Attachment 02 Statement of Work.pdf

PDF 121 KB Posted

Attached to
8 foot Fans Federal contract opportunity
Solicitation number
SP330020Q0154
Issued by
Defense Logistics Agency Distribution

View the file

Other files for this federal contract opportunity

Other files attached to 8 foot Fans, newest first.
File Type Posted
CSS SP330020Q0154.pdf PDF
Attachment 01 OCONUS Shipping Instructions.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW) Fans Nineteen (19) each

Background:

a. Requiring Organization Defense Distribution Depot Yokosuka Japan (DDYJ)

b. History Machines are required to keep up with the current mission.

c. Purpose of the Statement of Work (SOW):

Purchase new fans, nineteen (19) each.

1. Scope of Work to be Performed by Contractor:

The contractor shall provide all necessary labor and material to construct nineteen (19) new fans. All equipment furnished shall be new from the manufacturer’s most current production and meet current industry standards, and conform to the best quality of materials and workmanship. Accessories not specifically mentioned herein, but necessary to furnish complete systems ready for use, shall also be included and named. All transportation/shipping and installation shall be provided by the contractor.

2. Salient Characteristics:

110 / 120 volt AC direct drive ECM motor 8ft diameter OSHA compliant cage enclosure 25ft power cord Portable mount with 4ea caster wheels

Exterior color – Manufacturer’s standard.

Warranty Coverage - Warranty coverage shall be manufacturer’s standard warranty but not less than one year parts and labor.

Operator, Parts and Service Manual(s) and Training – The contractor shall provide with delivery, one (1) complete set of manuals with each machine.

3. Definitions of Terms and Abbreviations:

a. DDYJ Defense Depot, Yokosuka, Japan

b. SOW Statement of Work

4. Description of Contractor’s Tasks:

Task 1: Fabricate and Deliver nineteen (19) each fans.

5. Certification and Acceptance:

Final acceptance of the fans will be performed by personnel at the receiving location.

6. Project Management Approach:

7. Performance and/or Delivery Schedule:

The contractor shall coordinate the delivery to the locations listed below in the quantities noted with POC’s listed below.

8. Shipping Locations

QTY: 19EA

DLA Distribution DDYJ-OKI Bldg 502, Bay 4 Camp Kinser Okinawa, JP 9012100