINGLES

richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Line richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Rectangle richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval richard.l.bienvenue Oval

11.98 ft richard.l.bienvenue Distance Measurement

15.66 ft richard.l.bienvenue Area Measurement

139.90 sq ft richard.l.bienvenue Text Box Sloped Metal Roof Approximately 16 x12

Map data ©2020 , Map data ©2020 20 ft

Callout Veterinary Storage BLDG 47810 Approx 12x16 Metal Roof

BACH Annual Maintenance SOW 1
1. Roof Inspection Requirements
2. Roof Inspection Report Form
Project/Building Name: Owner: __________
Type of Roof Deck:
Primary Drainage:
Evidence of Deterioration NO YES (if Yes, specify location)
Membrane Deterioration:
Evidence of Deterioration NO YES (if Yes, specify location)
Flashing Deterioration:
Maintenance:
Scope of Analysis:
3. Unit Price Description
4. Building Roof List & Information
Sheet1
5. Building 4076 Ft WW Roof Drawing
6. Building 4077 FT WW Roof Drawing
7. Building 3597 FT WW Roof Drawing
8. Building 3406 Ft WW Roof Drawing
9. Building 3567 Ft WW Roof Drawing
10. Building 4066 Ft WW Roof Drawing
11. Building 655 FT Greely Roof Drawing
12. Building 634 JBER Roof Plan
13. Building 786 JBER Roof Plan
14. Bldg 47815 & 810 JBER Roof Plan

File details come from the government source that posted it. Updated .