Attachment 1 - CW Fiber Laser Specifications.pdf

PDF 185 KB Posted

Attached to
Solicitation - Low Frequency Noise Continuous Wave Fiber Laser Federal contract opportunity
Solicitation number
NB6720102402822
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This document is a Requirements/Specification Document for a Low Noise Continuous Wave Fiber Laser. The National Institute of Standards and Technology (NIST) Communications Technology Laboratory requires this laser to measure precise laser heterodyne signals with high frequency stability and low noise. The key specifications include: 1550nm +/- 0.15nm center wavelength, thermal tuning range of +/- 250pm, fast wavelength modulation up to 0.4GHz, Lorentzian linewidth less than 0.1kHz, frequency noise less than 50Hz/Hz at 10Hz offset, and minimum 22mW output power. The laser must have a polarization maintaining fiber output with FC/APC connector and polarization extinction ratio greater than 20dB. Delivery shall be completed no later than a specified date. Acceptance is expected within 7 business days. There are options for up to 4 additional warranty, calibration, and maintenance periods. The procurement is being conducted via Solicitation NB6720102402822 by the Department of Commerce National Institute of Standards and Technology.

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation - Low Frequency Noise Continuous Wave Fiber Laser, newest first.
File Type Posted
NB6720102402822 - CW Fiber Laser RFQ.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: Low Frequency Noise Continuous Wave Fiber Laser

Requesting Laboratory / Division / Group:

Communications Technology Laboratory Radio Frequency Electronics Division Guided Wave Electromagnetics (672.01)

General Statement of Need:

The National Institute of Standards and Technology (NIST)/Communications Technology Laboratory (CTL) needs to measure precise laser heterodyne signals with high frequency stability and low noise. This will require a very low frequency noise fiber laser at 1550 nm.

Item Specifications and Quantities:

Item 1: Low Noise Continuous Wave Fiber Laser

Quantity: 1

Specifications: 1.1 Continuous Wave (CW) operation at 1550 +/‐ 0.15 nm center wavelength

1.2 Thermal wavelength tuning range greater than +/‐ 250 pm

around center wavelength

1.3 Fast wavelength modulation via electronic connector with

range greater than 0.4 GHz and with modulation bandwidth greater than 10 kHz

1.4 Lorentzian linewidth less than 0.1 kHz

1.5 Frequency noise less than 50 Hz/√Hz at 10 Hz offset

frequency

1.6 Frequency noise less than 10 Hz/√Hz at 100 Hz offset

frequency

1.7 Optical signal to spontaneous emission noise ratio greater than 45 dB at 50 pm resolution

1.8 22 mW or greater maximum average output power

1.9 Output power tunable from 10% or lower to 100% of

maximum average power

1.10 Constant pump current and constant output power modes

1.11 Polarization maintaining fiber output with 2 mm or 3 mm

plastic or stainless steel armored jacket and narrow key (2.0

mm) FC/APC connector aligned to fiber slow axis

1.12 Polarization extinction ratio (PER) greater than 20 dB on outputs

1.15 Laser should be a turnkey rack mountable instrument with front panel display for primary operation (i.e., turning ON/OFF, setting pump currents, enabling external modulation, and monitoring power and current settings)

[List any additional item(s) or service requirements using the same format.]

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations

☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.]

☐ US citizen required on‐site (foreign nationals require pre‐ registration 30 days prior to visit.)

☐ Vendor Representative On‐Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery

☐ N/A

Shipping Address:

☒ NIST‐Boulder ATTN: Bryan Bosworth Mail Stop: 672.01 325 Broadway Boulder, CO 80305

☐ NIST‐Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address]

Shipping Criteria:

☒ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.]

☐ Direct Delivery to OU Building Required

[Explain Need for Requirement] Building /Room Number: [Enter Building/Room Number]

☐ Building has Loading Dock Containerization Preference: [Enter Container Type]

Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☐ Delivery Shall Be Competed No Later Than:

Click or tap to enter a date.

☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media

☒ N/A [Enter Electronic Media Requirements by Item.]

☐ Software

☐ Electronic Manuals

☐ License Key

☐ Other:

[List Any Other Electronic Media Requirements]

☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site

☐ Rigging

☐ Uncrating / Unpackaging

☐ Removal of Packaging Material

☐ Equipment Set Up

☐ Start‐Up Services

☐ Turnkey Installation

☐ Other:

[Enter Details]

NOTE: SME shall be the coordination POC.

Facility / Utility Considerations

☒ N/A

[List Site Specific Utility Considerations by Item]

☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V)

Maximum Current: [Enter max current draw] (A)

Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz)

NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5‐20P)

Environment: [Choose Environment]

Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance

☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)]

☐ On‐Site

☒ Acceptance Not Expected to Exceed 7 Business Days

☐ Acceptance Expected to Exceed 7 Business Days:

[Duration]

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees]

☐ On‐Site

☐ Off‐Site Location: [Enter Location(s)]

Is Trainee Travel Required: [Choose Answer]

Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other

[Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials]

☐ Training Materials to be Provided by Vendor:

[Describe Materials]

☐ Other

[Enter Other Training Requirements]

NOTE: SME shall be coordination POC.

Warranty

☐ N/A

Base Manufacturer Warranty is acceptable

Warranty Length: [i.e. 3 ‐ Years]

What is included?

☐ Labor ☐ Parts ☐ Travel

☐ Cost and Liability for Returns

☐ Other

☐ 1 Option Period

☐ 2 Option Periods

☐ 3 Option Periods

☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 ‐ Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment

☐ Software Updates ☐ Manuals

☐ Other

[Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On‐Site Within 72 hours, etc.)

☐ 1 Option Period Length: [i.e. 1 – Year / 6 ‐ Months]

☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 ‐ Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment

☐ Software Updates ☐ Manuals

☐ Other

[Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On‐Site Within 72 hours, etc.)

☐ 1 Option Period Length: [i.e. 1 – Year / 6 ‐ Months]

☐ 2 Option Periods

Government Furnished Material / Equipment

☒ N/A

List Any Government Furnished Material / Equipment Per Item]

☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item]

☐ Explain:

[Enter Justification / Requirement]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .