Attachment 0002 Scope of Work (SOW).docx.pdf
PDF 111 KB Posted
- Attached to
- MULIPLE PAINT REQUIREMENTS CONTRACT Federal contract opportunity
- Solicitation number
- W9098S-21-Q-0006_Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 0001 (PAINT INVENTORY PRICING SHEET).xls | XLS spreadsheet | |
| W9098S-21-Q-0006 Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK FOR RIA JMTC PAINT SUPPLY
1. REQUIREMENT
A. RIA/JMTC has a need to purchase various paints, paint kits, primer, and coatings to paint all vehicles, weapon systems, and related hardware. To ensure quality all paint will be purchased from awarded vendor. The vendor must provide all products specified in Attachment 0001. This contract will be a requirements contract for an estimated $4,000,000 for the 5 year term. There will not be a guaranteed minimum purchase.
B. The following military specifications are currently being used at RIA/JMTC:
MIL-DTL-53072
MIL-DTL-53039
MIL-DTL-64159
MIL-DTL-53022
MIL-DTL-53030
MIL-PRF-22750
MIL-PRF-32550
MIL-DTL-24441
MIL-P-14105
A-A-59166
C. Viscosities of paint will need to be within HVLP recommended spraying levels.
D. IAW MIL-DTL-53072 all primers and topcoats in the CARC system are QPD items. Certification from the primer or topcoat manufacturer shall include a copy of all quality conformance tests as well as a copy of the
Army’s validation for the topcoat of the spectral and specular reflectance characteristics of the paint lot when required by the applicable specification. All primers and paints identified on the Attachment 0001 must be IAW with applicable QPLs.
2. ACCEPTANCE. Vendor will be required to furnish the items listed on in the attached Pricing Sheet
(Attachment 0001) at the prices quoted for each ordering period, when ordered by an Authorized Purchaser from
RIA/JMTC. At the time of delivery, each type of paint will have a minimum of 70% shelf life left.
3. DELIVERY AND SHIPPING INFORMATION.
A. Each Delivery/Packing Slip/Ticket must contain the following information:
(1) Vendor Name
(2) Date of Purchase
(3) Itemized List of Supplies
(4) Quantity
(5) Delivery Order Number
File details come from the government source that posted it. Updated .