Attachment_1_Brand_Name_Justification.pdf

PDF 426 KB Posted

Attached to
Telecom Switches for OIMT Federal contract opportunity
Solicitation number
140A1624Q0013
Issued by
Department of the Interior Bureau of Indian Affairs Central Office

About this file

This document is a sole source justification for the Department of the Interior Bureau of Indian Affairs Central Office to replace Cisco switches with new generation switches from Cisco. The agency currently uses Cisco switches across all regions and introducing a different switch architecture would limit capabilities of the existing environment and possibly cause data loss. The agency would have to develop new integration, training, configuration, and switch integration processes across multiple vendors. The requirement will be posted as an Indian Small Business Economic Enterprise set-aside solicitation for competitive quotes from ISBEE resellers for the Cisco brand hardware. The contracting officer determined the anticipated price from this sole source procurement using Cisco switches would be fair and reasonable based on previous Cisco hardware purchases.

View the file

Other files for this federal contract opportunity

Other files attached to Telecom Switches for OIMT, newest first.
File Type Posted
Sol_140A1624Q0013.pdf PDF
Attachment_2_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLE SOURCE JUSTIFICATION

SIMPLIFIED PROCEDURES FOR CERTAIN COMMERCIAL ITEMS

AUTHORITY: FAR 13.501(a), 41 U.S.C. 1901

PR/SOL/CONTRACT 40645557/140A1624Q0013

Control #24-0054

1. Identification of the agency and the contracting activity, and specific identification of the document as a “Sole Source Justification.”

Contracting Activity: This document is a justification for other than full and open competition for the Department of the Interior, Bureau of Indian Affairs, Central Office, Office of Information Management Technology (OIMT).

Nature and/or description of the action being approved.

Requirement:

New Follow-on Requirement Modification to existing order

Pricing:

Firm-Fixed Price Time & Materials Other _____________

2. A description of the supplies or services required to meet the agency’s needs (including the estimated value).

OIMT has a requirement for Cisco switch replacement. This Tech refresh is to do a complete switch refresh to new generation. Currently, DOI doesn’t have any other approved solution with other equipment.

3. An Identification of the statutory authority permitting other than full and open competition.

FAR 13.501(a), 41 U.S.C. 1901

4. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.

IA currently uses Cisco switches in every region. To introduce a different switch architecture will limit capabilities of IA current environment and possibly cause a loss of data. IA will have to develop a new integration portfolio which includes training, configuration, integration of existing and new switches, which will require engineering with multiple vendors.

5. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies.

The requirement will be posted for solicitation as an Indian Small Business Economic Enterprise (ISBEE) set aside.

6. A determination by the contracting officer that the anticipated cost to the Government will be fair and reasonable.

I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable. The contracting officer determines that the anticipated price(s) will be fair and reasonable based on adequate price competition expected to result from the solicitation, as well as a comparison with the same or similar products previously purchased.

7. A description of the market research conducted (see Part 10) and the results or a statement of the reason market research was not conducted.

Market Research indicates that several ISBEE resellers are available to submit a competitive quote for this brand name hardware.

8. Any other facts supporting the use of justification of other than full and open competition, such as:

N/A

9. A listing of the sources, if any, that expressed, in writing, an interest in the acquisition.

N/A

10. A statement of any actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.

OIMT will be encouraged to evaluate competing hardware on an annual basis.

File details come from the government source that posted it. Updated .