This performance work statement outlines requirements for installing an intrusion detection system at Andersen Air Force Base. The contractor shall provide all equipment, labor, and management to install a Vindicator intrusion detection system or equal in building 21004 for a new installation control center. Required equipment includes sensors, control panels, magnetic switches, keypads, and backup power. The contractor must be certified to install the Vindicator system, meet cybersecurity standards, and have experience with integrated base defense systems. The work shall be completed within 10 days of equipment acceptance and tested for 72 hours before acceptance. The contractor is responsible for training and documentation, and must control quality and safety during the installation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Required FAR Reps and certs.pdf | ||
| FA524020Q0086 ICC IDS (CO Signed).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1 – Performance Work Statement
PERFORMANCE BASED WORK STATEMENT
FOR
ALARM INSTALLATION SERVICES
ANDERSEN AIR FORCE BASE
PERFORMANCE WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
1 DESCRIPTION OF SERVICES 3
2 SERVICES SUMMARY 5
3 GENERAL INFORMATION 6-15
4 APPENDICES 17-24
1. DESCRIPTION OF SERVICES
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to provide and install Vindicator Intrusion Detection Systems (IDS) or Equal and Vindicator Access
Control System or Equal in building 21004 for the new Installation Control Center (ICC). The ICC building is comprised of the Command Post (CP), Emergency Operations Center (EOC), and the
Crisis Action Team (CAT). All boxes and conduit runs for the IDS are not installed. The contractor will provide training on the installed System to the Owner/User who will be operating the ICC (New
Installation Control Center).
1.1. BASIC SERVICES
Contractor is to provide and install Vindicator Intrusion Detection System (IDS) or Equal for building 21004. Procurement and installation includes sensors, control panels, Balanced Magnetic
Switches, key pads, 24 hour-battery backup power and other associated equipment. (See Appendix C for list of Intrusion Detection Equipment (IDE))
1.2. SPECIAL REQUIREMENTS.
Final testing is be the primary method the government uses to ensure contract compliance and quality assurance of IBDSS & supporting Physical Security Systems (PSS). IBDSS Testing follows PACAF
32-1075 requirements which provides a logical order for the applicable testing requirements from
AFI 31-101; ESE-TP-0023, Electronic Security Equipment Installation Acceptance Test and
Turnover Plan; UFGS 28 20 01.00 10, IC Tech Spec 705. PSS will be inspected to ensure compliance with applicable standards and to meet the more exacting performance standards that affect IBDSS from ESE-SIT-0001.
1.2.1. STANDARD INSTALLATION CONFIGURATION:
The equipment installed in building 21004 must be programmed as per manufacture standards, communication must be established with the 36 SFS/ECC Vindicator head end, IDS sensors must meet manufacture standards, tampers for the sensors will be installed, all sensors will be terminated at the Vindicator SAP and functional test to be performed before a 72 hour test is initiated.
1.2.2. IBDSS ENCLOSURE STANDARD REQUIREMENTS:
All IBDSS enclosures including, Interior Distribution Boxes (IDB) s, cabinets, and racks shall contain the following:
An isolation breaker that allows all power to the enclosure to be secured and controlled while protecting against over current. Fault isolators that protect each internal device, an internal fuse panel meets this requirement. Surge suppressor that protects the equipment IAW UFC-520-01 and is UL
1449 listed. Backup power from batteries, requirements are covered in “IBDSS
Tamper protection switches” on all doors and removable panels. Enclosures with large doors and removable panels that exceed 2.5 feet shall have two tamper switches. If the door hinge can be removed from the outside or the panel can be removed from all four corners, then two additional tamper switches are required. All internal enclosures to include; Junction boxes, Interior Field
Distribution boxes, and terminal boxes shall be of all-steel construction and meet NEMA 12 standards. The boxes shall be mechanically secured to a flat, stable surface and shall not be capable of being dislodged with reasonable human force. For reused existing infrastructure that does not have
NEMA 12 boxes, ensure all are of all-steel construction and free of open conduit knockouts. Unused knockouts shall be tack welded to the box. In areas where tack welding is not possible a reinforced sealing epoxy may be used to seal punch outs and easily removed covers.
1.2.3. IBDSS BACKUP POWER REQUIREMENTS:
The minimum power backup for all IDS is be 8 hours and must be by internal batteries or UPS.
Generator backup power may be used to complete the 8 hour requirement with a minimum of 4 hours being provided by internal batteries. If no generator backup power is available then battery backup is required to meet the full requirement. Facility Uninterrupted Power Source (UPS) is not available as a backup power source for the IDS.
1.2.4. INSTALLATION TIMELINES
1.2.4.1. EQUIPMENT. All equipment, tools, and materials needed for installation must be received by the customer no later than 30 days after notification of award of this contract. The customer, will secure these items until such time as the building is ready for installation to begin.
1.2.4.2. MOBILIZATION. The contractor must mobilize all personnel required for the installation of this requirement and arrive within 72 hours of notification that the equipment has been accepted by the government and is ready for IDS installation.
1.2.4.3. INSTALLATION. The contractor is required to install the requirement per the award document, this performance work statement, and any applicable/appropriate regulations within 10 duty days following the Governments written acceptance of all equipment. Upon completion of the install, the contractor must remain in place (on island) and accessible while the first 72-hour burn-in period testing is conducted. The contractor shall remain accountable for all IDS equipment for the first 30 days directly after the 72-hour burn-in period has been completed, in case of faulty equipment or installation. After the final 30 day period has been completed, if there are no issues with the systems or equipment; the government will then accept the install.
1.3. AS-BUILT DOCUMENTS. As built documents are available from the Command Post (366-
2055 or 366-8291). The contractor shall provide the corrected contract drawings in white paper and
2 copies of CD-ROM’s containing all drawings in electronic CADD and PDF, and all documents will be in WORD, EXCEL, or PDF formats. Prior to the 72 hour burn-in-period test, the Contractor shall provide all the approved material catalog cuts and maintenance manuals in binders for the government.
2. SERVICES SUMMARY
The Contractor service delivery requirements are summarized into performance objectives that relate directly to standards of performance required to meet mission essential needs. For the Performance
Objective to be met, service delivery must be in compliance with applicable performance standards.
The Performance Threshold describes the minimum overall levels of service delivery required for acceptable quality control. Failure to meet these Performance Thresholds means that contractor
Quality Control is unacceptable.
Performance Objective PWS Para Performance Threshold
Installation of IDS Para. 1, Para. 2 & Appendix C and D
Completed IAW Appendix D, and successfully pass burn-in with applicable standards
3. GENERAL INFORMATION
3.1. QUALITY CONTROL
The Contractor is required to control the quality of service delivery and offer to the Government for acceptance only services which conform to contract requirements. The overall control of quality must meet the specified performance thresholds for each requirement in the Services Summary.
3.1.1. Quality Control Program. The contractor shall provide a complete Quality Control Program
(QCP) to ensure the requirements of the contract are provided as specified. The contractor shall provide a QCP describing the inspection system for the requested services listed in the PWS. The contractor shall develop and implement procedures to identify, prevent and ensure non-recurrence of unacceptable services. The contractor shall submit to the Contracting Officer for review no later than
20 days after award of the service contract. The contractor shall update the plan as changes occur and changes shall be submitted for review by the Contracting Officer.
3.1.2. The contractor’s QCP shall contain, as a minimum, the following items:
3.1.2.1. A description of the inspection system to cover all services. Description shall include specifies as to the areas to be inspected on a scheduled and unscheduled basis, frequently of inspections, and the title and organizational placement of the inspector(s).
3.1.2.2. A description of the methods to be used for identifying and preventing defects in the quality of service performed.
3.1.2.3. A description of how the records will be kept. Records must document all inspections and corrective or preventive actions taken.
3.1.3. Records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
3.2. HOURS OF OPERATION
3.2.1. Normal Hours of Operation. The contractor shall perform the services required under this contract during the following hours: MON-FRI 0800-1700, except federal holidays. The contractor may work, with prior approval of the Contracting Officer, extended hours to ensure timely completion of work at no additional cost to the government.
3.2.1.1. Recognized Holidays. The contractor shall not provide service on the following days:
New Year's Day 1 January
Martin Luther King's Birthday Third Monday in January
President's Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans' Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
All PACAF Down Days.
If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.
3.3. CONSERVATION OF UTILITIES
The contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions which prevent the waste of utilities which include the following:
3.3.1. Lights shall be used only in areas where and when work is actually being performed.
3.3.2. Mechanical equipment controls for heating, ventilation, and air conditioning systems shall not be adjusted by the contractor or by contractor employees unless authorized.
3.3.3. Water faucets or valves shall be turned off after the required use has been accomplished. 3.3.4.
Government telephones shall be used only for official government business.
3.4. RECORDS
The contractor shall be responsible for creating, maintaining, and disposing of only those government required records that are specifically cited in this PWS. If requested by the Government, the contractor shall provide the original record or a reproducible copy of any such record within five working days of receipt of the request.
3.5. GOVERNMENT OBSERVATIONS
Government personnel, other than contracting officers (COs), may from time to time, with CO coordination, observe contractor operations. However, these personnel may not interfere with contractor performance or make any changes to the contract.
3.6. SAFETY REQUIREMENTS
In performing work under this contract, the contractor shall:
3.6.1. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
3.6.2. Perform work in a safe manner as required by OSHA 2206, General Industry, Occupational
Safety and Health Standards (29 CFR 1910).
3.6.3. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.
3.6.4. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
3.6.5. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
3.6.6. Record and report promptly (within one hour) to the contracting officer or designated government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
3.6.7. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the contracting officer.
3.6.8. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
3.6.9. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.
3.7. TRAINING
Refer to Appendix D.
3.8. CONTRACTOR QUALIFICATIONS
In the past five years contractor must have a comprehensive experience in design, development, integration, implementation and installation of Integrated Base Defense Security Systems (IBDSS) s with the manufacturer certifications listed and the following industry certifications:
Vindicator® certified to install and integrate the Vindicator® IDS line of products, Vindicator®
Command & Control system. Capability to install all interior and exterior sensors on the HQ
USAF/A7S, Non-Nuclear Intrusion Detection System (IDS) Equipment Approval memorandum.
Cisco certified as a Cisco Certified Network Professional (CCNP).
Underwriters Laboratory (UL) Listed Alarm system installer and service provider.
Familiar with new Risk Management Framework (RMF) for DoD Information Technology (IT) which replaces the Department of Defense Information Assurance Certification and Accreditation
Process (DIACAP). Meet all IBDSS Platform Information Technology (PIT) accreditation requirements IAW RMF and the associated National Institute of Standards and Technology (NIST) standards. Must be capable of installing the IBDSS IAW with applicable System Security Plans
(SSP) s for Vindicator®. Capable of completing an Implementation Plan and providing accreditation paperwork. Technicians must be US citizens to accomplish all IDE installation. For more information Refer to Appendix E.
3.9. CONTINUATION OF ESSENTIAL DOD CONTRACTOR SERVICES DURING
CRISIS IAW DoDI 3020.37. (MANDATORY)
IAW DoDI 3020.37 (Continuation of Essential DOD Contractor Services during a Crisis), and aforementioned Air Force implementation, it is determined that the alarm installation has been identified by the Functional Commander / Functional Director as an essential service.
3.10. PUBLICATIONS
3.10.1. Compliance with all publications, regulations and operating instructions provided by the
Government is required when:
3.10.2. They pertain to the procedures for materials expediting herein and where the contractor is authorized by the performance work statement to accomplish the work specified in the publication, regulation or operating instructions.
3.10.3. The publications prescribe USAF policies, use of materials, procedures and processes applicable to the work requirements.
3.10.4. The contractor is required to acquire and work on the latest version of the publication.
3.11. CONTRACTOR PERSONNEL
3.11.1. Contract Manager: the contractor shall provide a contract manager and alternate contract manager (responsible in the absence of the contract manager) who shall be responsible for the performance of the services. The names of the contract manager and alternate(s) shall be provided to the CO in writing prior to the beginning of the performance of installation. The contract manager and alternate(s) must be able to read, write, speak, and understand English.
3.11.1.1. The contract manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operations of this contract.
3.11.1.2 The contract manager or alternate shall be available during normal duty hours within two (2) hours to meet on the installation with government personnel (designated by the CO) to discuss problems. After normal duty hours the manager or alternate shall be available within four (4) hours.
3.11.2. Contractor Employees: the contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
3.11.2.1. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. This may be accomplished by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges, which contain the company name and employee name in
English.
3.11.2.2. The contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest. Additionally, the contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to DOD 5500-7-R Joint Ethics
Regulation. The contractor shall not employ any person who is an employee of the Department of the
Air Force if such employment would be contrary to the policies in AFI 64-106.
3.11.2.3. The contractor is cautioned that off-duty active military personnel hired under this contract may be subject to permanent change of station, change in duty hours or deployment. Military
Reservists and National Guard members may be subject to recall to active duty. The abrupt absence of these personnel could adversely affect the contractor’s ability to perform; however, their absence at any time shall not constitute an excuse for nonperformance under this contract.
4. APPENDICES
A. Acronyms & Abbreviations List
B. Estimated Workload Data
C. Required Equipment
D. Publications/Forms
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
Acronym/Abbreviation Definition
AF Air Force
AFB Air Force Base
CFR Code Federal Regulation
CO Contracting Officer
COR Contracting Officer Representative
DEPT Department
DOD Department of Defense
FAR Federal Acquisition Regulation
GR Government Representative
GFP/M Government Furnished Property/Materials
IDS Intrusion Detection System
OSHA Occupational Safety and Health Act
PBSA Performance Base Service Acquisition
PIR Passive Infa-Red
PWS Performance Based Work Statement
QA Quality Assurance
QCP Quality Control Program
SS Services Summary
USAF United States Air Force
APPENDIX B
ESTIMATED WORKLOAD DATA
Vindicator® Command and Control Platform (VCCP) v5- Version 6.5 (Windows® 7, 32 bit only) or later are required in all PACAF IBDSS installations. To ensure compatibility with the VCCP and ensure proper performance all IBDSS will use IDS equipment from the HQ USAF/A7S, Non-
Nuclear Intrusion Detection System (IDS) Equipment Approval, (Approved IDS Equipment list).
ROOM 101B (Building Entrapment Area)
1.00 Vindicator or Equal for building #21004 access
1.00 Keypad, with the capability to “buzz” (e.g. facilitate) access from both rooms 102 (Security) and 123 (EAC
Controllers)
3.00 security camera
1.00 BMS
1.00 Motion sensor
ROOM 103 (Flight Planning Room)
1.00 Keypad, with the capability to “buzz” (e.g. facilitate) access from both rooms 102 (Security) and 123 (EAC
Controllers)
1.00 Motion sensor
1.00 Security camera
CORRIDOR 104
3.00 Security camera
1.00 BMS
1.00 Motion sensor
ROOM 110 (Crisis Action Team (CAT))
12.00 Motion sensors
1.00 Keypad, with the capability to “buzz” (e.g. facilitate) access from both rooms 102 (Security) and 123 (EAC
Controllers)
ROOM (Door) 133A [Egress only]
1.00 Motion sensor
1.00 Security camera with protective weather resistant covering (if outside)
1.00 Alarm connected to SFS/ECC (BDOC)
1.00 BMS
ROOM 143 (Emergency Operations Center (EOC))
9.00 Motion sensors
1.00 Keypad, with the capability to “buzz” (e.g. facilitate) access from both rooms 102 (Security) and 123 (EAC
Controllers)
ROOM (Door) 147A [Egress only]
1.00 Motion sensor
1.00 Security camera with outer weather resistant covering (if outside)
1.00 Alarm connected to SFS/ECC (BDOC)
1.00 BMS
Room (Door) 132A [Egress only]
1.00 Motion sensor
1.00 Security camera with outer weather resistant covering (if outside)
1.00 Alarm connected to SFS/ECC (BDOC)
1.00 BMS
CORRIDOR 118
3.00 Security cameras
ROOM 124 (EAC Vault)
1.00 Vindicator or Equal
1.00 Keypad
1.00 Motion sensor
ROOM (Door) 117B
1.00 Keypad, with the capability to “buzz” (e.g. facilitate) access from room 123 (EAC Controllers) only
1.00 Security camera
ROOM 123 (EAC Controllers)
4.00 hardwire duress alarms that connect to the SFS/ECC (e.g. BDOC)
4.00 mobile duress alarm remotes that can be pressed/initiated throughout the entire building #21004.
???Number??? Multiple duress repeaters throughout building #21004 to facilitate mobile duress alarm initiation
3.00 Motion sensors
ROOM 130 (SIPR)
ROOM 131 (Radio Equip)
ROOM 129 (CP OIC)
1.00 Motion sensor
ROOM 128 (CP Super)
1.00 Motion sensor
ROOM 127 (EAC Training)
1.00 Motion sensor
ROOM 126 (Training)
1.00 Motion sensor
ROOM 122 (SORTS//Readiness)
1.00 Motion sensor
ROOM 121 (C2 Ops)
1.00 Motion sensor
ROOM 109 (SVTC Suite)
2.00 Motion sensors
ROOM 111 (TSWA)
1.00 Motion sensor
ROOM 100 (Weather Enclosure)
1.00 Security camera
ROOM (Door) 110A
1.00 Security cameras with outer weather resistant covering
ROOM 139 (Mechanical)
1.00 Security camera with outer weather resistant covering (if outside)
1.00 Keypad with the capability to “buzz” (e.g. facilitate) access from room 123 (EAC Controllers) only
1.00 Motion Detector
ROOM 141 (Mechanical Yard)
1.00 Security camera with protective weather resistant covering
COORIDOR 135
3.00 Security cameras
1.00 Keypad with the capability to “buzz” (e.g. facilitate) access from room 123 (EAC Controllers) only
1.00 Motion Detector
ROOM 134 (Generator)
1.00 Security cameras with outer weather resistant covering (if outside)
1.00 Keypad with the capability to “buzz” (e.g. facilitate) access from room 123 (EAC Controllers) only
1.00 Motion Detector
BLDG 21004
5.00 Zones that includes a badge and an individually assigned code to grant access to each authorized zone
APPENDIX C
Vindicator® Command and Control Platform (VCCP) v5- Version 6.5 (Windows® 7, 32 bit only) or later are required in all PACAF IBDSS installations. To ensure compatibility with the VCCP and ensure proper performance all IBDSS will use IDS & ACS equipment from the HQ USAF/A7S, Non- Nuclear Intrusion Detection System (IDS) Equipment Approval (Approved IDS Equipment list).
APPENDIX D
PUBLICATION/INSTRUCTIONS
2.1. DEPARTMENT OF DEFENSE SPECIFICATIONS
- UFGS Specifications are accessible to the public at http://www.wbdg.org UFGS-28 20 01.00 10, Electronic Security System, Oct 2007 UFGS-28 16 00.00 20, Basic Intrusion Detection Systems (IDS), Apr 2006 UFGS-28 16 01.00 10, Small Intrusion Detection System, Nov 2008 UFGS-28 23 23.00 10, Closed Circuit Television Systems, Feb 2011 UFGS-28 26 23, Duress Signal System (For Brig Facilities), Apr 2006 UFGS-28 05 26.00 40, Grounding and Bonding for Electronic Safety and Security, Aug 2013 UFGS-31 23 00.00 20, Excavation and Fill, Feb 2011 UFGS-27 21 10.00 40, Fiber Optic Data Transmission System, May 2013 UFGS-08 11 13, Steel Doors and Frames, Feb 2014 UFGS-08 34 53, Security Doors and Frames, Aug 2008 UFGS-08 34 73, Sound Control Door Assemblies, May 2012 UFGS-02 41 00, Demolition and/or Deconstruction, May 2010 UFGS-32 31 13.53, High-Security Chain Link Fences and Gates, Apr 2008 UFGS-26 55 53.00 40, Security Lighting, May 2011 UFGS-26 56 13.00 40, Lighting Poles and Standards, Nov 2008 UFGS-08 56 63, Detention and Security Windows, Apr 2006 UFGS-08 81 00, Glazing, Aug 2011 UFGS-08 88 53, Detention and Security Glazing, May 2011 UFGS-01 45 00.10 20, Quality Control for Minor Construction, Feb 2010
2.2. DEPARTMENT OF DEFENSE STANDARDS
- Standards are accessible to the public at: http://www.wbdg.org. FOUO Standards are available at:
https://pdc.usace.army.mil/, registration will be required.
UFC 4-021-02, Electronic Security Systems, 01 Oct 2013 UFC 4-010-05, Sensitive Compartmented Information Facilities Planning, Design, and Construction, 01 Feb 2013, with Change 1, 01 Oct 2013 UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points, 25 May UFC 3-520-01, Interior Electrical Systems, 03 Feb 2010, with Change 2, 01 Jul 2012 UFC 4-022-03, Security Fences and Gates, 01 Oct 2013 UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, 09 Feb 2012, change 1 01 Oct 2013 UFC 4-020-01, DoD, Security Engineering Facilities Planning Manual, 11 Nov 2008 UFC 4-020-02FA, Security Engineering: Concept Design (FOUO), 01 Mar 2005 UFC 4-020-03FA, Security Engineering: Final Design (FOUO), 01 Mar 2005 UFC 4-010-03, Security Engineering: Physical Security Measures for High-Risk Personnel, 02 Aug 2011
UFC 3-530-01, Design: Interior and Exterior Lighting and Controls, 22 Aug 2006, with Change 3, 01 Sep 2013 MIL-HDDK-1013/1A, Design Guidelines for Physical Security of Facilities, 15 Dec 1993 MIL-HDBK-1190, Facility Planning and Design Guides, 01 Sep 87 MIL-STD-188-124B, Grounding, Bonding and Shielding for Common Long Haul/Tactical Communication Systems Including Ground Based Communications-Electronics Facilities and Equipment’s, 01 Feb 1992, with change notice 4, 04 Apr 2013 MIL-HDBK-419A, Grounding, Bonding, and Shielding for Electronic Equipment’s and Facilities, Volume I, Basic Theory, 29 Dec 1987 MIL-HDBK-419B, Grounding, Bonding, and Shielding for Electronic Equipment’s and Facilities, Volume II, Applications, 29 Dec 1987 ETL 13-4, Engineering Technical Letter (ETL) 13-4: Standby Generator Design, Maintenance, and Testing Criteria, 18 Nov 2013 UFC 1-300-09N, Design Procedures, 25 May 2005, with Change 9, 01 Jul 2013
- Air Force publications are accessible at: http://www.e-publishing.af.mil. FOUO publications area available at: https://wmsweb.afncr.af.mil/wms/default.aspx (CAC will be required) AFI 31-101 (FOUO), Integrated Defense, 08 Oct 2009, with change 2, 07 Mar 2013 HQ PACAF Supplement to AFI 31-101 (FOUO), Integrated Defense Supplement, 11 Feb 2014 AFI 31-113 (FOUO), Installation Perimeter Access Control, 26 Jan 2012 AFI 10-207, Command Posts, 01 Feb 2012 AFI 32-1024, Standard Facility Requirements, 14 Jul 2011 AFM 32-1084, Facility Requirements, 20 Apr 2012 HQ PACAFI 32-1075, Integrated Base Defense Security System (IBDSS) Installation, Maintenance, Sustainment, Restoration and Modernization, 29 Oct 2013
- DOD publications are accessible at: http://www.dtic.mil/whs/directives/index.html DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, 24 Feb 2012, with change 2, 19 Mar 2013 DoDM 5100.76, Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives (AA&E), 17 Apr 2012 DoDI 8500.01, Cybersecurity, 14 Mar 2014 DoDI 8510.01, Risk Management Framework (RMF) for DoD Information Technology (IT), 12 Mar 2014
- Intelligence Community Publications are accessible at:
http://www.navfac.navy.mil/navfac_worldwide/specialty_centers/exwc/products_and_services/capita l_improvements/dod_lock/Documents/DirectivesandGuidance.html ICD 704, Intelligence Community Directive 704, Personnel Security Standards and Procedures Governing Eligibility for Access to Sensitive Compartmented Information and Other Controlled Access Program Information, 01 October 2008 ICD 705, Intelligence Community Directive 705, Sensitive Compartmented Information Facilities, 26 May 2010 ICS 705-1, Intelligence Community Standard Number 705-1, Physical and Technical Security Standards For Sensitive Compartmented Information Facilities, 17 Sep 2010
ICS 705-2, Intelligence Community Standard Number 705-2, Standards for the Accreditation and Reciprocal Use of Sensitive Compartmented Information, 17 Sep 2010 IC Tech Spec-for ICD/ICS 705, Technical Specifications for Construction and Management of Sensitive Compartmented Information Facilities, Version 1.2, , 23 Apr 2012
- National Institute of Standards and Technology (NIST) Federal Information Processing Standards (FIPS) standards are accessible at: www.nist.gov FIPS-197, Advanced Encryption Standard (AES), 26 Nov 2001 FIPS 140-2, Security Requirements for Cryptographic Modules, 25 May 2001, with changes up to 03 Dec 2002 HSPD-12, Homeland Security Presidential Directive 12, 27 Aug 2004 FIPS PUB 201-2, Personal Identity Verification (PIV) of Federal Employees and Contractors, Aug 2013
- Occupational Safety & Health Administration standards and publications are available at:
www.osha.gov OSHA Incorporation of General Industry Safety and Health Standards Applicable to Construction Work, Fed Register #58:35076-35306, 30 Jun 1993
- USFK instructions are available at: www.usfk.mil USFK 700-19, The Invited Contractor and Technical Representative Program, 28 Aug 2012
- USFJ instructions are available at: www.usfj.mil, under the USFJ Portal, A CAC will be required.
USFJ 64-102, United States Official Contractors and Their Employees, 01 Jul 2010
- These standards are not accessible on the internet and will be provided.
CCD for IBDSS, Capabilities Development Document for Integrated Base Defense Security System (FOUO), Increment: 1, ACAT III, 17 Feb 05 ESE-SIT-0001, Standardized Electronic Security Equipment Siting and Design Guidance for Permanent Installations (FOUO), 01 Mar 2013 ESE-TP-0023, Electronic Security Equipment Installation Acceptance Test and Turnover Plan, 01 Mar 2013 HQ USAF/A7S, Non-Nuclear Intrusion Detection System (IDS) Equipment Approval, (Approved IDS Equipment list), 29 Jan 2014 Joint Air Force - Army – Navy (JFAN 6/9) Manual, Physical Security Standards for Special Access Program Facilities, 23 March 2004, with change 1 to Annex B, 09 Dec 2004 TO 31-10-24, Installation Practices: Communications Systems Grounding, Bonding, and Shielding.28 Apr 2014 TO 31-10-34, Fiber Optic Communication Cables and Connectors, 01 Oct 1998, with change 1, 01 Jul 1999 BISS-SYS-14000B, System Specification for Alarm Set, Anti-Intrusion, Restricted Area AN/GSX-4 (Advanced Entry Control System (AECS)), 19 Aug 1996 Vindicator® Network SSP, Force Protection Branch, Electronic Systems Center (now Life Cycle Management Center (LCMC)), Honeywell Vindicator® V5 Command and Control Display Equipment (CCDE) System Security Plan (SSP), 20 Jun 2011
2.3. NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS
- National Fire Protection Association (NFPA) Codes are accessible at: www.nfpa.org
NFPA 70: National Electrical Code®, 2014 NFPA 101: Life Safety Code®, 2012
- Underwriters Laboratory® (UL®) Standards are accessible at: www.ul.com. UL® may charge for the purchase of its standards.
UL 2050, UL® Standard for Safety for National Industrial Security Systems, Fifth Edition, 05 Nov UL 634, UL® Standard for Safety for Connectors and Switches for Use with Burglar-Alarm Systems, Ninth Edition, 12 Oct 2007 UL 639, UL® Standard for Safety for Intrusion-Detection Units, Eighth Edition, 31 Aug 2007 UL 681, UL® Standard for Safety for Installation and Classification of Burglar and Holdup Alarm Systems, Fifteenth Edition, 16 Jan 2014 UL 1076, UL® Standard for Safety for Proprietary Burglar Alarm Units and Systems, Fifth Edition, 29 Sep 1995 UL 1034, UL® Standard for Burglary-Resistant Electric Locking Mechanisms, Sixth Edition, 18 May 2011 UL 294, UL® Standard for Access Control System Units, Sixth Edition, 10 May 2013 UL 1449, UL® Standard for Surge Protective Devices, Third Edition, 29 Sep 2006 UL 497, UL® Standard for Protectors for Paired-Conductor Communications Circuits, Seventh Edition, 25 Apr 2001 UL 497A, UL® Standard for Secondary Protectors for Communications Circuits, Third Edition, 20 Mar 2001 UL 497B, UL® Standard for Protectors for Data Communications and Fire-Alarm Circuits, Fourth Edition, 14 Jun 2004
- American Society of Mechanical Engineers (ASME) Drawing specifications are available at www.asme.org: ASME may charge for the purchase of its documents.
ASME Y14.100-2014, Engineering Drawing Practices, dated 2014 ASME Y14.24-2012, Types and Applications of Engineering Drawings, dated 2012 ASME Y14.31-2014, Undimensioned Drawings, dated 2014 ASME Y14.34-2013, Associated Lists, dated 2013 ASME Y14.35M-1997, Revision of Engineering Drawings and Associated Documents, dated 1997.
ASME Y14.38-2007, Abbreviations and Acronyms for Use on Drawings and Related Documents, dated 2007
File details come from the government source that posted it. Updated .