Attachment_001_Ghost_Structure_Painting_Specifications.pdf
PDF 167 KB Posted
- Attached to
- INDE - GHOST STRUCTURES RESTORATION Federal contract opportunity
- Solicitation number
- 140P4222R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4222R0001.pdf | ||
| Attachment_002_Ghost_Structure_Painting_Drawings.pdf | ||
| Attachment_003_DBA_PA20210003_.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEPENDENCE NATIONAL HISTORICAL PARK
RESTORATION OF GHOST STRUCTURES AT FRANKLIN COURT
SPECIFICATIONS
PREPARATION AND APPLICATION OF HIGH PERFORMANCE COATINGS ON GHOST STRUCTURES
OCTOBER 25TH, 2021
SUMMARY OF WORK
The Contractor shall restore existing “Ghost Structures” located in Franklin Court at Independence National Historical Park. Three existing Steel Structures shall be restored to match the original design. All three structures shall be surface prepped and treated with high performance coatings to meet manufacturer specifications. Locations of the structures are found in the attached plans drawings. All work shall be competed in conformance with these drawings and specifications.
PART 1: SCOPE
A. DESCRIPTION: The Contractor shall furnish all equipment and sufficient personnel to restore the Ghost Structures (i.e., materials and coatings, preparation tools and equipment necessary to perform all related work) in accordance with the specifications, and plans stated herein. Therefore, any items not specifically noted, but necessary for performance in accordance with accepted industry standards, shall be furnished under this contract.
B. GHOST STRUCTURE LOCATION: Work will be performed at Independence National Historical Park under the jurisdiction of the National Park Service, Northeast Region. The Structures are located within Franklin Court within complex developed areas with a high volume of pedestrians and vehicles occupying a dense built environment of historic and non- historic structures, utility infrastructures, and public landscape. The project is located within Franklin Court, Between 316 and 318 Market Street, Philadelphia, Pennsylvania. The entrances to the site are on the south side of Market Street through the carriageway, or the north side of Chestnut Street via Orianna Street.
Contractor has a responsibility to:
1. Furnish high-performance coatings and all equipment necessary to perform site preparation, surface cleaning, preparation and any equipment necessary to reach the heights required to perform the work.
Coatings shall be sourced from the suggested manufacturer (or approved equal) provided in within this specification. Surface preparation and application of coating material shall be performed per manufacturer specification. Contractor shall transport all necessary equipment and materials to Independence National Historical Park - (INDE) at commencement of performance of work.
2. Protect existing paving surfaces throughout the work area. There are a variety paving surfaces throughout the work area, all ground surfaces shall be protected in the vicinity of work to be performed throughout surface preparation and application of primer and additional coatings. The contractor shall provide barriers to keep visitors from entering areas directly under and around structures while work is being performed. Contractor shall erect and maintain detour signs at walkway closures.
3. Prepare Tubular Steel Ghost Structures. Surface shall be clean, dry and in sound condition. Remove all oil, dust, grease, loose rust, dirt and all other foreign materials to ensure adequate adhesion. Prime any bare steel the same day as it is cleaned or before flash rusting occurs.
4. Apply Coatings. Apply primer and additional coats per manufacturer specification.
ATTACHMENTS:
Ghost Structure Existing Conditions Plan and Photos
PART 2: GENERAL PROVISIONS
2.01 PROJECT MEETINGS
A. Preconstruction Conference: Before start of work, the Contracting Officer will arrange an on-site meeting with Contractor which may include visual inspection of the contracted work at the conclusion of the meeting. The meeting agenda will include the following at a minimum:
1. Correspondence procedures
2. Designation of responsible personnel
3. Labor standards provisions
4. Payroll reports
5. Changes
6. Payments to Contractor
7. Subcontractors
8. National Park Service regulations
9. Accident prevention program (including name of responsible Supervisor)
10. Accident reporting
11. Documents required under the contract
12. Park rules and regulations 13 Park Access
14. Working hours and days
15. Safety program (compliance with the "Accident Prevention" clause of the General Provisions)
16. Tentative work schedule
2.02 QUALITY ASSURANCE:
202.1 Professional Qualifications:
A. All work shall be under the direction and general supervision of a qualified professional who possesses verifiable experience as a full-time commercial painter. The project supervisor will submit a resume with education, experience, certifications, and any related affiliations.
B. The project supervisor shall be on the job site at all times during performance of work and shall be the primary contact with the Government's technical representative. The technical representative is responsible for inspecting the quality of ongoing work and inspecting all completed work to ensure that contract performance requirements are met.
C. All workers shall be familiar with the technical aspects and hazards of the coating operations and the equipment used in such operations. This will include all safety procedures and requisite protection devices.
D. Proper PPE (Personal Protective Equipment), will be used while on site, including, but not limited to:
hearing, eye, face, respiratory, foot, head, electric, and hand protection as needed. Also, necessary protections for equipment use (including tools, vehicles, and machinery). PPE and all required equipment used on site will meet all OSHA standards, including OSHA General Industry (29 CFR Part 1910) Standards.
E. A list of all crew supervisors and workers anticipated as part of the work - crews as well as their positions - (e.g., painter), affiliation with the company, and related training and on the job experience, shall be submitted and approved by the National Park Service.
1. Each crew shall consist of at a minimum:
a. Crew Supervisor
b. Experienced Painters
F. All workers shall be recognizable as employees of the contractor by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges which show the Contractor's company name and employee name.
G. The Contractor must submit copies of all licenses and certificates necessary for complying with Federal, State, and Municipal laws, codes, and regulations.
H. Prior to bid, the Contractor is encouraged to examine work site with Contracting Officer and/or the designated representative, to determine exact extent of work and the conditions under which this work will be performed. This site visit shall be coordinated with the CO and COR to provide any prospective Contractor the opportunity to review the proposed work in addition to any written questions submitted to the CO.
2.02.2 EQUIPMENT REQUIREMENTS:
A. All equipment must meet all federal OSHA, state and local safety requirements and must be properly licensed. This includes equipment need to perform site protection, surface preparation and coating operations in accordance with the specifications stated herein.
B. Required Equipment: At a minimum, each crew shall have access to the following equipment or equivalent.
1. Hand and power tools necessary for site protection, cleaning, surface protection and application of coatings, as well as general site.
2. Vehicle for transportation and disposal of work site waste.
C. The name or logo of the contractor must be clearly displayed on all trucks used on the job.
D. The following load restrictions shall not be exceeded:
Single Units Gross Vehicle Weight
2 axles 40,000 lbs. (18,100 kg) 3 axles 48,000 lbs. (21,800 kg) 4 axles 52,000 lbs. (23,600 kg)
Combination Units 3 axles 57,000 lbs. (25,900 kg) 4 axles 62,000 lbs. (28,100 kg) 5 or more axles 66,000 lbs. (29,900 kg)
2.02.3 REPORTS:
A. The contractor shall maintain a daily work log during performance. The work log shall include the scope of work performed in accordance with the contract bid schedule. If requested, a copy shall be filed with the COR on a weekly basis.
B. The Contractor shall recycle all waste material collected during the performance of this contract. The contractor will provide a monthly report of the volume and type of material recycled. The report will also include copies of recycling tickets indicating where the material was recycled.
2.02.4 PRE-EXISTING DAMAGE
A. In instances where the contractor finds pre-existing conditions or damage to Park resources which may reflect upon the quality of their work or cause them undue liability, the contractor shall not start work until the contractor and COR have agreed on the responsibility for these pre-existing conditions.
2.03 SCHEDULING AND COORDINATION:
A. The Contracting Officer's Representative will be responsible for acting on behalf of the Contracting Officer on all matters of work within the scope of the contract. Approval of all work beyond the scope of the contract is reserved for the Contracting Officer. The contractor is responsible for notifying the COR in writing all work that is beyond the scope of the contract. The contractor shall not perform work without a modification of the contract in place.
B. Work shall be arranged and scheduled so as not to interfere with normal activities of the Park. The contractor shall notify the Contracting Officer of the proposed work schedule, i.e. typical work day and project timetable, prior to mobilization on site. The contractor shall notify the Contracting Officer’s Representative (COR), one week prior to beginning any work on site, to allow for coordination with any public events and normal Park operations. Work shall be performed between the hours of 7:00 a.m. and 5:00 p.m., Monday through Friday, federal holidays excluded, unless authorized in writing by the COR.
With advance written notice, “No-Work” days may be established by the Park. Once work begins, the contractor is expected to be on the job site each day in which weather conditions are favorable as determined be the COR or designated Park representative until completion of the project. Work will not be conducted when weather conditions preclude safe operations, such as high winds, moderate to heavy precipitation, slick surfaces due to rainy conditions, and low light levels. Extended daylight hours may be approved by the CO upon request in writing and with 48 hours’ notice.
1. Contractor shall clean site of all work debris and leave site in a neat and orderly appearance for the duration of any stop work period.
C. Work shall be scheduled and arranged so as not to interfere with or normal activities of the Park. The Contractor shall notify the Contracting Officer of the proposed work schedule, i.e., typical workday and project task timetable, prior to mobilization on site. This is to aid NPS Law Enforcement staff in monitoring the site. The Contractor shall notify the Contracting Officer’s Representative (COR) whenever work will take place on the site so that the work can be monitored and to allow for coordination with Park operations.
Advanced notice will be given to the contractor if a conflict is expected. Any debris, personnel, or equipment that would interfere with an activity or event shall be removed prior to the activity. The Contractor will be responsible for coordinating with the City of Philadelphia and for any and all permits and associated expenses.
D. All work within the area specified on the plans shall be completed, inspected, and accepted in accordance with the procedures stated herein upon completion.
F. If, at any time, the COR determines that the work is being conducted in an unsafe manner, the contractor will be notified by the Contracting Officer to immediately cease all work activities.
2.04 SAFETY:
A. All operations will follow all Federal, OSHA, State and Local safety requirements.
B. Employees shall wear reflective, bright orange vests while conducting operations in or adjacent to roadways.
D. Safety Plan. Before on-site work begins, submit for approval an accident prevention program. The Contracting Officer will review the proposed program for compliance with OSHA and project requirements.
The program shall include:
1. Name of responsible supervisor to ensure program compliance.
2. Outline of the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor’s employees.
E. Accident Reporting:
1. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 days of a reportable accident, send a report of the accident to the Contracting Officer.
F. All Other Accidents: The Contractor shall report all other accidents to the Contracting Officer as soon as possible and assist the Contracting Officer and other officials as required in the investigation of the accident.
2.05 WORK AREA:
A. ACCESS: Access to Franklin Court is limited to the carriageway on the southern side of Market Street.
Contractor shall coordinate access with COR 48 hours in advance.
There is no vehicular access to Franklin Court.
The contractor shall at all times conduct their operations to insure the least inconvenience to the public and Park operations. Blocking of walkways and sidewalks along the street must be kept to a minimum. While walks are to be blocked, signage necessary to direct pedestrians around the obstruction safely will be required. Keep a minimum of two rolls of warning tape on site at all times. There shall be no deviation from the specifications regarding the safety of the Park's staff or visitors. In the event of such an occurrence, the CO will review and determine the timeframe for Contractor compliance. See Section O. below for loading and unloading requirements.
B. PARKING: It is important that the historic scene in the Park be preserved for the enjoyment of the Park’s visitors. For that reason, there is no on-site parking. No parking is allowed on any Park property except to load and unload vehicles. The Contracting Officer’s Representative will provide a Park unloading permit for this purpose. Failure to remove Contractor vehicles after unloading could result in vehicles being ticketed or towed. Only vehicles that are actively employed in loading and unloading of tools or materials are allowed on site. For a possible street parking permit, which allows parking at legal metered spaces, contact the Philadelphia Parking Authority.
C. STORAGE: All tools and equipment shall be stored in the vicinity of the Ghost structure where work is being performed.
D. CONDUCT: Contractor shall at all times conduct operations to ensure the least inconvenience to occupants and visitors.
1. Contractor will clean site of all construction debris and leave site in a neat and orderly appearance with walkways clean and clear at the end of each work day.
2. Loud noise will be kept at a minimum.
E. RESTROOMS: No private restroom facility is available onsite for the contractor’s use. When the Park is open, public restrooms are available in the Independence Visitor Center, which is located at 599 Market Street.
F. TELEPHONE: No telephone service is available on site for the contractor’s use.
G. ELECTRIC: Government will not provide connections to existing electrical facilities. COR shall review and approve all electric connections prior to any electric hookups.
H. WATER: Water may be available in hose bib attachments. Hose bibs are located on the south side of 320 Market Street beneath the water fountain, and one near the north entrance door to the Benjamin Franklin Museum COR shall review and approve all water connections prior to any water hookups.
I. FIRE PREVENTION AND PROTECTION:
1. Responsible Person: A capable and qualified person shall be placed in charge of fire protection. The responsibilities shall include locating and maintaining fire protective equipment and establishing and maintaining safe procedures.
2. Hazard Control: Take all necessary precautions to prevent fire during construction. Keep flammable substances or materials at a safe distance from use of volatile or noxious substances.
3. Smoking is prohibited in the work areas in sites designated for the contractor’s use. Designate a space away from the work area be used for smoking. Cigarette butts must be disposed of properly.
4. Protection Equipment Required: Furnish a minimum of one extinguisher for each 1,500 square feet of area or major fraction thereof and a sufficient number to meet the requirement that a travel distance from any workstation to the nearest extinguisher shall not exceed 75 feet. Fire extinguisher shall be of type and size appropriate for the work but no less than 10lb.
J. BARRIERS:
1. Furnish, install, and maintain barriers to protect existing facilities and the public from work operations.
Fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry to the work area and to protect the general public from the construction work.
a. Visitors must be kept a safe distance from construction areas. The Contractor shall provide and maintain barricades between work areas and egress routes. All barricade locations shall be coordinated with Park’s Safety Officer.
b. Fences and barriers shall be structurally adequate and neat in appearance. Fences and barriers shall not injure vegetation, paving or walls.
c. If traffic lane closures are necessary, Contractor shall erect and maintain barricades, lights, danger signals, and warning signs in accordance with ANSI D6.1-78. Barricades and signs shall conform to ANSI D6.1-78, “Manual on Uniform Traffic Control Devices” (MUTCD), Part VI.
d. Barrier tape shall be imprinted with “CAUTION: CONSTRUCTION AREA”. Install where directed by the COR to insure safe conditions. Keep a minimum of two rolls on site at all times. Direct pedestrians away from work areas.
2. Post signage to route pedestrians around work.
3. Protect pedestrian traffic by guardrails or fences.
4. Cover pipes, hoses, and power lines crossing sidewalks and walkways with troughs using beveled edge boards.
5. Removal: Completely remove barriers no longer needed and when approved by CO.
K. TEMPORARY CONTROLS:
1. Housekeeping:
a. Keep project neat, orderly, and in a safe condition at all times. The contractor is required to furnish all labor, materials, and equipment for daily cleanup and restoration of all disturbed areas or features, and be prepared to sweep and wash paved surfaces daily.
b. Wet down dry materials and rubbish to prevent blowing dust.
c. Keep volatile wastes in covered containers.
L. DISPOSAL:
1. Unless otherwise specified, all removed material becomes the property of the contractor and shall be recycled or disposed of outside the park. The contractor shall immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the park.
2. Do not burn or bury refuse inside the park.
M. EXISTING CONDITIONS: Protect all sidewalks, curbs, manholes, landscape features, buildings and other built features from potential damage resulting from the work of this Project.
N. LOADING: If it is necessary to unload and load or otherwise use vehicles on sidewalks or walkways, the following requirements shall be met:
1. All vehicles shall not exceed a gross weight of 10,000 pounds.
2. All vehicles are required to use pneumatic tires.
3. The contractor will be held responsible for the protection of the pavement, including the brick and stone sidewalks and curbing, and will be held accountable for any damage that occurs as a direct result of the work. Any vehicles that exceed a gross weight of 10,000 pounds must use the protection described below. Using this method does not relieve the Contractor of responsibility to protect the pavement surfaces or to repair any damage.
a. One layer of ¾” plywood, with a layer of 2” rigid foam underneath, laid in such a manner that the surface of the paved area is covered to all extents of its surface.
b. When it becomes apparent that the rigid insulation has become compressed to a height that is less than half its original thickness, or to an extent that the rigid insulation is not protecting the paving, it is to be replaced as described above.
O. PRESERVATION OF NATURAL FEATURES: Confine all operations to work limits of the project.
Prevent damage to all planted vegetation areas, including all beds, containers, shrubs, understory and canopy trees, and turf.
1. Provide temporary barriers to protect existing trees and plants and root zones as directed by contracting officer.
2. Do not tie back, injure remove, or destroy trees or other plants without prior approval. Consult with
Contracting Officer on roots and branches that interfere with project. No roots or branches may be removed without permission of the contracting officer.
3. Do not store equipment, construction materials, excavated material or debris on lawn areas, plant beds, or any unpaved areas except as directed by Contracting Officer. If storage in these areas is approved by the Contracting Officer, 3/4˝plywood must be laid down on all areas before any item is placed.
4. Do not drive vehicles or create pathways on lawn areas, plant beds and tree root protection areas or any unpaved areas except as directed by Contracting Officer. The root protection area is defined as an area equal to a radius of 1.5 feet for each inch of diameter at breast height (dbh) (e.g., a 10 inch dbh tree will have a root protection area equal to 15 feet from the main trunk in all directions). If vehicle traffic or pathway is needed in these areas and approved by the Contracting Officer, 3/4inch plywood must be laid down on all areas before any vehicle is allowed or pathway created.
2.06 AIR AND WATER POLLUTION CONTROL:
A. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
B. Do not dispose of volatile wastes or oils in storm or sanitary drains.
PART 3: EXECUTION
3.01 SITE PROTECTION
3.01.1 Scope
A. The work to be performed under this section shall include preparing and protecting existing conditions within Franklin Court.
3.01.2 General Requirements
A. Cover and protect finished work and surfaces not to be painted. Use drop cloths of adequate size and material to protect areas below painting operations and adjacent areas. Use wood planking under ladders, hooks and scaffold supports to avoid damaging paved court surfaces and painted surfaces of the steel frames.
3.02 SURFACE PREPARATION
3.02.1 Scope
The work to be performed under this section shall include preparation of “Ghost Structure” surfaces.
3.02.2 General Requirements
A. Clean all existing surfaces to remove, dust, dirt grease and oil from existing Ghost Structure Surfaces.
3.02.3 Execution
A. Use hand tools, power tools or other manual methods of cleaning to remove peeling coatings.
B. The Contractor shall wear a NOISH approved respirator at all times during surface preparation operations.
C. After preparing the structure surfaces clean areas carefully with a HEPA Vacuum and wet mop, as historic coatings may contain lead. See www.epa.gov/lead for more information on how to protect yourself.
C. Spot prime all areas where bare metal has become exposed with primer and allow to dry thoroughly before recoating.
D. Upon completion of surface preparation, a qualified representative of the paint manufacturer shall inspect and accept the surface and shall be inspected and approved by the COR.
3.03 SURFACE COATING
3.03.1 PAINT
A. Contractor is responsible for determining required quantities of various primer and finish coats to complete the work as specified.
B. Paint and Finished Products: The paint system specified in this section is based on products manufactured by Benjamin Moore & Co. 101 Paragon Drive, Montvale, NJ 07645 Tel: 866-708-9180. Other manufacturer’s products may be used provided they are approved as equals. Provided primers and undercoats shall be produced by the same manufacturer as finish coats. Approved paint system shall be applied per manufacturer’s specification.
3.03.2 PAINT SYSTEM
A. Exterior Metals:
1. First Coat: Corotech V160 Tolerant Surface Epoxy Mastic
2. Second and Third Coat: Corotech Arcrylic Urethane Semi Gloss V510
B. Custom Color:
1. Munsell Color 7 YR 7/1.5: selected contractor will be provided with a Munsell Color swatch and shall proved a sample of the intended color to be approved by the COR.
3.03.3 EXECUTION:
A. Use all material in accordance with the directions of the approved manufacturer, subject to the approval of the Contracting Officer. Contractor is responsible for supplying all paint.
B. Employ only experienced and competent painters. Assume all responsibility for the work, and repair all damage to the painting work by whomsoever caused.
C. Allow drying time as conditions warrant, assuring that all coasts are perfectly dry before applying succeeding coats.
D. Apply per manufacturer’s specification to completely cover all the surfaces to provide an opaque, uniform finish preventing runs and other defects.
E. Finished surfaces shall be uniform in finish and color.
Should workmanship be found defective, proper preparatory work shall be done and additional coats applied as necessary to give a finish in accordance with specified requirements.
F. A sample area shall be provided in an inconspicuous area of a Ghost Structure to demonstrate the intended complete finish for the final work product and shall be inspected by the paint manufacturers representative and approved by the COR and prior to final surface coating.
3.03.4 CLEANUP:
A. Protect all surfaces and surrounding area from paint dropping. Furnish and lay drop cloths in all areas where a painter’s finish work is being done to protect surface under work area.
B. Remove all discarded materials cans, and rags from the site and clean up loose paint and other debris at end of each workday
C. The work sites at completion of work shall be thoroughly cleaned so that area is ready for immediate use.
PART 4: ACCEPTANCE AND PAYMENT
4.01 ACCEPTANCE
A. The Contractor shall include with all invoices for payment an Acceptance Report signed by the Contractor's
Project Supervisor and the designated park representative that all work partially or completely performed conforms to contract requirements. In the event that the designated park representative and the Contractor disagree on work completed and accepted, his or her comments shall be noted thereon or attached thereto.
The Acceptance Report will serve to document in writing completed work and/or deficiencies and to determine whether the provisions for the deduction clause applies.
B. Failure of the contractor to obtain signed inspection and acceptance reports will release the Government from any obligation to pay for services claimed but not documented by a signed inspection and acceptance report.
4.02 PAYMENT
A. The amount to be paid will be based on the actual bid items completed and accepted. Quantities so measured will be paid for at the specified item bid price.
B. The National Park Service reserves the right to conduct any testing or inspection it may deem advisable prior to payment to assure that all work conforms to the specifications herein.
C. Invoices shall be submitted through IPP.