Attachment 1_Costworks FY24 SOW.pdf

PDF 110 KB Posted

Attached to
CostWorks License Federal contract opportunity
Solicitation number
W911KF24Q0027
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document outlines requirements for a sole source contract renewal. The Anniston Army Depot requires the renewal of a CostWorks software subscription from RSMeans, LLC to provide cost estimation capabilities across multiple construction disciplines for 7 network users. The 1-year subscription includes access to the RSMeans 2024 database and essential software updates. The contractor must not proceed with any changes to the scope of work without authorization from the Contracting Officer in writing.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/WORK STATEMENT/SPECIFICATION

FOR

COSTWORKS SOFTWARE SUPPORT SUBSCRIPTION/LICENSES

1.0 Scope:

This specification establishes a requirement for license support for CostWorks software for United States Army, Anniston Army Depot (ANAD).

2.0 Project Description:

The Anniston Army Depot is requesting the renewal of license support for CostWorks software that Anniston Army Depot (ANAD) uses in order for Directorate of Public Works (DPW) to formulate costs for certain projects; i.e. electrical, plumbing, road construction, and mechanical.

3.0 Contractor Requirements:

3.1 The contractor shall provide 7 Network Users for the 13 software renewals for 1 Year, which includes access to RSMeans CostWorks 2024.

A. Mechanical Cost B. Electrical Cost C. Plumbing Cost D. Site Work & Landscape E. Concrete & Masonry Cost F. Facilities Construction Cost G. Life Cycle Cost Utility H. Commercial Square Foot Cost I. Heavy Construction Cost J. Facilities Maintenance & Repair K. Commercial Renovation Cost L. Assemblies Cost M. Estimator

3.2 The contractor shall provide essential software updates and patches.

4.0 Scope Changes:

The Contractor shall not proceed with any verbal or written change(s) to the scope of work from sources other than the Contracting Officer, who will provide changes in writing.

File details come from the government source that posted it. Updated .